Call for public input on the draft revision of "ACM0016: Mass Rapid Transit Projects" (7 to 22 November 2014, 24:00 GMT)
The Methodologies Panel seeks inputs on the top-down revision of “ACM0016: Mass Rapid Transit Projects”. The draft revision improves the procedures for additionality demonstration and improves the guidance on the renewal of the crediting period.
Stakeholders are invited to provide their inputs on the draft revision of the methodology, as contained in annex 14 of the report of the 65th meeting of the Methodologies Panel. Stakeholders are invited to provide their inputs in the commenting table found here.
The scope of the public input shall include but is not limited to text highlighted in the draft revised consolidated methodology, as contained in annex 14 of the report of the 65th meeting of the Methodologies Panel.
The call for inputs from stakeholders was open from 7 to 22 November 2014 (24:00 GMT).
The inputs from this call will be considered at the sixty-sixth meeting of the Methodologies Panel.
Submission Date | Submission |
---|---|
17 November 2014 at 12:46 GMT+1 | juerg gruetter (433 KB) |
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: