Call for input on the revisions of fossil fuel cogeneration methodologies (AM0048, AM0107 and ACM0026) to incorporate a flowchart to navigate through (11 July to 26 July 2016, 24:00 GMT)

The MP is seeking inputs on revisions of fossil fuel cogeneration methodologies:

(a) "AM0048: New cogeneration project activities supplying electricity and heat to multiple customers”, as contained in MP70 Annex 13

(b) "AM0107: New natural gas based cogeneration plant“, as contained in MP70 Annex 14

(c) "ACM0026: New natural gas based cogeneration plant”, as contained in MP70 Annex 15

The Board requested the MP at its eighty-ninth meeting (EB89 report, para. 38) to prepare a flowchart to help project participants navigate through fossil fuel cogeneration methodologies and include this in the draft revisions of relevant methodologies accordingly.

Stakeholders are invited to provide their inputs on the draft revisions of the methodologies in the commenting table found here.

The scope of the public input shall include but is not limited to text highlighted in the draft revision of the methodologies.

The call for inputs from stakeholders is open from 11 July to 26 July 2016 (24:00 GMT).

The public inputs will be taken into account when preparing the draft revised methodologies to be recommended to the Board at a future meeting.