Project: 0028 RIO BLANCO Small Hydroelectric Project - Request for post-registration changes
Project 0028 RIO BLANCO Small Hydroelectric Project
PRC ref PRC-0028-002
Process track Issuance
DOE TUV RHEIN
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Aug 04 - 31 Jul 14
Assessment opinion Assessment opinion (1442 KB)
Revised PDD Revised PDD (842 KB)   Revised PDD - track changes (845 KB)
Supplementary documents
Signed form Signed form (123 KB)
DOE clarification
VVS version VVS 2.0
Current status 07 Mar 14 - Approved
Effective approval date: 07 Mar 14
Historic statuses 06 Feb 14 - Request published