Project: 6161 Renewable Energy PoA in India - Request for post-registration changes
Project 6161 Renewable Energy PoA in India
PRC ref PRC-6161-002
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on:
Applicable crediting period 24 Sep 12 - 23 Sep 19
Assessment opinion Assessment opinion (146 KB)
Revised PDD Revised PDD (1182 KB)   Revised PDD - track changes (1219 KB)
Supplementary documents Appendix 1 - CPA_DD_DMRC_ER Sheet_2019_08_12.xlsx (79 KB)
Signed form Signed form (57 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 27 Sep 19 - Approved
Effective approval date: 26 Sep 19
Historic statuses 29 Jul 19 - Published
09 Aug 19 - Awaiting DOE clarifications
23 Aug 19 - DOE clarifications received
23 Aug 19 - Summary note being prepared
06 Sep 19 - Awaiting EB decision