04:45 11 Nov 24
CDM activities requested for transition to the Article 6.4 mechanism
Published cases
Project number | Project name | Project type | FP email | Host country | Applied methodology | Replacement with Article 6.4 mechanism methodology | CPAs | Submission date | State |
---|---|---|---|---|---|---|---|---|---|
2585 | Fertinal Nitrous Oxide Abatement Project | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/10 22:03 | GSC ended without comments | ||
2569 | Reforestation as Renewable Source of Wood Supplies for Industrial Use in Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 21:06 | GSC ended without comments | ||
6917 | Ningxia Tongxin (Zhangjiayuan) Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 09:04 | GSC ended without comments | ||
2843 | Taohe Yangjiahe Hydropower Project, Gansu Province, China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/13 09:16 | GSC ended without comments | ||
10643 | Methane avoidance in rice cultivation | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 14:05 | GSC ended without comments | ||
9952 | Bundled Wind Project in RTK | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 14:07 | GSC ended without comments | ||
10548 | Quinta PV CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/03 05:51 | GSC ended without comments | ||
10476 | KOKO Kenya - Ethanol Cookstoves Program | PoA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10476-P1-0001-CP1 , 10476-P1-0002-CP1 | 2023/11/07 13:12 | GSC ended without comments | |
8039 | Yeongam F1 Circuit Photovoltaic Power Plant CDM project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/24 08:38 | GSC ended without comments | ||
7212 | CGN Tongyu Xinfa B wind farm project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:53 | GSC ended without comments | ||
10166 | Emission reduction on account of process modification at Aluminium metal recycling unit | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 09:29 | GSC ended without comments | ||
6635 | Cuel Wind Farm Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 20:38 | GSC ended without comments | ||
8723 | Huaneng Maoming Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 06:34 | GSC ended without comments | ||
5882 | Huolinhe Dongshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:16 | GSC ended without comments | ||
10063 | Energy Efficiency Measures at MindSpace Building No 14 at Hyderabad | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 05:54 | GSC ended without comments | ||
10205 | Energy efficiency measures at Mindspace Airoli Building No 3, 8 and 14 of Serene Properties Pvt Ltd at Navi Mumbai | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 06:03 | GSC ended without comments | ||
10406 | Energy efficiency measures at Mindspace, Hyderabad, Building no. 12A, 12B, 12C& 20 of Sundew Properties Ltd. | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 06:05 | GSC ended without comments | ||
1366 | Biomass generation project, in Sheyang county, Jiangsu province, P.R. China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:28 | GSC ended without comments | ||
1485 | Lishiluo Erji 6.4MW Small Hydropower Project in Yunnan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:29 | GSC ended without comments | ||
5999 | Eco Energy Beer Tuvya - Animal manure anaerobic treatment facility | PA | Israel | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:06 | GSC ended without comments | ||
10110 | 8.4 MW renewable energy based power generation by Hi-Tech | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:05 | GSC ended without comments | ||
4175 | Douala Landfill gas recovery and flaring project | PA | Cameroon | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:05 | GSC ended without comments | ||
9879 | Fengcheng Yuhuashan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 09:00 | GSC ended without comments | ||
9985 | Bundled Wind Power Project in Tamilnadu, India, co-ordinated by Tamilnadu Spinning Mills Association (TASMA-II (B)) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 09:25 | GSC ended without comments | ||
9956 | Up Energy Improved Cookstove Programme, Uganda | PoA | Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9956-P1-0001-CP1 , 9956-P1-0002-CP1 , 9956-P1-0003-CP1 , 9956-P1-0004-CP1 , 9956-P1-0005-CP1 , 9956-P1-0006-CP1 , 9956-P1-0007-CP1 , 9956-P1-0008-CP1 , 9956-P1-0009-CP1 , 9956-P1-0010-CP1 , 9956-P1-0011-CP1 , 9956-P1-0012-CP1 , 9956-P1-0013-CP1 , 9956-P1-0014-CP1 , 9956-P1-0015-CP1 , 9956-P1-0016-CP1 , 9956-P1-0017-CP1 , 9956-P1-0018-CP1 , 9956-P1-0019-CP1 , 9956-P1-0020-CP1 , 9956-P1-0021-CP1 , 9956-P1-0022-CP1 , 9956-P1-0023-CP1 , 9956-P1-0024-CP1 , 9956-P1-0025-CP1 , 9956-P1-0026-CP1 , 9956-P1-0027-CP1 , 9956-P1-0028-CP1 , 9956-P1-0029-CP1 , 9956-P1-0030-CP1 , 9956-P1-0031-CP1 , 9956-P1-0032-CP1 , 9956-P1-0033-CP1 , 9956-P1-0034-CP1 , 9956-P1-0035-CP1 , 9956-P1-0036-CP1 , 9956-P1-0037-CP1 , 9956-P1-0038-CP1 , 9956-P1-0039-CP1 , 9956-P1-0040-CP1 , 9956-P1-0041-CP1 , 9956-P1-0042-CP1 , 9956-P1-0043-CP1 , 9956-P1-0044-CP1 , 9956-P1-0045-CP1 , 9956-P2-0046-CP1 , 9956-P2-0047-CP1 , 9956-P2-0048-CP1 , 9956-P2-0049-CP1 , 9956-P2-0050-CP1 , 9956-P2-0051-CP1 , 9956-P2-0052-CP1 , 9956-P2-0053-CP1 , 9956-P2-0054-CP1 , 9956-P2-0055-CP1 , 9956-P2-0056-CP1 , 9956-P2-0057-CP1 , 9956-P2-0058-CP1 , 9956-P2-0059-CP1 , 9956-P2-0060-CP1 , 9956-P2-0061-CP1 , 9956-P2-0062-CP1 | 2023/12/21 15:07 | GSC ended without comments | |
1955 | Hubei Laifeng Najitan Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:40 | GSC ended without comments | ||
10336 | Bundled Renewable Power Project by Sharma Industries (EKIESL-CDM.December-14-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:57 | GSC ended without comments | ||
9442 | Renewable Energy based PoA in Pakistan | PoA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9442-P1-0001-CP1 , 9442-P2-0002-CP1 , 9442-P2-0003-CP1 , 9442-P2-0004-CP1 , 9442-P2-0005-CP1 | 2023/11/14 13:48 | GSC ended without comments | |
10186 | Accelerating Electrification through Grid Extension and Off-Grid Electrification in Rural Areas of Uganda | PoA | Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10186-P1-0001-CP1 , 10186-P1-0002-CP1 | 2023/12/28 20:12 | GSC ended without comments | |
8083 | Huaneng Jimo Fengcheng Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:26 | GSC ended without comments | ||
0557 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Pakarab Fertilizer Ltd (PVT) in Multan, Pakistan | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/03 12:24 | GSC ended without comments | ||
4709 | 3.2 MW wind power project of Agro Solvent Products Pvt. Ltd. at Jodha village of Jaisalmer district in Rajasthan state” | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 06:12 | GSC ended without comments | ||
2598 | Huaneng Jilin Tongyu Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:57 | GSC ended without comments | ||
5141 | 19.5 MW Wind project by GMDC | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 10:31 | GSC ended without comments | ||
2766 | Gansu Jingtai 45MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/26 08:43 | GSC ended without comments | ||
4233 | Yunnan Sigangli 18.9MW Hydro Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 03:59 | GSC ended without comments | ||
4900 | Huaneng Tongliao Kezuozhongqi Haorigetu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:50 | GSC ended without comments | ||
5912 | Inner Mongolia Ximeng Huitengliang Area A Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 09:19 | GSC ended without comments | ||
6328 | National Solar Power Development Programme, India | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6328-P1-0007-CP1 , 6328-P1-0008-CP1 , 6328-P1-0009-CP1 , 6328-P1-0010-CP1 | 2023/07/10 12:13 | GSC ended without comments | |
6090 | Fuchuan Longtou Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:38 | GSC ended without comments | ||
1327 | Inner Mongolia Zhuozi 40MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 07:33 | GSC ended without comments | ||
2048 | Lufeng 36MW Hydropower Project in Yunnan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:43 | GSC ended without comments | ||
8515 | Ning’an Jingbo Toudaoling Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 06:47 | GSC ended without comments | ||
7749 | Huaneng Haiyang Guocheng Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:43 | GSC ended without comments | ||
10699 | Safe Drinking Water Programme in Least Developed Countries | PoA | Rwanda | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA Only
|
2023/10/08 13:56 | GSC ended without comments | ||
5979 | Methane recovery and combustion with renewable energy generation from anaerobic animal manure management systems under the Land Bank of the Philippines‘s (LBP) Carbon Finance Support Facility | PoA | Philippines | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
5979-P1-0003-CP1 , 5979-P1-0004-CP1 , 5979-P1-0005-CP1 , 5979-P1-0006-CP1 , 5979-P1-0007-CP1 , 5979-P1-0008-CP1 , 5979-P1-0009-CP1 , 5979-P1-0010-CP1 , 5979-P1-0011-CP1 , 5979-P1-0012-CP1 , 5979-P1-0013-CP1 , 5979-P1-0014-CP1 , 5979-P1-0015-CP1 , 5979-P1-0016-CP1 , 5979-P1-0017-CP1 , 5979-P1-0018-CP1 , 5979-P1-0019-CP1 , 5979-P1-0020-CP1 , 5979-P1-0021-CP1 , 5979-P1-0022-CP1 , 5979-P1-0023-CP1 , 5979-P1-0024-CP1 , 5979-P1-0025-CP1 , 5979-P1-0026-CP1 , 5979-P1-0027-CP1 , 5979-P1-0028-CP1 , 5979-P1-0029-CP1 , 5979-P1-0030-CP1 , 5979-P1-0031-CP1 , 5979-P2-0001-CP2 , 5979-P2-0002-CP2 | 2023/12/15 20:39 | GSC ended without comments | |
3512 | Gansu Datang Changma Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 06:08 | GSC ended without comments | ||
9876 | Furong River Haokou Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 02:33 | GSC ended without comments | ||
7875 | Sunite Phase IV 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:36 | GSC ended without comments | ||
7363 | Wind Project in Gujarat by Surajbari Windfarm Development Pvt. Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 12:09 | GSC ended without comments | ||
8892 | Biomass based power project in Punjab | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 11:49 | GSC ended without comments | ||
9625 | Electricity Generation using renewable wind energy by Sahyadri Industries Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 12:41 | GSC ended without comments | ||
9927 | Bundled wind power project at Satara, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 12:42 | GSC ended without comments | ||
5425 | Wind Power Project of Hindustan Platinum in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:10 | GSC ended without comments | ||
10364 | Bundled Renewable Power Project by Jai Bharat Gp (EKIESL-CDM.April16-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:10 | GSC ended without comments | ||
5239 | 16.5 MW Wind Power Project in Surajbari, Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:12 | GSC ended without comments | ||
10122 | 6 MW Solar Power Project by Arhyama Solar Power | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:12 | GSC ended without comments | ||
9515 | 18 MW Wind Power Project in Kutch (Gujarat in India) managed by Aarvee Denims & Exports Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:12 | GSC ended without comments | ||
6491 | Wind power project by HIL at Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:12 | GSC ended without comments | ||
2688 | Fugong Labuluo Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/09 14:20 | GSC ended without comments | ||
5351 | Huaneng Wuchuan Shilatu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:04 | GSC ended without comments | ||
9655 | Tuokexun Wind Farm Phase III Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 07:38 | GSC ended without comments | ||
5563 | Low Temperature Waste Heat Power Generation Project in Anqiu Sunnsy Cement Corporation Limited | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/01 05:18 | GSC ended without comments | ||
10623 | Guajira I Wind Farm | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 21:14 | GSC ended without comments | ||
7858 | Electricity generation from renewable sources – Salto Góes Small Hydro Power Plant | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2024/03/22 20:13 | GSC ended without comments | ||
8173 | Datang Balikun Santanghu Wind Power 49.5MW Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:32 | GSC ended without comments | ||
3840 | Chongqing Siyanping 49.3MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:57 | GSC ended without comments | ||
5137 | CGN Guangdong Wencun Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:32 | GSC ended without comments | ||
1590 | China Tongwan Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 10:26 | GSC ended without comments | ||
5821 | Clean Energy generation from wind energy in the state of Andhra Pradesh. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 09:08 | GSC ended without comments | ||
10100 | Bundled Charmadi Mini Hydel and Aniyur Hole Small Hydro Project at Karnataka, India. | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/21 08:14 | GSC ended without comments | ||
9615 | Bundled Wind Power Project by EKI Energy Services Ltd. (EKIESL-CDM.January-12-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:21 | GSC ended without comments | ||
10027 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.September-12-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:21 | GSC ended without comments | ||
3793 | Pindó Biomass Energy Generation from Forest Biomass | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 21:21 | GSC ended without comments | ||
9252 | Broadlands Hydropower Project | PA | Sri Lanka | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/31 08:20 | GSC ended without comments | ||
10416 | Sustainable Fuel Production Using Agricultural By-product In Place Of Traditional Wood Charcoal | PoA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 03:31 | GSC ended without comments | ||
6253 | Henan Yuxi Yanshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:25 | GSC ended without comments | ||
8016 | Tianrun Laixi Nanshu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:41 | GSC ended without comments | ||
7416 | Grid Connected Wind Energy Project in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 11:27 | GSC ended without comments | ||
1570 | Granja Tres Arroyos Methane Avoidance in Slaughterhouse Effluents Project | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/03 17:33 | GSC ended without comments | ||
6284 | Datang Dongping Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:51 | GSC ended without comments | ||
6545 | Yunnan Eryuan Fengle Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:04 | GSC ended without comments | ||
2765 | Installation of Solar Home Systems in Bangladesh | PoA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2765-P1-0010-CP1 , 2765-P1-0011-CP1 , 2765-P1-0013-CP1 , 2765-P2-0001-CP2 , 2765-P2-0002-CP2 , 2765-P2-0003-CP2 , 2765-P2-0004-CP2 , 2765-P2-0005-CP2 , 2765-P2-0006-CP2 , 2765-P2-0007-CP2 , 2765-P2-0008-CP2 , 2765-P2-0009-CP2 , 2765-P2-0010-CP2 , 2765-P2-0011-CP2 , 2765-P2-0012-CP2 , 2765-P2-0013-CP2 , 2765-P2-0014-CP1 | 2023/12/14 14:33 | GSC ended without comments | |
9954 | Santa Teresa Hydropower Plant | PA | Peru | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/16 21:52 | GSC ended without comments | ||
8606 | Wind Power Project at Vaspet, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/21 09:42 | GSC ended without comments | ||
10268 | Ethiopia – Clean Cooking Energy Program | PoA | Ethiopia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10268-P1-0001-CP1 , 10268-P1-0002-CP1 | 2023/12/08 20:38 | GSC ended without comments | |
5136 | CGN Guangdong Duanfen Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:28 | GSC ended without comments | ||
7983 | Adjaristsqali Hydro Project | PA | Georgia | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/13 09:43 | GSC ended without comments | ||
3303 | CGN Inner Mongolia Huitengliang Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 09:14 | GSC ended without comments | ||
4974 | Song Tranh 3 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:28 | GSC ended without comments | ||
10431 | Improved cookstove program in Bangladesh supported by the Republic of Korea | PoA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10431-P1-0001-CP1 , 10431-P1-0002-CP1 , 10431-P1-0003-CP1 , 10431-P1-0004-CP1 , 10431-P1-0005-CP1 | 2023/11/15 07:39 | GSC ended without comments | |
1869 | Inner Mongolia Chifeng Dongshan Phase II 50MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 08:07 | GSC ended without comments | ||
4211 | Manaus Landfill Gas Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/04 21:51 | GSC ended without comments | ||
0953 | Birahi Ganga Hydro Electric Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 07:13 | GSC ended without comments | ||
1247 | URBAM/ARAUNA - Landfill Gas Project (UALGP) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/16 15:01 | GSC ended without comments | ||
2617 | Inner Mongolia Chifeng Saihanba Qingmachang Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 08:23 | GSC ended without comments | ||
3602 | Energy Efficiency measure at Grasim, Kotputli. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 09:30 | GSC ended without comments | ||
9804 | Wind Electricity Generation at Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/05/03 11:33 | GSC ended without comments | ||
5145 | 18 MW Singatalur-Huligudda Mini Hydel Project, Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 08:08 | GSC ended without comments | ||
3080 | Huaneng Inner Mongolia Keyouzhongqi Gaoliban Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:09 | GSC ended without comments | ||
5661 | Inner Mongolia Xing’an League KeyouqianQi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 08:37 | GSC ended without comments | ||
6262 | Yunnan Wanjiakouzi Hydro Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 02:35 | GSC ended without comments | ||
1987 | Sichuan Pingwu Xiannvbao Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 09:26 | GSC ended without comments | ||
10327 | Grid-connected Solar PV project in Méouane | PA | Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 20:20 | GSC ended without comments | ||
3461 | Rio Amoya Run-of-River Hydro Project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/01 18:45 | GSC ended without comments | ||
6854 | Yunnan Puer Mengyejiang Hydro Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 08:27 | GSC ended without comments | ||
10248 | 3.3 MW Wind Power Project by Classic Marble (EKIESL-CDM.December-14-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 15:42 | GSC ended without comments | ||
10538 | Development of a sustainable drinking water supply platform based on clean development mechanism | PoA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10538-P1-0001-CP1 , 10538-P1-0002-CP1 | 2023/08/25 05:04 | GSC ended without comments | |
3453 | CGN Inner Mongolia Zhurihe Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 03:04 | GSC ended without comments | ||
6793 | Datang Jia County Yunyang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 03:00 | GSC ended without comments | ||
7869 | Dunhuang 9MW solar power project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:33 | GSC ended without comments | ||
2483 | Inner Mongolia Wuliji Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 04:12 | GSC ended without comments | ||
5283 | Hebei Yuxian Chashan 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 08:01 | GSC ended without comments | ||
8555 | Xinjiang Hami Southeast Wind Zone Yandun Third Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:58 | GSC ended without comments | ||
2764 | Yantai Dongyuan Laizhou 48.5 MW Wind Farm Project Phase I | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 02:08 | GSC ended without comments | ||
1994 | Yunnan Lincang Zhenai Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/09 14:30 | GSC ended without comments | ||
10661 | Methane capture project | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 09:01 | GSC ended without comments | ||
2856 | 51 MW wind power project of ONGC at Surajbari, Gujarat in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:13 | GSC ended without comments | ||
10667 | Fuel switching, energy efficiency and renewable energy in ceramic industries | PoA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 18:32 | GSC ended without comments | ||
1128 | Shandong Weihai 69 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:29 | GSC ended without comments | ||
3784 | Huaneng Shanxi Ningwu Dongmafang Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:34 | GSC ended without comments | ||
4942 | Cepco Wind Power Project in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 09:46 | GSC ended without comments | ||
5514 | Henan Dengzhou Biomass cogeneration Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 07:53 | GSC ended without comments | ||
9981 | Domestic Cooking Stoves substitution programme in Mozambique | PoA | Mozambique | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 10:35 | GSC ended without comments | ||
5305 | Amayo Phase II Wind Power Project | PA | Nicaragua | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 23:44 | GSC ended without comments | ||
1410 | Irani Wastewater Methane Avoidance Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/05 19:58 | GSC ended without comments | ||
6656 | Guazhou Daliang East 47.5 MW large scale wind turbine wind farm project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:00 | GSC ended without comments | ||
10743 | San Miguel 42 MW hydroelectric project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 16:31 | GSC ended without comments | ||
6881 | Yuxian Dongxinghe 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 09:55 | GSC ended without comments | ||
7199 | Huadian Sichuan Mulihe Kajiwa Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/22 09:42 | GSC ended without comments | ||
6657 | Guazhou Daliang North 47.5 MW large scale wind turbine wind farm project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:05 | GSC ended without comments | ||
6479 | Huaneng Gansu Qiaowan Sanbei Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:34 | GSC ended without comments | ||
9487 | 9.9 MW Bundled Wind Power Project in Tirupur, Tamilnadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 07:49 | GSC ended without comments | ||
0290 | Youngduk Wind Park Project | PA | Republic of Korea | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/10/04 08:43 | GSC ended without comments | ||
8835 | CTGNE Golmud phase II 20 MWp Solar PV Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 15:25 | GSC ended without comments | ||
7716 | 7.2 MW grid connected wind electricity generation project in Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 08:56 | GSC ended without comments | ||
7438 | Biomass based thermal energy generation at Pashupati Polytex, Uttarakhand, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 09:00 | GSC ended without comments | ||
5251 | Korea Land & Housing Corporation (LH Corporation)’s National Rental House PV power plant bundling CDM project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/10 10:06 | GSC ended without comments | ||
6057 | Datang New Energy Chayouhouqi Hanwula Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 08:34 | GSC ended without comments | ||
2072 | Fuhui Inner Mongolia Narenbaolige Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 09:50 | GSC ended without comments | ||
7942 | Pujiangling MSW Incineration for Power Generation Project in Fujian Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 10:47 | GSC ended without comments | ||
6113 | Wind power project at Landewadi by SIIL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 11:40 | GSC ended without comments | ||
10521 | 22 MW Solar Power Project by HZL at Rampura agucha Mine, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:52 | GSC ended without comments | ||
8550 | Huaneng Xinjiang Balikun Santanghu Second Wind Farm Phase I 49.5MW Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 14:13 | GSC ended without comments | ||
1026 | A.T. Biopower Rice Husk Power Project in Pichit, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 23:41 | GSC ended without comments | ||
9394 | Double A Ethanol wastewater treatment plant | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:17 | GSC ended without comments | ||
7443 | Biomass based power generation by Haveri Bioenergy Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:17 | GSC ended without comments | ||
4081 | Cleaner Technology in Electricity Production | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:17 | GSC ended without comments | ||
10076 | Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.September-13-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:18 | GSC ended without comments | ||
3633 | A project of biogas production from waste water of tapioca starch plant to substitute the use of bunker oil at Udornthani Province, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:18 | GSC ended without comments | ||
9045 | Sapthip Wastewater Management and Methane Capturing for Heating and Electricity generation | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:19 | GSC ended without comments | ||
4574 | Wastewater Treatment with Biogas System in Palm Oil Mill at Sinpun, Surat Thani, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:22 | GSC ended without comments | ||
4479 | Wastewater Treatment with Biogas System in Palm Oil Mill at Kanjanadij, Surat Thani, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:19 | GSC ended without comments | ||
4589 | Wastewater Treatment with Biogas System in Palm Oil Mill at Bangsawan, Surat Thani, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:19 | GSC ended without comments | ||
4491 | Wastewater Treatment with Biogas System in Palm Oil Mill at Saikhueng, Surat Thani, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:19 | GSC ended without comments | ||
0911 | ESTRE Itapevi Landfill Gas Project (EILGP) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 01:10 | GSC ended without comments | ||
7213 | Changli Datan 48MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 09:58 | GSC ended without comments | ||
7040 | 5.5MW Bundled Photovoltaic power generation project in KOWEPO | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/24 08:40 | GSC ended without comments | ||
9212 | 4.80 MWrenewable energy project by Aleo Manali Hydropower Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/21 11:07 | GSC ended without comments | ||
9875 | Bundled Wind Power Project- EnKing International (CDM.June-10-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/20 10:56 | GSC ended without comments | ||
6013 | 19.5 MW Wind Power Project of NuPower Renewables Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/04 11:27 | GSC ended without comments | ||
10703 | PoA for the dissemination of clean cooking technologies in households and communities | PoA | Madagascar,Nigeria | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 12:56 | GSC ended without comments | ||
1229 | Catalytic N2O destruction project in the tail gas of the nitric acid plant PANNA 3 of Enaex S.A. | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 15:14 | GSC ended without comments | ||
5133 | CGN Guangdong Guanghai Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:26 | GSC ended without comments | ||
8364 | Toabré Wind Farm | PA | Panama | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 22:13 | GSC ended without comments | ||
0135 | PROJECT FOR THE REFURBISHMENT AND UPGRADING OF DOLEGA HYDROPOWER PLANT (PANAMA). | PA | Panama | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/27 17:02 | GSC ended without comments | ||
