Project: 1171 Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the No. 9 nitric acid plant at African Explosives Ltd (“AEL”), South Africa - Request for post-registration changes
Project 1171 Project for the catalytic reduction of N2O emissions with a secondary catalyst inside the ammonia reactor of the No. 9 nitric acid plant at African Explosives Ltd (“AEL”), South Africa
PRC ref PRC-1171-001
Process track Issuance
DOE DNV
Methodology(ies) and/or Standardized Baseline(s)
applied at the post-registration changes
Methodology(ies) list
Standardized baseline(s) list
DOE conducted validation of the changes When performing a verification for the project activity or PoA stated above (See footnote 1 below)
Type of submission Permanent changes from the monitoring plan or the monitoring methodology
  • All changes are in Appendix 1 of the CDM project standard? Yes
Applicable crediting period 05 Nov 07 - 04 Nov 17
Assessment opinion Assessment opinion (189 KB)
Revised PDD Revised PDD (1194 KB)   Revised PDD - track changes (1199 KB)
Supplementary documents
Signed form Signed form (141 KB)
DOE clarification
VVS version VVS 2.0
Current status 23 Oct 14 - Approved
Effective approval date: 23 Oct 14
Historic statuses 24 Sep 14 - Request published