Call for public input on the draft revision of "AM0091: Energy efficiency technologies and fuel switching in new and existing buildings" (31 March to 14 April 2015, 24:00 GMT)

The Methodologies Panel seeks inputs on the top-down revision of “AM0091: Energy efficiency technologies and fuel switching in new and existing buildings”. The draft revision provides a consistent approach for the estimation of upstream leakage emissions.

Stakeholders are invited to provide their inputs on the draft revision of the methodology, as contained in annex 15 of the report of the 66th meeting of the Methodologies Panel using the commenting table found here.

The scope of the public input shall include but is not limited to text highlighted in the draft revised methodology, as contained in annex 15 of the report of the 66th meeting of the Methodologies Panel.

The call for inputs from stakeholders was open from 31 March to 14 April 2015 (24:00 GMT).

No comments were received.