2615 | Inner Mongolia Chifeng Saihanba Tashanzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 08:06 | GSC ended without comments | ||
2932 | Tao River Lianlu Cascade II (Xiacheng) 37.5MW Hydropower Project in Gansu Province, China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 15:31 | GSC ended without comments | ||
10634 | 10 MW Solar Power Project by Krishna Wind Farm Developers Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/04 08:12 | GSC ended without comments | ||
0122 | Agua Fresca Multipurpose and environmental services project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 16:59 | GSC ended without comments | ||
9666 | Promoting Efficient Stove Dissemination and Use in West Africa. | PoA | Togo,Burkina Faso,Ghana,Mali,Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 10:15 | GSC ended without comments | ||
8398 | Huaneng Guangdong Raoping Suocheng Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 14:04 | GSC ended without comments | ||
7019 | CGN Shagou Phase I Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:08 | GSC ended without comments | ||
0052 | Salvador da Bahia Landfill Gas Management Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 23:58 | GSC ended without comments | ||
8242 | CTR Rosario Landfill Gas Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 13:16 | GSC ended without comments | ||
6427 | Huaneng Tongliao Baolongshan Phase IV Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:11 | GSC ended without comments | ||
5125 | Improving Kiln Efficiency in the Brick Making Industry in Bangladesh | PA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 08:22 | GSC ended without comments | ||
9558 | Improved Cookstoves Program for Malawi and cross-border regions of Mozambique | PoA | Malawi | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
9558-P1-0001-CP1 , 9558-P1-0002-CP1 , 9558-P1-0003-CP1 , 9558-P1-0004-CP1 , 9558-P1-0005-CP1 | 2023/11/01 18:43 | GSC ended without comments | |
7491 | Wind power project in Maharashtra, India – Andhra Lake Phase - II | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 11:24 | GSC ended without comments | ||
1134 | ESTRE Pedreira Landfill Gás Project (EPLGP) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/15 17:16 | GSC ended without comments | ||
5186 | Vaayu India Wind Power Project in Jaisalmer, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 09:58 | GSC ended without comments | ||
1575 | Kadamane Mini Hydel Scheme-1 (KMHS-1) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 11:46 | GSC ended without comments | ||
6750 | Huaneng Shanxi Yuanping Duanjiapu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:15 | GSC ended without comments | ||
7842 | Grid-connected renewable energy project in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 12:14 | GSC ended without comments | ||
3879 | Gansu Huangshui Baichuan Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 04:04 | GSC ended without comments | ||
10034 | SHPS POÇO FUNDO AND PROVIDĘNCIA CDM PROJECT (JUN1133), BRAZIL | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/02 19:09 | GSC ended without comments | ||
2426 | El Platanal Hydropower Plant | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 20:47 | GSC ended without comments | ||
6210 | Marańon Hydroelectric Project | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 20:49 | GSC ended without comments | ||
4661 | Samdal Wind Power project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/17 04:19 | GSC ended without comments | ||
10430 | Man and Man Enterprise Improved Cooking Stoves CDM Programme in Ghana supported by Republic of Korea | PoA | Ghana | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10430-P1-0001-CP1 , 10430-P1-0002-CP1 | 2023/08/22 16:07 | GSC ended without comments | |
5960 | Bajo Frío Hydro Power Project | PA | Panama | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/22 20:50 | GSC ended without comments | ||
9705 | Programme of Activities for Small Scale Hydropower CDM in Sri Lanka | PoA | Sri Lanka | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9705-P1-0002-CP1 , 9705-P1-0003-CP1 , 9705-P1-0004-CP1 , 9705-P1-0005-CP1 , 9705-P1-0006-CP1 , 9705-P1-0007-CP1 , 9705-P1-0008-CP1 , 9705-P1-0009-CP1 , 9705-P1-0010-CP1 , 9705-P1-0011-CP1 | 2023/09/15 01:58 | GSC ended without comments | |
6642 | Substitution of coal with alternate fuels at DG Khan Cement Company Limited, Khairpur Plant | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 13:01 | GSC ended without comments | ||
10071 | Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.June-13-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 12:31 | GSC ended without comments | ||
10026 | Wind Power Project by Rajasthan Gum Private Limited (EKIESL-CDM.September-12-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:10 | GSC ended without comments | ||
9485 | Bundle Wind Power Project – EnKing International (CDM.OCT-09-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:10 | GSC ended without comments | ||
10472 | Mangdechhu Hydroelectric Project Authority | PA | Bhutan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/11 10:39 | GSC ended without comments | ||
3060 | Shanxi Wulushan 2nd phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 08:52 | GSC ended without comments | ||
4320 | Huaneng Fuxin Zhangbei Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:33 | GSC ended without comments | ||
5662 | HPP Ashta | PA | Albania | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 17:41 | GSC ended without comments | ||
9918 | 2.1 MW Wind Power Project by Kaizen Switchgear Products in Rajkot District of Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:47 | GSC ended without comments | ||
4197 | Bundled Wind Power Project in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:47 | GSC ended without comments | ||
5010 | 1.65 MW Wind Power Project in Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:47 | GSC ended without comments | ||
5433 | Electricity generation using renewable wind energy | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:46 | GSC ended without comments | ||
6912 | Grid connected Wind Power Generation Project by PSW | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:47 | GSC ended without comments | ||
9586 | 1.5 MW Wind Power Project in Rajasthan by Jivraj Tea Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:46 | GSC ended without comments | ||
4537 | DakRTih Hydropower Project, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/28 11:05 | GSC ended without comments | ||
6660 | 32 MW Baishui River Shiji Hydropower Station Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:41 | GSC ended without comments | ||
4591 | DGKCC Waste Heat Recovery and Utilization for 10.4 MW Power Generation at Dera Ghazi Khan Plant | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 12:59 | GSC ended without comments | ||
5559 | Inner Mongolia Hohhot Dayuanshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:29 | GSC ended without comments | ||
5849 | Ningxia Taiyangshan Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:31 | GSC ended without comments | ||
6044 | Datang Jiaonan Liuwang Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:30 | GSC ended without comments | ||
6047 | Datang Jiaonan Liuwang Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:30 | GSC ended without comments | ||
6034 | Datang Huayin Nanshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:31 | GSC ended without comments | ||
8926 | Shandong Laizhou Yidao Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:32 | GSC ended without comments | ||
4788 | Cachoeirao CDM Project (JUN1092) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/02 18:48 | GSC ended without comments | ||
10411 | Senegal Rural Electrification Program | PoA | Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10411-P1-0002-CP1 , 10411-P1-0003-CP1 , 10411-P1-0004-CP1 , 10411-P1-0005-CP1 , 10411-P1-0006-CP1 , 10411-P1-0007-CP1 | 2023/12/20 | GSC ended without comments | |
4440 | Inner Mongolia Tongliao Zhalute Qi Phase I North Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:51 | GSC ended without comments | ||
5098 | Metro Group Energy WWT Project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/30 18:34 | GSC ended without comments | ||
4648 | Huaneng Xinjiang Hami Santanghu Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:43 | GSC ended without comments | ||
2586 | Jilin Da’an Dagangzi Wind Power Project Phase II | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 06:42 | GSC ended without comments | ||
5827 | Animal manure anaerobic treatment facility – Ein Hahoresh | PA | Israel | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 07:40 | GSC ended without comments | ||
10615 | The Solar United Network South East Asia Pacific (SUNSEAP) Program | PoA | Viet Nam | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
2023/11/18 13:46 | GSC ended without comments | ||
3126 | Inner Mongolia Chifeng Daheishan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:35 | GSC ended without comments | ||
0765 | Catalytic N2O destruction project in the tail gas of three Nitric Acid Plants at Hu-Chems Fine Chemical Corp. | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:53 | GSC ended without comments | ||
10375 | EnKing International Renewable Energy POA | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10375-P1-0001-CP1 , 10375-P1-0002-CP1 , 10375-P1-0003-CP1 , 10375-P1-0004-CP1 , 10375-P1-0005-CP1 , 10375-P1-0006-CP1 , 10375-P1-0007-CP1 , 10375-P1-0008-CP1 , 10375-P1-0009-CP1 , 10375-P1-0010-CP1 , 10375-P1-0011-CP1 , 10375-P1-0012-CP1 , 10375-P1-0013-CP1 , 10375-P1-0014-CP1 , 10375-P1-0015-CP1 , 10375-P1-0016-CP1 , 10375-P1-0017-CP1 , 10375-P1-0018-CP1 , 10375-P1-0019-CP1 , 10375-P1-0020-CP1 , 10375-P1-0021-CP1 , 10375-P1-0022-CP1 , 10375-P1-0023-CP1 , 10375-P1-0024-CP1 , 10375-P1-0025-CP1 , 10375-P1-0026-CP1 , 10375-P1-0027-CP1 , 10375-P1-0028-CP1 , 10375-P1-0029-CP1 , 10375-P1-0030-CP1 , 10375-P1-0031-CP1 , 10375-P1-0032-CP1 | 2023/11/28 11:48 | GSC ended without comments | |
10073 | Wind Energy Project in Gujarat by Enn Enn Corp Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:52 | GSC ended without comments | ||
10189 | Waste Heat Recovery based power generation by Shree Cement Limited at Ras, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:52 | GSC ended without comments | ||
8347 | Wind Energy Project at Jaisalmer district, Rajasthan by Enn Enn Corp Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:52 | GSC ended without comments | ||
9906 | 2.1 MW Wind Project of Colourtex Industries Ltd. at Kutch district in Gujarat state, India. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:52 | GSC ended without comments | ||
9624 | Wind Power Project by Plasti Surge Industries Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:51 | GSC ended without comments | ||
6702 | Jangi 91.8 MW wind farm in Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:52 | GSC ended without comments | ||
7088 | SFPL Solar Power CDM Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:53 | GSC ended without comments | ||
