22:46 31 Oct 25
			
			
      Project:
      10116 Small Hydropower Programme in Colombia
      - Request for post-registration changes
    
					| Project | 10116 Small Hydropower Programme in Colombia | 
|---|---|
| PRC ref | PRC-10116-001 | 
| Process track | Prior approval | 
| DOE | Earthood | 
| Methodology(ies) and/or Standardized Baseline(s) applied at the post-registration changes | No changes | 
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above | 
| Type of submission | Corrections that do not affect project design 
 | 
| Applicable crediting period | 09 Jun 15 - 08 Jun 22 | 
| Assessment opinion |  Assessment opinion (232 KB) | 
| Revised PDD |  Revised PDD (441 KB)  Revised PDD - track changes (562 KB) | 
| Supplementary documents | |
| Signed form |  Signed form (114 KB) | 
| DOE clarification |  DOE clarification 1 - 10116 PoA-DD_Small Hydropower Programme in Colombia track changes.pdf (562 KB)  DOE clarification 2 - 10116 PoA-DD_Small Hydropower Programme in Colombia clean.pdf (503 KB)  DOE clarification 3 - 10116 CDM.VAL.21.003_FAssesment on PRC PoA Small Hydro_v_1.1.pdf (268 KB)  DOE clarification 4 - 10116 Reg_form17v8.pdf (124 KB) | 
| VVS version | VVS-PoA 2.0 | 
| Current status | 18 Jun 21 -
                      Approved 
              Effective approval date: 17 Jun 21
             | 
| Historic statuses | 26 Apr 21 -
                Published 11 May 21 - Awaiting DOE clarifications 14 May 21 - DOE clarifications received 14 May 21 - Summary note being prepared 28 May 21 - Awaiting EB decision | 

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: