Project: 9626-P1-0013-CP1 DelAgua Rwanda Public Health Program: CPA013- KIREHE District in the Eastern Province of the Republic of Rwanda - Request for post-registration changes
Project 9626-P1-0013-CP1 DelAgua Rwanda Public Health Program: CPA013- KIREHE District in the Eastern Province of the Republic of Rwanda
PRC ref PRC-9626-018
Process track CPA-PRC
DOE Earthood
Type of submission Temporary deviations from the monitoring plan or the monitoring methodology
  • Applicable period for proposed deviations (inclusive): 15 Sep 2015 - 31 Dec 2018

Corrections that do not affect project design

Permanent changes from the monitoring plan or the monitoring methodology

Changes to the project or programme design
  • Is the change to increase the capacity specified in the included CPA-DD? Yes Date of the commissioning or implementation of the change: 07 Sep 2014 Is the change to decrease the capacity specified in the included CPA-DD? No Is the change to add new components or extend/add technologies/measures or introduce complementary technologies/measures? No Date of the commissioning or implementation of the change:
Applicable crediting period 19 Apr 16 - 18 Apr 23
Assessment opinion Assessment opinion (854 KB)
Revised CPA-DD Revised CPA-DD (902 KB)   Revised CPA-DD - track changes (802 KB)
Supplementary documents Appendix 1 - CPA013_ER Estimate w CE_20200317.xlsx (30 KB)
Appendix 2 - MR MP3_20200328_cl.ks.pdf (768 KB)
Appendix 3 - ER sheet.zip (76 MB)
Signed form Signed form (101 KB)
DOE clarification DOE clarification 1 - 9626 Clarification Letter ESPL(1-16).pdf (119 KB)
DOE clarification 2 - CPA013_CPA DD_v4.4.pdf (902 KB)
DOE clarification 3 - CPA013_CPA DD_v4.4_TC.pdf (802 KB)
DOE clarification 4 - 9626 MR MP3.pdf (779 KB)
DOE clarification 5 - Survey Sheet Spreadsheet.zip (1120 KB)
DOE clarification 6 - Combined CPA-PRC-Report CPA 01-27.pdf (854 KB)
VVS version VVS-PoA 2.0
Current status 24 Jul 20 - Approved
Effective approval date: 23 Jul 20
Historic statuses 04 May 20 - Published
15 Jun 20 - Awaiting DOE clarifications
20 Jun 20 - DOE clarifications received
20 Jun 20 - Summary note being prepared
03 Jul 20 - Awaiting EB decision