Project: 6864 Fuel Efficient Stoves in Africa - Request for post-registration changes
Project 6864 Fuel Efficient Stoves in Africa
PRC ref PRC-6864-004
Process track Prior approval
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Change a version of methodology
Methodology(ies) list AMS-II.G. ver. 11 - Energy efficiency measures in thermal applications of non-renewable biomass
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: Changes to the programme boundary to expand geographical coverage, Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold, Geographical boundary of the PoA is expanded within the host Party or to include one or more host Parties, Voluntary update of the applied methodologies or the other applied methodological regulatory documents to a later valid version or voluntary change to other methodologies
Applicable crediting period 28 Jan 13 - 27 Jan 20
Assessment opinion Assessment opinion (407 KB)
Revised PDD Revised PDD (3993 KB)   Revised PDD - track changes (3332 KB)
Supplementary documents Appendix 1 - 6864 Zimbabwe_fNRB Calculation Sheet.xlsx (40 MB)
Appendix 2 - 6864 Zambia LOA.pdf (891 KB)
Appendix 3 - Zim LoA.pdf (184 KB)
Signed form Signed form (124 KB)
DOE clarification DOE clarification 1 - Clarification Letter ESPL_240820.pdf (141 KB)

VVS version VVS-PoA 2.0
Current status 23 Oct 20 - Approved
Effective approval date: 21 Oct 20
Historic statuses 27 Jul 20 - Published
07 Sep 20 - Awaiting DOE clarifications
17 Sep 20 - DOE clarifications received
17 Sep 20 - Summary note being prepared
01 Oct 20 - Awaiting EB decision