Finalized requests for clarification on approved large scale methodologies

If you are a DOE, please log in to submit a new request. If you are not a DOE, please submit your request to the secretariat at sdm-ssu-methworkflows@unfccc.int.

To submit a request for clarification or revision of an approved SSC and A/R SSC methodology, please send an email to sdm-ssu-methworkflows@unfccc.int using the designated form.


Reference AM_CLA_
Text
Text is looked for in request titles only.
Concerned methodologies
Status
Panel/WG meeting
Only submissions considered during or after Meth Panel 43 may be searched with this criterion. No submissions were allocated for Meth Panels 47, 53, 70, 71, 74, 76, 79, 79, 80, 80, 84 or 84.

There are 321 matching requests:

Displaying 41-60 of 321

Reference Request for clarification Current Status Last update
AM_CLA_0281 Clarification request on the meaning of “new sales” in AM0120 and on the sorting method for obtaining 90th/80th percentile of baseline electricity consumption(EC) in the reference Tool 29 EB link added 02 Apr 19
AM_CLA_0280 Clarifications on updating DATEBaselineRetrofit of ACM0002 and on changing the grid emission factor calculation approach from ex post to ex ante EB link added 02 Apr 19
AM_CLA_0279 Allowing emission reduction claims from CBM extraction projects from virgin coal bed methane EB link added 04 Dec 18
AM_CLA_0278 Calculation of parameter MSy EB link added 27 Apr 18
AM_CLA_0277 Clarification on simplified procedures of additionality in ACM0001 v17.0 EB link added 30 May 17
AM_CLA_0276 Request for clarification for the multipurpose use of hydropower reservoirs under ACM0002 EB link added 27 Apr 18
AM_CLA_0275 Clarification on the survey frequency to determine the baseline emissions EB link added 16 May 16
AM_CLA_0274 Clarification about the applicability condition for using the LFG to supply consumers through natural gas distribution network EB link added 16 May 16
AM_CLA_0273 Reference to a withdrawn tool in ACM0006 EB link added 15 Dec 15
AM_CLA_0272 Clarification on the applicability of a methodology for installation of cogeneration units to supply heat and power EB link added 15 Dec 15
AM_CLA_0271 Clarification on co-gasifying a renewable energy crop with MSW EB link added 28 Jul 15
AM_CLA_0270 Changes in the project boundary due to partially implementation of a CDM Project Activity EB link added 28 Jul 15
AM_CLA_0269 Monitoring of FFCj and FCCj compared to AM0025 EB link added 28 Jul 15
AM_CLA_0268 Applicability of ACM0019(ver.2.0) for facility revamping of a HNO3 production increase EB link added 28 Jul 15
AM_CLA_0267 Calculation of EGpj,y and monitoring in the case of a capacity addition hydro power plant CDM project which was also subject to a retrofit that is not included in the CDM scope EB link added 28 Jul 15
AM_CLA_0266 Clarification on the applicability of ACM0002 to a rehabilitation hydro project when the project activity electricity generation is lower than the historical generation data EB link added 24 Apr 15
AM_CLA_0265 Procedure to determine the amount of methane that would have been captured and destroyed (by flaring) in the baseline (FCH4,BL,y) EB link added 24 Apr 15
AM_CLA_0264 Clarification on the approved methodology ACM0016 version 03 regarding application of Step 3 (to demonstrate additionality) of the methodology to a proposed PoA EB link added 02 Dec 14
AM_CLA_0263 AM0028 correct application of IPCC default value EB link added 02 Dec 14
AM_CLA_0262 Monitoring of εproject,i in case of application of Option D as per ACM009 version 4.0.0 page 6 EB link added 02 Dec 14