16:49 25 Nov 24
PoA 8188 : Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
PoA title |
Shinsung Solar Energy Grid Connected Photovoltaic Power Generation PoA
- PoADD_Shinsung Solar Energy PoA (PoA 8188)_RCP_2nd CP.pdf (1498 KB) - CDM-PoA-REN-FORM_Shinsung Solar PoA (PoA 8188)_Signed.pdf (67 KB) |
---|---|
CPAs | (view all CPAs) |
Host Parties |
Republic of Korea
, involved indirectly
approval (1481 KB)
authorization (1481 KB)
Authorized Participants: Shinsung ENG Co., Ltd. ; Shinsung Solar Energy Co., Ltd. (withdrawn as of 04/07/2022) |
Coordinating/Managing Entity |
Shinsung ENG Co., Ltd.
|
DOE | KSA |
Methodology Used |
AMS-I.D. ver. 18 - Grid connected renewable electricity generation
|
Standardized baselines used | |
Validation Report | VR for Renewal of CDM PoA (20221005)_Ver. 1.2.pdf (955 KB) |
Renewal Date |
29 Nov 22
(view history)
completeness check: complete
info & rep check: concluded
|
Renewal Period |
13 Nov 19
-
12 Nov 26
Other period(s): 13 Nov 12 - 12 Nov 19 |
Requests for Issuance
and related documentation |
|
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: