ACM0006: Consolidated methodology for grid-connected electricity generation from biomass residues --- Version 4.0

Submit comments for improvement of this methodology (please login)

Title Consolidated methodology for grid-connected electricity generation from biomass residues (440 KB)

The additionality of the project activity shall be demonstrated and assessed using the Tool for the demonstration and assessment of additionality (260 KB)

Other tool referenced in this methodology:

Version number
4.0
Scale Large scale --- Consolidated
Status Not Active (old version)
Validity Valid from 01 Nov 06 to 17 May 07
Sectoral scope(s) 1
Sources NM0050-rev , NM0081 , NM0098

Replaces: AM0004 , AM0015
Clarifications* Definitions and scenarios (submitted 28 Nov 06): AM_CLA_0035 (156 KB)
Clarification on terminology used for power plants and definition of scenarios (submitted 04 Dec 06): AM_CLA_0036 (156 KB)
Simultaneous application of two compatible baseline scenarios (Nš3 and Nš4) to one single CDM project activity (submitted 09 Feb 07): AM_CLA_0042 (123 KB)
Revisions* East Coast Power Plant (S) Sdn. Bhd. 13MW biomass power generation project (the Project or the Project activity) (submitted 20 Nov 06): AM_REV_0030 (125 KB)
Pelita Agung Agrindustri Cogeneration Biomass Project (submitted 24 Nov 06): AM_REV_0032 (162 KB)
New scenario for energy efficiency projects (submitted 20 Feb 07): AM_REV_0044 (123 KB)
Request to include biomass project supplying power and heat directly to the user instead of electricity grid (submitted 16 Apr 07): AM_REV_0047 (124 KB)
Extended applicability of scenario 16: Allowing co-firing in existing biomass residue fired power generation unit(s) (submitted 17 Apr 07): AM_REV_0048 (132 KB)
Previous Versions
Title Consolidated methodology for grid-connected electricity generation from biomass residues --- Version 3 (364 KB)
Version number 3.0
Validity Valid from 18 May 06 to 31 Oct 06
Requests for registration can be submitted until 27 Dec 2006 23:59:59 GMT
Sectoral scope(s) 1
Clarifications* Combined application of ACM0006 & AMS-II.B following M&P for a large scale project activity is proposed. (submitted 07 Oct 06): AM_CLA_0034 (119 KB)
Revisions* New scenario 17: Partial or complete fuel switch from fossil fuels to biomass at an existing cogeneration plant without significantly changing heat and electricity production (submitted 02 Jun 06): AM_REV_0014 (129 KB)
Proposal of new scenario for ACM0006 in order to cover energy efficiency projects resulting in fossil fuel displacement plus expansion of surplus power capacity (submitted 06 Jun 06): AM_REV_0015 (134 KB)
Extend applicability to heat generation projects that switch from fossil fuel to biomass residues (submitted 04 Aug 06): AM_REV_0019 (120 KB)
Use of first order decay model for calculation of avoided methane emissions from natural decay (submitted 17 Aug 06): AM_REV_0023 (120 KB)
Addition of scenario for fossil fuel based electricity and heat generation in the baseline case (submitted 05 Sep 06): AM_REV_0024 (116 KB)
Title Consolidated methodology for grid-connected electricity generation from biomass residues --- Version 2 (392 KB)
Version number 2.0
Validity Valid from 02 Mar 06 to 17 May 06
Requests for registration can be submitted until 14 Jul 2006 23:59:59 GMT
Sectoral scope(s) 1
Revisions* Request for amendment to include biomass residues fuel switch projects that generate heat but do not produce electricity (submitted 11 Mar 06): AM_REV_0008 (146 KB)
Amendment of ACM0006 / Version 02; Sectoral Scope: 01; 03 March 2006 (submitted 05 May 06): AM_REV_0013 (175 KB)
Title Consolidated methodology for grid-connected electricity generation from biomass residues --- Version 1 (415 KB)
Version number 1.0
Validity Valid from 29 Sep 05 to 01 Mar 06
Sectoral scope(s) 1
Clarifications* Proposed amendment to ACM0006 (submitted 08 Dec 05): AM_CLA_0012 (136 KB)
Scenario 14: Clarification on equation to determine net quantity of increased electricity generation (submitted 23 Feb 06): AM_CLA_0021 (140 KB)
Amendment to Draft ACM0006/Version 02 (submitted 24 Feb 06): AM_CLA_0022 (144 KB)
Revisions* Deletion of footnote 6 in ACM0006 (submitted 16 Dec 05): AM_REV_0002 (25 KB)
New scenario 16 (fossil fuel displacement and power capacity expansion) and scenario 17 (partial or complete fuel switch) for projects in existing power plant already co-firing biomass and fossil fuels (submitted 06 Feb 06): AM_REV_0006 (159 KB)

* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.