Call for public input on "TOOL21: Demonstration of additionality of small-scale project activities" (21 June to 5 July 2018, 24:00 GMT)

The Methodologies Panel (MP) was seeking inputs on the revision of “TOOL21: Demonstration of additionality of small-scale project activities” as contained in MP 76 Annex 16

The revision is being carried out to ensure a timely recommendation by the MP on the update of the positive list.

The scope of the public input included but was not limited to the highlighted text.

Stakeholders were invited to provide their inputs on the methodological tool in the commenting table found here.

The call for inputs from stakeholders was open (21 June to 5 July 2018, 24:00 GMT)

The public inputs will be taken into account when preparing the final draft methodological to be recommended to the Board.

Submission Date Submission
05 July 2018 at 18:35 GMT+2 AERA Group (77 KB)