Project: 3706 Emissions reduction through partial substitution of fossil fuels with renewable plantation biomass and biomass residues in CEMEX Assiut Cement Plant - Request for post-registration changes
Project 3706 Emissions reduction through partial substitution of fossil fuels with renewable plantation biomass and biomass residues in CEMEX Assiut Cement Plant
PRC ref PRC-3706-001
Process track Prior approval
DOE AENOR
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? No

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? No
Applicable crediting period 01 Mar 11 - 28 Feb 18
Assessment opinion Assessment opinion (368 KB)
Revised PDD Revised PDD (3083 KB)   Revised PDD - track changes (3203 KB)
Supplementary documents
Signed form Signed form (360 KB)
DOE clarification
VVS version VVS 2.0
Current status 26 Feb 14 - Approved
Effective approval date: 25 Feb 14
Historic statuses 21 Jan 14 - Published
21 Jan 14 - Summary note being prepared
04 Feb 14 - Awaiting EB decision