04:42 25 Jan 25
Project:
3282 Inner Mongolia Shangdu Jiqingliang 49.5MW Wind Power Project
- Request for post-registration changes
Project | 3282 Inner Mongolia Shangdu Jiqingliang 49.5MW Wind Power Project |
---|---|
PRC ref | PRC-3282-001 |
Process track | Issuance |
DOE | SGS |
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
Methodology(ies) list | |
Standardized baseline(s) list | |
DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
Changes to the project or programme design
|
Applicable crediting period | 27 Nov 10 - 26 Nov 17 |
Assessment opinion | Assessment opinion (397 KB) |
Revised PDD | Revised PDD (889 KB) Revised PDD - track changes (896 KB) |
Supplementary documents |
Appendix 1 - IRR V2.zip (21 KB)
|
Signed form | Signed form (58 KB) |
DOE clarification | |
VVS version | VVS 2.0 |
Current status | 02 Apr 13 -
Approved
Effective approval date: 02 Apr 13
|
Historic statuses |
04 Mar 13 -
Request published |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: