Project: 9904-P1-0003-CP1 Mbinga Hydroelectric Project - Request for post-registration changes
Project 9904-P1-0003-CP1 Mbinga Hydroelectric Project
PRC ref PRC-9904-004
Process track CPA-PRC
DOE BVI
Type of submission Permanent changes from the monitoring plan or the monitoring methodology

Changes to the project or programme design
  • Is the change to increase the capacity specified in the included CPA-DD? No Date of the commissioning or implementation of the change: Is the change to decrease the capacity specified in the included CPA-DD? Yes Is the change to add new components or extend/add technologies/measures or introduce complementary technologies/measures? No Date of the commissioning or implementation of the change:
Applicable crediting period 01 Dec 15 - 30 Nov 22
Assessment opinion Assessment opinion (122 KB)
Revised CPA-DD Revised CPA-DD (1001 KB)   Revised CPA-DD - track changes (1104 KB)
Supplementary documents Appendix 1 - ER Calculation Mbinga Hydro 23Dec2019.xlsx (71 KB)
Signed form Signed form (33 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 28 Apr 20 - Approved
Effective approval date: 27 Apr 20
Historic statuses 23 Mar 20 - Published
23 Mar 20 - Summary note being prepared
07 Apr 20 - Awaiting EB decision