Project: 6654 14.4 MW Grid Connected Wind Power Project of Vaibhavlaxmi Clean Energy in Madhya Pradesh and Tamil Nadu, India - Request for post-registration changes
Project 6654 14.4 MW Grid Connected Wind Power Project of Vaibhavlaxmi Clean Energy in Madhya Pradesh and Tamil Nadu, India
PRC ref PRC-6654-001
Process track Issuance
DOE SGS
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard? Yes

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Nov 12 - 31 Oct 22
Assessment opinion Assessment opinion (445 KB)
Revised PDD Revised PDD (883 KB)   Revised PDD - track changes (922 KB)
Supplementary documents Appendix 1 - VBL_PDD_VVM to VVS.pdf (714 KB)
Signed form Signed form (48 KB)
DOE clarification
Current status 04 May 15 - Approved
Effective approval date: 04 May 15
Historic statuses 02 Apr 15 - Request published