Review Request Form
Submitted Request for Review Form (Version 03.0)
SECTION 1: GENERAL INFORMATION
Title and UNFCCC reference number
of the project activity or
programme of activities (PoA)
8950: "Guacamaya Small Scale Hydropower Programme of Activities"
SECTION 2: BASIS FOR REVIEW REQUEST
Please indicate the relevant requirement(s) for which you have reasonable concern about whether the project activity or PoA complies,
by checking the appropriate box and specifying the relevant requirement(s) in the list below.

SECTION 3: COMMENTS SUPPORTING REVIEW REQUEST
Please elaborate the reason for requesting a review on the issues you indicated in section 2 above

1) Refer to paragraph: paragraph 381 of VVS-PoA

The DOE is requested to explain how it concluded the information that is transferred in the current version of the PoA-DD is materially the same as that in the registered PoA-DD, considering that sections H.3 and H.4 of the PoA-DD indicate the technology as only run-of-river hydro power plants whereas the registered PoA-DD also includes hydro power plants with reservoir.

 

2) Refer to paragraph: paragraphs 378 and 137 of VVS-PoA

As per section C of the PoA-DD, for small scale CPAs, the additionality of the CPAs is to be demonstrated using barrier analysis following the methodological tool 21: “Demonstration of additionality of small-scale project activities”, version 13.1. The DOE is requested to substantiate how the PoA-DD and its eligibility criterion section on additionality are sufficiently objective and comprehensive as: (i) the PoA-DD has not explained how the CPAs would not have occurred anyway due to any the barriers listed in section C of the PoA-DD as required by paragraph 10 of methodological tool 21; (ii) the eligibility criterion on additionality has not set out required conditions for a proposed CPA to be included in the PoA to demonstrate such barriers as required by paragraph 123 of PS-PoA.