SECTION 1: GENERAL INFORMATION | |
---|---|
Title and UNFCCC reference number of the project activity or programme of activities (PoA) |
9948: "Impact Carbon Global Safe Water Programme of Activities (PoA)" |
Titles and reference numbers of the component project activities (CPAs) covered by the request for issuance |
|
Date of the request for issuance | 2021/01/21 |
Monitoring period to which the request for issuance applies |
2019/05/23 - 2019/12/31 |
UNFCCC reference number of the request for issuance |
9948-MP3-IRP3 |
SECTION 2: BASIS FOR REVIEW REQUEST | |
Please indicate, in accordance with paragraphs 65 of the CDM
modalities and procedures (the annex to decision 3/CMP.1), the issues regarding which you request for review. Please tick the applicable boxes. |
|
Incompetence
|
|
SECTION 3: COMMENTS SUPPORTING REVIEW REQUEST | |
Please elaborate the reason for requesting a review on the issues you indicated in section 2 above | |
1) Refer to paragraph: VVS for PoA version 02, Para 340 (a) The baseline water source is mentioned as piped/ borewell/others etc in the emission reduction sheet. The included CPA-DDs and the monitoring report) indicate that UltraFlo WPS and Multi-barrier UV will be fixed and applicable for piped. However, it is not clear from verification report how the DOE confirmed whether the implementation of the WPS is in accordance with the description provided in the included CPA-DDs and whether the installed WPS is compatible with the available water source. Therefore, the DOE shall verify how it determined that the WPS is implemented in accordance with description contained in the included CPA-DDs and the installed WPS is compatible with the available water source. Please refer to paragraph340(a) of VVS for PoA version 02.
2) Refer to paragraph: VVS-PoA, version 2, paragraph 344, Paragraph 15 of AMS-III.AV version 4 The DOE shall further substantiate how it has verified the compliance of the monitoring plan with the applied methodology, in particular the monitoring frequency of parameter “operational units”, since the CPA-DDs states that the monitoring frequency for the parameter as “At least once per verification or biennially as per the monitoring requirements in the methodology”, which could lead to possibilitieswhereby the monitoring frequency not meeting methodology requirement (i.e. at least once every two years) when the verification / monitoring period is conducted with a time gap of more than two years. Please refer to Paragraph 15 of AMS-III.AV version 4 and VVS-PoA, version 2, paragraph 344
3) Refer to paragraph: VVS for PoA version 02, paragraph 304(.c) The DOE cross-verified continuous availability of safe drinking water based on the interviews with the users and delivery notes, and further confirmed that the subsequent supplies are reported in the emission reduction spreadsheet. However, it is observed in the emission reduction spreadsheet that:
Taking into account the above, the DOE is requested to;
Please refer to paragraph 304(c) of VVS for PoA version 02.
4) Refer to paragraph: VVS-PoA, version 2, paragraph 359 (d). The DOE shall further substantiate how it has verified the appropriateness of applying the entire dayscovered by the monitoring period when calculating parameter QPWy (i.e. quantity of purified water fordrinking during the year y), given the facts that the systems do not service the entire population (i.e. thestudents) during the school holidays. Further, the DOE should also check following clarifications issuedby the Meth Panel in this regard. SSC_795: https://cdm.unfccc.int/methodologies/SSCmethodologies/clarifications/05721 SSC_792: https://cdm.unfccc.int/methodologies/SSCmethodologies/clarifications/57226 Please refer to VVS-PoA, version 2, paragraph 359 (d). |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: