19:39 22 Dec 24
ACM0001:
Consolidated methodology for landfill gas project activities --- Version 5.0
Submit comments for improvement of this methodology (please login)
Title |
Consolidated methodology for landfill gas project activities (439 KB)
The additionality of the project activity shall be demonstrated and assessed using the Tool for the demonstration and assessment of additionality (260 KB) Other tool referenced in this methodology: |
|
---|---|---|
Version number |
|
|
Scale | Large scale --- Consolidated | |
Status | Not Active (old version) | |
Validity |
Valid from 21 Dec 06 to 05 Jul 07
|
|
Sectoral scope(s) | 13 | |
Sources |
AM0002
,
AM0003
,
AM0010
,
AM0011
Replaces: AM0002 , AM0003 , AM0010 , AM0011 |
|
Clarifications* | Temperature of the exhaust gases at the sampling point inside the flare (submitted 04 May 07): AM_CLA_0047 (148 KB) | |
Revisions* | Proposal to broaden the applicability of ACM0001 to include biogas capture from anaerobic organic waste-water treatment systems using an open pond or lagoon system (submitted 12 Apr 07): AM_REV_0046 (130 KB) | |
Previous Versions | ||
Title | Consolidated methodology for landfill gas project activities --- Version 4 (216 KB) | |
Version number | 4.0 | |
Validity |
Valid from 27 Jul 06 to 20 Dec 06
Requests for registration can be submitted until 15 Feb 2007 23:59:59 GMT |
|
Sectoral scope(s) | 13 | |
Title | Consolidated methodology for landfill gas project activities --- Version 3 (212 KB) | |
Version number | 3.0 | |
Validity |
Valid from 18 May 06 to 26 Jul 06
Requests for registration can be submitted until 21 Sep 2006 23:59:59 GMT |
|
Sectoral scope(s) | 13 | |
Clarifications* | Applicability of the methodology for a project activity that aims to collect LFG and upgrade to CPLG (submitted 24 May 06): AM_CLA_0031 (132 KB) | |
Title | Consolidated methodology for landfill gas project activities --- Version 2 (218 KB) | |
Version number | 2.0 | |
Validity |
Valid from 29 Sep 05 to 17 May 06
Requests for registration can be submitted until 14 Jul 2006 23:59:59 GMT |
|
Sectoral scope(s) | 13 | |
Clarifications* | Parameters to be fixed ex-ante for the entire crediting period (submitted 23 Dec 05): AM_CLA_0016 (139 KB) | |
Clarification on requirements for monitoring landfill gas flows (submitted 23 Feb 06): AM_CLA_0020 (137 KB) | ||
Requirement for separate monitoring of LFG temperature and pressure (submitted 08 Mar 06): AM_CLA_0023 (133 KB) | ||
Clarification on requirements for monitoring landfill gas flows in projects where only flaring occurs (submitted 27 Apr 06): AM_CLA_0028 (134 KB) | ||
Revisions* | Alternative approaches to monitoring flare efficiency (submitted 26 Apr 06): AM_REV_0012 (157 KB) | |
Title | Consolidated methodology for landfill gas project activities --- Version 1 (76 KB) | |
Version number | 1.0 | |
Validity | Valid from 02 Sep 04 to 11 Oct 05 | |
Sectoral scope(s) | 13 | |
Clarifications* | Request for clarification on step 0 of the “Tool for the demonstration and assessment of additionality" (submitted 04 Oct 05): EB 22 meeting report (237 KB) | |
Request for clarification on the applicability of the Methodology ACM0001 to project types that supply compressed LFG by trucks to end-users (submitted 14 Dec 12): AM_CLA_0244 (125 KB) | ||
Procedure to determine the amount of methane that would have been captured and destroyed (by flaring) in the baseline (FCH4,BL,y) (submitted 04 Feb 15): AM_CLA_0265 (147 KB) |
* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: