Project: 0171 Caieiras landfill gas emission reduction - Request for post-registration changes
Project 0171 Caieiras landfill gas emission reduction
PRC ref PRC-0171-005
Process track Prior approval
DOE EPIC
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Prior to commencement of a verification for the project activity or PoA stated above
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No

Changes to the project or programme design
  • Changes have an impact on: Addition of new components or extension/addition of technologies/measures that introduce:
Applicable crediting period 13 Dec 13 - 30 Mar 20
Assessment opinion Assessment opinion (1465 KB)
Revised PDD Revised PDD (4633 KB)   Revised PDD - track changes (4975 KB)
Supplementary documents Appendix 1 - 27 July 2018_CER CAI - V 9.0 - 20.07.2018.xlsx (182 KB)
Signed form Signed form (147 KB)
DOE clarification
VVS version VVS-PA 1.0
Current status 29 Aug 18 - Approved
Effective approval date: 28 Aug 18
Historic statuses 05 Jul 18 - Published
19 Jul 18 - Awaiting DOE clarifications
27 Jul 18 - DOE clarifications received
27 Jul 18 - Summary note being prepared
08 Aug 18 - Awaiting EB decision