10:05 05 Jan 26
Project:
5979-P1-0002-CP1 CPA-2: Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines’ (LBP) Carbon Finance Support Facility
- Request for post-registration changes
| Project | 5979-P1-0002-CP1 CPA-2: Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines’ (LBP) Carbon Finance Support Facility |
|---|---|
| PRC ref | PRC-5979-003 |
| Process track | CPA-PRC |
| DOE | TÜV NORD |
| Type of submission |
Corrections that do not affect project design
Changes to the project or programme design
|
| Applicable crediting period | 08 Sep 13 - 07 Sep 20 |
| Assessment opinion |
Assessment opinion (957 KB)
|
| Revised CPA-DD |
Revised CPA-DD (1167 KB)
Revised CPA-DD - track changes (1255 KB)
|
| Supplementary documents |
Appendix 1 - CER-CPA2-5979-PRC revised tracked (version 3).xls (133 KB)
|
| Signed form |
Signed form (543 KB)
|
| DOE clarification |
DOE clarification 1 - PoA5979-CPA2-DD - v12 rev3.2.pdf (1174 KB)
DOE clarification 2 - PoA5979-CPA2-DD - v12 rev3.2_track_change.pdf (1174 KB)
DOE clarification 3 - CER-CPA2-5979-PRC revised tracked (version 4).xls (308 KB)
DOE clarification 4 - 2020-12-02_PoA5979-CPA2_PRC Report.pdf (869 KB)
DOE clarification 5 - Reg_form33v2.pdf (185 KB)
DOE clarification 6 - 2021-06-21_PoA5979-CPA2_PRC Report.pdf (992 KB)
DOE clarification 7 - PoA5979-CPA2-DD - v13 tracked fr v6.pdf (1262 KB)
DOE clarification 8 - PoA5979-CPA2-DD - v13 tracked fr v6_clean.pdf (1171 KB)
DOE clarification 9 - POA 5979 CPA-02 ER 2020 for prc rev tracked3.xlsx (450 KB)
DOE clarification 10 - (1) POA 5979 CPA-02 ER 2020 for prc.xlsx (186 KB)
DOE clarification 11 - (4) POA 5979 CPA-02 ERclean rev1 sec PRCrev.xlsx (188 KB)
DOE clarification 12 - Reg_form33v2.pdf (170 KB)
|
| VVS version | VVS-PoA 2.0 |
| Current status | 26 Aug 21 -
Rejected
Effective rejection date: 25 Aug 21.
Reason (67 KB)
|
| Historic statuses |
26 Oct 20 -
Published 17 Dec 20 - Awaiting DOE clarifications 22 Jul 21 - DOE clarifications received 22 Jul 21 - Summary note being prepared 05 Aug 21 - Awaiting EB decision |

Assessment opinion
Appendix 1 - CER-CPA2-5979-PRC revised tracked (version 3).xls
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: