Call for public input on the revision of the "Standard: Sampling and surveys for CDM project activities and programmes of activities", (11 October to 25 October 2019, 23:59 CEST)

The Methodologies Panel (MP) was seeking inputs on the "Standard: Sampling and surveys for CDM project activities and programmes of activities", as contained in MP 80 Annex 01

The work was carried out in the context of the mandate related to the revision of “AMS-II.G: Energy efficiency measures in thermal applications of non-renewable biomass” and was related to the revision of the "Guideline: Sampling and surveys for CDM project activities and programmes of activities" (EB 99 report, para. 28, EB 102 report, para. 46 and EB103 report, para.  28). The proposed revision included additional requirements and guidance for Designated Operational Entities (DOEs) verifying sampling surveys conducted by project participants and coordinating managing entities.

The scope of the public input was included but not limited to the highlighted text.

Stakeholders were invited to provide their inputs on the Standard in the commenting table found here.

The call for inputs from stakeholders was open (11 October to 25 October 2019, 23:59 CEST)

The public inputs will be taken into account when preparing the final draft of the Standard to be recommended to the Board.