07:32 12 Dec 24
AMS-II.H.:
Energy efficiency measures through centralization of utility provisions of an industrial facility --- Version 3.0
Submit comments for improvement of this methodology (please login)
Title |
Energy efficiency measures through centralization of utility provisions of an industrial facility (311 KB)
Word version (340 KB)
Tools referenced in this methodology: |
|
---|---|---|
Version number |
|
|
Scale | Small scale | |
Type | II | |
Status | Active | |
Validity | Valid from 29 Apr 11 onwards | |
Sectoral scope(s) | 4 | |
Clarifications/Revisions* | Clarification on the applicability of AMS-II.H for a new Power and Cooling system in an Industrial facility (submitted 26 Apr 11): SSC_534 (207 KB) | |
Clarification on the applicability of AMS-II.H to project activities promoting waste-heat based chillers (submitted 13 Jul 11): SSC_550 (213 KB) | ||
Previous Versions | ||
Title | Energy efficiency measures through centralization of utility provisions of an industrial facility (261 KB) | |
Version number | 2.0 | |
Validity |
Valid from 11 Jun 10 to 28 Apr 11
Requests for registration can be submitted until 29 Dec 2011 23:59:59 GMT |
|
Sectoral scope(s) | 4 | |
Clarifications/Revisions* | Clarification on the applicability of AMS-II.H for project activity supplying total electricity produced to a grid (submitted 18 Jan 11): SSC_506 (231 KB) | |
Title | Energy efficiency measures through centralization of utility provisions of an industrial facility (299 KB) | |
Version number | 1.0 | |
Validity |
Valid from 14 Mar 08 to 10 Jun 10
Requests for registration can be submitted until 10 Feb 2011 23:59:59 GMT |
|
Sectoral scope(s) | 4 | |
Clarifications/Revisions* | A natural gas based combined cooling/heating and power system which caters to the heating and/or cooling and power requirements of a commercial building complex (submitted 15 Jun 08): SSC_197 (137 KB) | |
Clarification regarding definition/scope of an industrial facility in AMS-II.H (submitted 17 Nov 08): SSC_248 (139 KB) | ||
Clarification regarding baseline of the methodology (submitted 21 Jul 09): SSC_332 (241 KB) | ||
Clarification on the applicability and baseline provisions of AMS-II.H to a Greenfield trigeneration project activity (submitted 09 Mar 10): SSC_394 (191 KB) | ||
Consideration of fugitive emissions due to operation of pre-project chillers (submitted 06 Aug 10): SSC_459 (226 KB) |
* Only the requests for clarification and revision that have been clarified by the SSC WG are displayed. To view all requests for clarification, go to this page. To view all requests for revision, go to this page.
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: