Call for input on the draft revision of the standard "Sampling and surveys for CDM project activities and programme of activities" (11 July to 8 August 2015, 24:00 GMT)

The SSC WG sought inputs on the top-down revision of the approved: 

  • Standard “Sampling and surveys for CDM project activities and programme of activities”,

The draft revision was carried out in response to the approved workplan of panels and working groups for 2015 (EB 82 report, annex 2) and the workplan of the project “Simplification of methodologies including digitization to reduce transaction costs” (EB 82 report, annex 8). 

Stakeholders were invited to provide their inputs on the draft revision of the standard and guideline, as contained in annex 12  of the report of the 48th meeting of the SSC WG. Stakeholders were invited to provide their inputs in the commenting table found here.

The scope of the public input shall include but is not limited to text highlighted in the draft revised documents, as contained in annex 12 of the report of the 48th meeting of the SSC WG.

The call for inputs from stakeholders was open from 11 July to 8 August 2015 (24:00 GMT).

No input was received.