Project: 2658 Green Glory Wastewater Treatment and Electricity Generation in Suratthani, Thailand - Request for post-registration changes
Project 2658 Green Glory Wastewater Treatment and Electricity Generation in Suratthani, Thailand
PRC ref PRC-2658-001
Process track Issuance
DOE JCI
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 01 Oct 2009 - 31 Jul 2011

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Changes to the project or programme design
  • Changes have an impact on: None of the above
Applicable crediting period 01 Oct 09 - 30 Sep 19
Assessment opinion Assessment opinion (1248 KB)
Revised PDD Revised PDD (340 KB)   Revised PDD - track changes (343 KB)
Supplementary documents
Signed form Signed form (155 KB)
DOE clarification
VVS version VVS 2.0
Current status 29 Aug 14 - Approved
Effective approval date: 29 Aug 14
Historic statuses 31 Jul 14 - Request published