Call for public input on the revision of the methodology "AMS-II.E: Energy efficiency and fuel switching measures for buildings", (18 March to 1 April 2020, 23:59 CEST)

The Methodologies Panel (MP) was seeking inputs on the revision of the methodology "AMS-II.E: Energy efficiency and fuel switching measures for buildings", as contained in MP 81 Annex 03

The work was carried out in response to the mandate from the Board at its 103rd meeting (EB103 report, para. 35) to revise the methodology to include methods and equations to calculate emission reductions for projects that do not apply "TOOL31: Determination of standardized baselines for energy efficiency measures in residential, commercial and institutional buildings".

The scope of the public input included but was not limited to the highlighted text.

Stakeholders were invited to provide their inputs on the methodology in the commenting table found here.

The call was extended for inputs from stakeholders and was open (18 March to 1 April 2020, 23:59 CEST)

 

The public inputs will be taken into account when preparing the final draft of the methodology to be recommended to the Board.

Submission Date Submission
30 March 2020 at 06:58 GMT+2 leesehui (70 KB)