Project:
3282 Inner Mongolia Shangdu Jiqingliang 49.5MW Wind Power Project
- Request for post-registration changes
| Project | 3282 Inner Mongolia Shangdu Jiqingliang 49.5MW Wind Power Project |
|---|---|
| PRC ref | PRC-3282-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
| Applicable crediting period | 27 Nov 10 - 26 Nov 17 |
| Assessment opinion |
Assessment opinion (397 KB)
|
| Revised PDD |
Revised PDD (889 KB)
Revised PDD - track changes (896 KB)
|
| Supplementary documents |
Appendix 1 - IRR V2.zip (21 KB)
|
| Signed form |
Signed form (58 KB)
|
| DOE clarification | |
| VVS version | VVS 2.0 |
| Current status | 02 Apr 13 -
Approved
Effective approval date: 02 Apr 13
|
| Historic statuses |
04 Mar 13 -
Request published |

Assessment opinion
Appendix 1 - IRR V2.zip