Project: 0584 Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project - Request for post-registration changes
Project 0584 Korea Water Resources Corporation (KOWACO) small-scale hydroelectric power plants project
PRC ref PRC-0584-001
Process track Issuance
DOE KFQ
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Jan 2011 - 30 Apr 2011
Assessment opinion Assessment opinion (576 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (777 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 19 Oct 17 - Approved
Effective approval date: 19 Oct 17
Historic statuses 20 Sep 17 - Request published