00:04 24 Dec 24
Project:
7939 Binwa-IV Hydro Electric Project
- Request for post-registration changes
Project | 7939 Binwa-IV Hydro Electric Project |
---|---|
PRC ref | PRC-7939-001 |
Process track | Issuance |
DOE | BVI |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 01 Dec 13 - 30 Nov 20 |
Assessment opinion | Assessment opinion (195 KB) |
Revised PDD | Revised PDD (1466 KB) Revised PDD - track changes (1697 KB) |
Supplementary documents | |
Signed form | Signed form (472 KB) |
DOE clarification | |
VVS version | VVS-PA 3.0 |
Current status | 11 Nov 22 -
Approved
Effective approval date: 11 Nov 22
|
Historic statuses |
13 Oct 22 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: