21:17 27 Nov 25
Project:
6654 14.4 MW Grid Connected Wind Power Project of Vaibhavlaxmi Clean Energy in Madhya Pradesh and Tamil Nadu, India
- Request for post-registration changes
| Project | 6654 14.4 MW Grid Connected Wind Power Project of Vaibhavlaxmi Clean Energy in Madhya Pradesh and Tamil Nadu, India |
|---|---|
| PRC ref | PRC-6654-001 |
| Process track | Issuance |
| DOE | SGS |
|
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes |
|
| Methodology(ies) list | |
| Standardized baseline(s) list | |
| DOE conducted validation of the changes | When performing a verification for the project activity or PoA stated above (See footnote 1 below) |
| Type of submission |
Corrections that do not affect project design
Permanent changes from the monitoring plan or the monitoring methodology
|
| Applicable crediting period | 01 Nov 12 - 31 Oct 22 |
| Assessment opinion |
Assessment opinion (445 KB)
|
| Revised PDD |
Revised PDD (883 KB)
Revised PDD - track changes (922 KB)
|
| Supplementary documents |
Appendix 1 - VBL_PDD_VVM to VVS.pdf (714 KB)
|
| Signed form |
Signed form (48 KB)
|
| DOE clarification | |
| Current status | 04 May 15 -
Approved
Effective approval date: 04 May 15
|
| Historic statuses |
02 Apr 15 -
Request published |

Assessment opinion
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: