Validate a project activity

Validation is the process of independent evaluation of a project activity by a designated operational entity against the requirements of the CDM as set out in decision 3/CMP.1 , the present annex and relevant decisions of the COP/MOP, on the basis of the project design document, as outlined in Appendix B below.
Decision 3/CMP.1 (735 KB)

Registration is the formal acceptance by the Executive Board of a validated project as a CDM project activity. Registration is the prerequisite for the verification, certification and issuance of CERs related to that project activity. paragraph 36 (a) Annex decision 3/CMP.1 (735 KB)