ACM0002: Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 4.0

Submit comments for improvement of this methodology (please login)

Title Consolidated methodology for grid-connected electricity generation from renewable sources (322 KB)

The additionality of the project activity shall be demonstrated and assessed using the Tool for the demonstration and assessment of additionality (260 KB)

Version number
4.0
Scale Large scale --- Consolidated
Status Not Active (old version)
Validity Valid from 28 Nov 05 to 01 Mar 06
Sectoral scope(s) 1
Sources NM0001-rev , NM0012-rev , NM0023 , NM0024-rev , NM0030-rev , NM0036 , NM0043 , NM0055

Replaces: AM0005
Clarifications* Consideration of registered CDM projects in the build and operating margin (submitted 16 Dec 05): AM_CLA_0014 (28 KB)
Previous Versions
Title Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 3 (350 KB)
Version number 3.0
Validity Valid from 29 Sep 05 to 27 Nov 05
Sectoral scope(s) 1
Clarifications* Build Margin - Approach to determine recent 20% if 20% falls on part capacity (submitted 13 Nov 05): AM_CLA_0009 (154 KB)
Title Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 2 (216 KB)
Version number 2.0
Validity Valid from 02 Dec 04 to 11 Oct 05
Sectoral scope(s) 1
Clarifications* Determination of relevant electricity grid boundaries in India – state grid vs. regional grid vs. national grid (submitted 27 Jul 05): AM_CLA_0001 (146 KB)
Proposal to complement ACM002 and add a calculation of the amount of energy generated by the plants before the project. (submitted 28 Jul 05): AM_CLA_0002 (134 KB)
Request for clarification on step 0 of the “Tool for the demonstration and assessment of additionality" (submitted 04 Oct 05): EB 22 meeting report (237 KB)
Title Consolidated methodology for grid-connected electricity generation from renewable sources --- Version 1 (214 KB)
Version number 1.0
Validity Valid from 02 Sep 04 to 01 Dec 04
Sectoral scope(s) 1
Clarifications* Clarification regarding the demonstration of Additionality in case of transfer of assets (submitted 15 Oct 11): AM_CLA_0223 (175 KB)
Application of combination of large scale methodology ACM0002 and small-scale methodology AMS I.D in a renewable energy PoA (submitted 10 Feb 12): AM_CLA_0227 (152 KB)
Applicability of ACM0002 to existing hydropower plants increasing electricity generation through the construction of a new reservoir (submitted 10 Dec 13): AM_CLA_0254 (107 KB)
Clarifications on updating DATEBaselineRetrofit of ACM0002 and on changing the grid emission factor calculation approach from ex post to ex ante (submitted 13 Nov 18): AM_CLA_0280 (106 KB)

* Only the requests for clarification and revision that have been clarified by the Meth Panel are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.