Project: 2128 Shri Bajrang RE Project - Request for post-registration changes
Project 2128 Shri Bajrang RE Project
PRC ref PRC-2128-001
Process track Prior approval
DOE LGAI Tech. Center S.A
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a methodology (including addition of methodology(ies))
Methodology(ies) list AMS-I.F. ver. 5 - Renewable electricity generation for captive use and mini-grid
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard?
Applicable crediting period 27 Feb 16 - 26 Feb 23
Assessment opinion Assessment opinion (351 KB)
Revised PDD Revised PDD (534 KB)   Revised PDD - track changes (763 KB)
Supplementary documents
Signed form Signed form (161 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 01 Jul 24 - Approved
Effective approval date: 30 Jun 24
Historic statuses 21 May 24 - Published
21 May 24 - Summary note being prepared
10 Jun 24 - Awaiting EB decision