Project: 6810-P1-0003-CP1 CPA2_Nam Tha 4 Hydropower Project - Request for post-registration changes
Project 6810-P1-0003-CP1 CPA2_Nam Tha 4 Hydropower Project
PRC ref PRC-6810-005
Process track CPA-PRC
DOE TÜV NORD
Type of submission Corrections that do not affect project design

Changes to the project or programme design
  • Is the change to increase the capacity specified in the included CPA-DD? Yes Date of the commissioning or implementation of the change: 15 Jan 2020 Is the change to decrease the capacity specified in the included CPA-DD? No Is the change to add new components or extend/add technologies/measures or introduce complementary technologies/measures? No Date of the commissioning or implementation of the change:
Applicable crediting period 26 Nov 14 - 25 Nov 21
Assessment opinion Assessment opinion (743 KB)
Revised CPA-DD Revised CPA-DD (1318 KB)   Revised CPA-DD - track changes (1320 KB)
Supplementary documents Appendix 1 - ER_VN REDP Nam Tha 4 ER Ver04 2019.12.06.xls (204 KB)
Appendix 2 - F1_VN REDP Nam Tha 4 FA Ver06 2020.02.03.xls (205 KB)
Signed form Signed form (184 KB)
DOE clarification
VVS version VVS-PoA 2.0
Current status 13 May 20 - Approved
Effective approval date: 12 May 20
Historic statuses 16 Mar 20 - Published
01 Apr 20 - Awaiting DOE clarifications
14 Apr 20 - DOE clarifications received
14 Apr 20 - Summary note being prepared
22 Apr 20 - Awaiting EB decision