Call for input on the draft revised methodology ACM0013 "Consolidated baseline and monitoring methodology for new grid connected fossil fuel fired power plants using a less GHG intensive technology — Version 4.0.0"

The Meth Panel seeks inputs on the draft revised methodology ACM0013. Stakeholders are invited to provide their inputs in the commenting table found here.

The call for inputs from public stakeholders was open from 10 April (12:00 GMT) to 20 April 2012 (12:00GMT).

The inputs from this call will be considered at the fifty-sixth meeting of the Meth Panel.

Submission Date Submission
19 April 2012 at 10:35 GMT+2 Kasinag (196 KB)
19 April 2012 at 11:02 GMT+2 Talwandi Sabo Power Limited (110 KB)
19 April 2012 at 11:54 GMT+2 Stephen (125 KB)
19 April 2012 at 12:44 GMT+2 Rajiv Tated (99 KB)
19 April 2012 at 17:31 GMT+2 Pravin Jadhav (26 KB)
20 April 2012 at 06:11 GMT+2 Sujoy Basak (103 KB)
20 April 2012 at 08:11 GMT+2 CDM Watch (168 KB)
20 April 2012 at 10:11 GMT+2 Sierra Club (139 KB)