AM_REV_0075: Baseline addition covering projects that increase significantly the use of flared/vent waste gas (project) combined with a smaller amount of waste gas already used for captive power (baseline), generating electricity in a new facility

Reference AM_REV_0075
Submitted by DNV (21 Dec 07)
Request F-CDM-AM-Rev (47 KB)
PDD PDD (1295 KB)
Draft AM Draft AM (443 KB)
Methodologies
Final response Final response (133 KB)
Historic statusesNo status history available