Call for public input on the draft consolidated methodology "ACM00XX: Construction of a new natural gas power plant" (2 to 17 September 2014, 24:00 GMT)

The Methodologies Panel sought inputs on the new top-down methodology “ACM00XX: Construction of a new natural gas power plant”, based on the revision of "AM0029: Baseline Methodology for Grid Connected Electricity Generation Plants using Natural Gas" and "AM0087: Construction of a new natural gas power plant supplying electricity to the grid or a single consumer". The draft new consolidated methodology, among others, aims to simplify and improve consistency in the areas of baseline determination and estimation of leakage emissions on account of CO2 from gas reservoirs.

Stakeholders were invited to provide their inputs on the new consolidated methodology, as contained in annex 2 of the report of the 64th meeting of the Methodologies Panel. Stakeholders are invited to provide their inputs in the commenting table found here .

The call for inputs from stakeholders was open from 2 to 17 September 2014 (24:00 GMT).

The inputs from this call will be considered at the sixty-fifth meeting of the Methodologies Panel.