12:20 27 Dec 24
Project:
10116 Small Hydropower Programme in Colombia
- Request for post-registration changes
Project | 10116 Small Hydropower Programme in Colombia |
---|---|
PRC ref | PRC-10116-001 |
Process track | Prior approval |
DOE | Earthood |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
No changes |
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | Prior to commencement of a verification for the project activity or PoA stated above |
Type of submission |
Corrections that do not affect project design
|
Applicable crediting period | 09 Jun 15 - 08 Jun 22 |
Assessment opinion | Assessment opinion (232 KB) |
Revised PDD | Revised PDD (441 KB) Revised PDD - track changes (562 KB) |
Supplementary documents | |
Signed form | Signed form (114 KB) |
DOE clarification |
DOE clarification 1 - 10116 PoA-DD_Small Hydropower Programme in Colombia track changes.pdf (562 KB)
DOE clarification 2 - 10116 PoA-DD_Small Hydropower Programme in Colombia clean.pdf (503 KB) DOE clarification 3 - 10116 CDM.VAL.21.003_FAssesment on PRC PoA Small Hydro_v_1.1.pdf (268 KB) DOE clarification 4 - 10116 Reg_form17v8.pdf (124 KB) |
VVS version | VVS-PoA 2.0 |
Current status | 18 Jun 21 -
Approved
Effective approval date: 17 Jun 21
|
Historic statuses |
26 Apr 21 -
Published 11 May 21 - Awaiting DOE clarifications 14 May 21 - DOE clarifications received 14 May 21 - Summary note being prepared 28 May 21 - Awaiting EB decision |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: