Project: 9411 Chilean small scale renewable energy programme of activities - Request for post-registration changes
Project 9411 Chilean small scale renewable energy programme of activities
PRC ref PRC-9411-001
Process track Renewal
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes Combined with a request for renewal of crediting period (See footnote 2 below)
Type of submission Changes to the project or programme design
  • Changes have an impact on: Revisions to the eligibility criteria due to methodologies applied to the PoA are revised or replaced by the Board subsequent to being placed on hold, Use of positive lists or related provisions is introduced or modified based on the valid version of approved tools pertaining to demonstration of additionality of small-scale or microscale project activities, Removal of a component or technology/measure
Applicable crediting period 31 Dec 19 - 30 Dec 26
Assessment opinion Assessment opinion (142 KB)
Revised PDD   Revised PDD - track changes (1436 KB)
Supplementary documents
Signed form Signed form (129 KB)
DOE clarification
VVS version VVS-PoA 3.0
Current status 20 Apr 22 - Approved
Effective approval date: 20 Apr 22
Historic statuses 22 Mar 22 - Request published