Project: 6164 4.05 MW Champamati small hydro power project - Request for post-registration changes
Project 6164 4.05 MW Champamati small hydro power project
PRC ref PRC-6164-001
Process track Issuance
DOE TÜV NORD
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 04 Sep 2019 - 31 Dec 2019
Assessment opinion Assessment opinion (386 KB)
Revised PDD  
Supplementary documents
Signed form Signed form (265 KB)
DOE clarification
VVS version VVS-PA 3.0
Current status 05 Aug 22 - Approved
Effective approval date: 05 Aug 22
Historic statuses 07 Jul 22 - Request published