Project: 2636 AVN08-S-01, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam - Request for post-registration changes
Project 2636 AVN08-S-01, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam
PRC ref PRC-2636-001
Process track Issuance
DOE Earthood
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
No changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 10 Mar 2018 - 27 Mar 2019

Corrections that do not affect project design
  • All changes are in Appendix 1 of the CDM project standard?

Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 01 Sep 17 - 31 Aug 24
Assessment opinion Assessment opinion (663 KB)
Revised PDD Revised PDD (1122 KB)   Revised PDD - track changes (1207 KB)
Supplementary documents Appendix 1 - 2636 PRC ER Sheet.xlsx (22 KB)
Signed form Signed form (318 KB)
DOE clarification
VVS version VVS-PA 2.0
Current status 13 Mar 20 - Approved
Effective approval date: 13 Mar 20
Historic statuses 13 Feb 20 - Request published