20:02 04 Dec 24
ACM0002:
Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 6.0
Submit comments for improvement of this methodology (please login)
Title |
Consolidated methodology for grid-connected electricity generation from renewable sources (395 KB)
The additionality of the project activity shall be demonstrated and assessed using the Tool for the demonstration and assessment of additionality (260 KB) |
|
---|---|---|
Version number |
|
|
Scale | Large scale --- Consolidated | |
Status | Not Active (old version) | |
Validity |
Valid from 18 May 06 to 13 Dec 07
|
|
Sectoral scope(s) | 1 | |
Sources |
NM0001-rev
,
NM0012-rev
,
NM0023
,
NM0024-rev
,
NM0030-rev
,
NM0036
,
NM0043
,
NM0055
Replaces: AM0005 |
|
Clarifications* | The type of justification needed for not using the preferred Dispatch Analysis option for calculating the Operating Margin Emission Factor (submitted 13 Dec 06): AM_CLA_0037 (120 KB) | |
Clarification on data vintage if OM or BM emission coefficient is monitored ex-post (submitted 04 Dec 06): AM_CLA_0038 (122 KB) | ||
Calculation of power density (submitted 07 Jun 07): AM_CLA_0049 (116 KB) | ||
Types of capacity additions to be included in the BM (submitted 10 Aug 07): AM_CLA_0054 (133 KB) | ||
Applicability of ACM0002 to hydropower plants increasing electricity production through the diversion of water from further creeks into the reservoir without expansion of the installed power capacity (submitted 28 Sep 07): AM_CLA_0061 (134 KB) | ||
Monitoring of non-condensible gas emissions (submitted 01 Oct 07): AM_CLA_0062 (112 KB) | ||
Revisions* | Electricity generation projects resulting in emissions reductions in another non-Annex I country (submitted 25 Jul 06): AM_REV_0018 (127 KB) | |
Treatment of electricity exported from a project activity to a grid located in a different country (submitted 19 Sep 06): AM_REV_0026 (177 KB) | ||
Approach for the exclusion of immaterial parts of a multinational grid (submitted 26 Oct 06): AM_REV_0027 (122 KB) | ||
Enable the use of ACM0002 for power plants that result in emission reductions in another non-Annex I country because of the enhancement of dispatch of clean energy to that grid. (submitted 31 Oct 06): AM_REV_0029 (121 KB) | ||
Previous Versions | ||
Title | Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 5 (417 KB) | |
Version number | 5.0 | |
Validity |
Valid from 02 Mar 06 to 17 May 06
Requests for registration can be submitted until 14 Jul 2006 23:59:59 GMT |
|
Sectoral scope(s) | 1 | |
Title | Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 4 (322 KB) | |
Version number | 4.0 | |
Validity | Valid from 28 Nov 05 to 01 Mar 06 | |
Sectoral scope(s) | 1 | |
Clarifications* | Consideration of registered CDM projects in the build and operating margin (submitted 16 Dec 05): AM_CLA_0014 (28 KB) | |
Title | Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 3 (350 KB) | |
Version number | 3.0 | |
Validity | Valid from 29 Sep 05 to 27 Nov 05 | |
Sectoral scope(s) | 1 | |
Clarifications* | Build Margin - Approach to determine recent 20% if 20% falls on part capacity (submitted 13 Nov 05): AM_CLA_0009 (154 KB) | |
Title | Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 2 (216 KB) | |
Version number | 2.0 | |
Validity | Valid from 02 Dec 04 to 11 Oct 05 | |
Sectoral scope(s) | 1 | |
Clarifications* | Determination of relevant electricity grid boundaries in India – state grid vs. regional grid vs. national grid (submitted 27 Jul 05): AM_CLA_0001 (146 KB) | |
Proposal to complement ACM002 and add a calculation of the amount of energy generated by the plants before the project. (submitted 28 Jul 05): AM_CLA_0002 (134 KB) | ||
Request for clarification on step 0 of the “Tool for the demonstration and assessment of additionality" (submitted 04 Oct 05): EB 22 meeting report (237 KB) | ||
Title | Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 1 (214 KB) | |
Version number | 1.0 | |
Validity | Valid from 02 Sep 04 to 01 Dec 04 | |
Sectoral scope(s) | 1 | |
Clarifications* | Clarification regarding the demonstration of Additionality in case of transfer of assets (submitted 15 Oct 11): AM_CLA_0223 (175 KB) | |
Application of combination of large scale methodology ACM0002 and small-scale methodology AMS I.D in a renewable energy PoA (submitted 10 Feb 12): AM_CLA_0227 (152 KB) | ||
Applicability of ACM0002 to existing hydropower plants increasing electricity generation through the construction of a new reservoir (submitted 10 Dec 13): AM_CLA_0254 (107 KB) | ||
Clarifications on updating DATEBaselineRetrofit of ACM0002 and on changing the grid emission factor calculation approach from ex post to ex ante (submitted 13 Nov 18): AM_CLA_0280 (106 KB) |
* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: