PoA 8188 : Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
PoA title Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
- PoADD_Shinsung Solar Energy PoA (PoA 8188)_RCP_2nd CP.pdf (1498 KB)

- CDM-PoA-REN-FORM_Shinsung Solar PoA (PoA 8188)_Signed.pdf (67 KB)
CPAs (view all CPAs)
Host Parties Republic of Korea , involved indirectly approval (1481 KB) authorization (1481 KB)
Authorized Participants: Shinsung ENG Co., Ltd. ; Shinsung Solar Energy Co., Ltd. (withdrawn as of 04/07/2022)
Coordinating/Managing Entity Shinsung ENG Co., Ltd.
DOE KSA
Methodology Used AMS-I.D. ver. 18 - Grid connected renewable electricity generation
Standardized baselines used
Validation Report VR for Renewal of CDM PoA (20221005)_Ver. 1.2.pdf (955 KB)
Renewal Date 29 Nov 22   (view history)   completeness check: complete info & rep check: concluded
Renewal Period 13 Nov 19 - 12 Nov 26

Other period(s): 13 Nov 12 - 12 Nov 19
Requests for Issuance
and related documentation