Project: 5979-P1-0002-CP1 CPA-2: Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines’ (LBP) Carbon Finance Support Facility - Request for post-registration changes
Project 5979-P1-0002-CP1 CPA-2: Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines’ (LBP) Carbon Finance Support Facility
PRC ref PRC-5979-003
Process track CPA-PRC
DOE TÜV NORD
Type of submission Corrections that do not affect project design

Changes to the project or programme design
  • Is the change to increase the capacity specified in the included CPA-DD? Yes Date of the commissioning or implementation of the change: 15 Jul 2019 Is the change to decrease the capacity specified in the included CPA-DD? No Is the change to add new components or extend/add technologies/measures or introduce complementary technologies/measures? No Date of the commissioning or implementation of the change:
Applicable crediting period 08 Sep 13 - 07 Sep 20
Assessment opinion Assessment opinion (957 KB)
Revised CPA-DD Revised CPA-DD (1167 KB)   Revised CPA-DD - track changes (1255 KB)
Supplementary documents Appendix 1 - CER-CPA2-5979-PRC revised tracked (version 3).xls (133 KB)
Signed form Signed form (543 KB)
DOE clarification DOE clarification 1 - PoA5979-CPA2-DD - v12 rev3.2.pdf (1174 KB)
DOE clarification 2 - PoA5979-CPA2-DD - v12 rev3.2_track_change.pdf (1174 KB)
DOE clarification 3 - CER-CPA2-5979-PRC revised tracked (version 4).xls (308 KB)
DOE clarification 4 - 2020-12-02_PoA5979-CPA2_PRC Report.pdf (869 KB)
DOE clarification 5 - Reg_form33v2.pdf (185 KB)
DOE clarification 6 - 2021-06-21_PoA5979-CPA2_PRC Report.pdf (992 KB)
DOE clarification 7 - PoA5979-CPA2-DD - v13 tracked fr v6.pdf (1262 KB)
DOE clarification 8 - PoA5979-CPA2-DD - v13 tracked fr v6_clean.pdf (1171 KB)
DOE clarification 9 - POA 5979 CPA-02 ER 2020 for prc rev tracked3.xlsx (450 KB)
DOE clarification 10 - (1) POA 5979 CPA-02 ER 2020 for prc.xlsx (186 KB)
DOE clarification 11 - (4) POA 5979 CPA-02 ERclean rev1 sec PRCrev.xlsx (188 KB)
DOE clarification 12 - Reg_form33v2.pdf (170 KB)
VVS version VVS-PoA 2.0
Current status 26 Aug 21 - Rejected
Effective rejection date: 25 Aug 21. Reason (67 KB)
Historic statuses 26 Oct 20 - Published
17 Dec 20 - Awaiting DOE clarifications
22 Jul 21 - DOE clarifications received
22 Jul 21 - Summary note being prepared
05 Aug 21 - Awaiting EB decision