Call for public input on the revision of the methodology "ACM0016: Mass Rapid Transit Projects" (13 to 27 April 2021, 23:59 CEST)

The Methodologies Panel (MP) was seeking inputs on the revision of the methodology “ACM0016: Mass Rapid Transit Projects”, as contained in MP 84 Annex 04

The work was carried out in response to the mandate by the Board at its 106th meeting (EB 106 report, para. 40) to revise the methodologies ACM0016 and AM0031 to ensure consistency with the “Standard: Sampling and surveys for CDM project activities and programmes of activities” and the “Guideline: Sampling and surveys for CDM project activities and programmes of activities”. In addition, this work is being undertaken to improve consistency with methodology AM0031 as mandated by the Board at its 102nd meeting (EB 102 report, para. 40).

The scope of the public input included but was not limited to the highlighted text.

Stakeholders were invited to provide their inputs on the methodology in the commenting table found here.

The call for inputs from stakeholders is open (13 to 27 April 2021, 23:59 CEST)

The public inputs will be taken into account when preparing the final draft of the methodology to be recommended to the Board.