5554 | Grid connected electricity generation using natural gas by Lanco Kondapalli Power Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:53 | GSC ended without comments | ||
6198 | Tunki Small Scale Hydropower Program of Activities | PoA | Peru | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
6198-P1-0002-CP1 , 6198-P1-0003-CP1 , 6198-P1-0004-CP1 , 6198-P2-0001-CP2 | 2023/12/18 16:28 | GSC ended without comments | |
7661 | CGN Gaizhou Shagangzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:30 | GSC ended without comments | ||
10352 | Tandavanala TsinjoHarena Improved cookstoves in Madagascar | PoA | Madagascar | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
10352-P1-0001-CP1 , 10352-P1-0002-CP1 , 10352-P1-0003-CP1 | 2023/12/28 20:17 | GSC ended without comments | |
8784 | Micro Scale Biogas CDM Project of CROSS | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/30 11:17 | GSC ended without comments | ||
0258 | Nueva Aldea Biomass Power Plant Phase 1 | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 16:46 | GSC ended without comments | ||
8285 | San Lorenzo Guimaras 54 MW Wind Power Project | PA | Philippines | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 04:30 | GSC ended without comments | ||
10391 | Wind Power Project by Wires & Fabriks (EKIESL-CDM.February-15-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:19 | GSC ended without comments | ||
6222 | Small-Scale Renewable Energy PoA in Thailand | PoA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6222-P1-0002-CP1 , 6222-P2-0002-CP2 | 2023/10/24 11:19 | GSC ended without comments | |
8194 | CGN Hami Phase I 20MWp Grid-connected PV Power Plant Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:53 | GSC ended without comments | ||
8245 | Hebei Shangyi CGN Dongshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:58 | GSC ended without comments | ||
5694 | Jilin Da'an Dagangzi Wind Power Project Phase V | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:52 | GSC ended without comments | ||
10660 | Methane capture project | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 08:57 | GSC ended without comments | ||
5774 | Laiyuan Huanghualiang Windpower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 09:16 | GSC ended without comments | ||
7658 | Baku Waste to Energy Project | PA | Azerbaijan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/05 13:30 | GSC ended without comments | ||
7912 | Jinsheng Huyang Line 1 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/01 03:59 | GSC ended without comments | ||
10368 | Grid-connected Solar PV project in Mérina Dakhar | PA | Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 11:39 | GSC ended without comments | ||
2098 | The 84 MW New Bong Escape Hydropower Project, Azad Jammu and Kashmir (AJK), Pakistan | PA | Pakistan | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/08/03 14:04 | GSC ended without comments | ||
4309 | Balsio Small Hydroelectric Project of Ginni Global Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/24 09:28 | GSC ended without comments | ||
4767 | WIND PROJECT ACTIVITY BY IDEAL DETONATORS PVT LIMITED | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:57 | GSC ended without comments | ||
7558 | Bundled Wind Project Activity by M/s Bhagyanagar India Limited and M/s Surana Telecom and Power Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:57 | GSC ended without comments | ||
10150 | Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:57 | GSC ended without comments | ||
10135 | Wind Power Project by M/s. Giriraj Enterprises at Jath & Shahuwadi, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:58 | GSC ended without comments | ||
10136 | Wind Power Project by M/s D. J. Malpani at Jath in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:57 | GSC ended without comments | ||
4820 | Wind Park at the Orites Archimandritas, Cyprus | PA | Cyprus | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 16:21 | GSC ended without comments | ||
1834 | Xacbal Hydroelectric project | PA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 00:20 | GSC ended without comments | ||
5311 | Inner Mongolia Shangdu Changshengliang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:31 | GSC ended without comments | ||
9402 | 3 MW Wind power project in Madhyapradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:49 | GSC ended without comments | ||
8186 | Bundled Wind Power Project- Parikh Gp (EKI CDM.Sept-10-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:47 | GSC ended without comments | ||
9697 | 5.10 MW Wind Power Project by Shyam Metalics & Energy Limited in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:47 | GSC ended without comments | ||
10393 | Renewable Power Project by Emami Power Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:49 | GSC ended without comments | ||
3238 | Wind power generation by Shree Naman Developers Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:47 | GSC ended without comments | ||
4026 | 30 MW wind power project at Surajbari, Gujarat in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:47 | GSC ended without comments | ||
7802 | Electricity generation from renewable sources – Windfarm Campo dos Ventos II | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2024/03/22 20:10 | GSC ended without comments | ||
8480 | Distribution of ONIL Stoves—Guatemala | PoA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
8480-P1-0003-CP1 | 2023/10/31 01:06 | GSC ended without comments | |
0370 | Ganpati co-generation project at Medak, Andhra Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 07:37 | GSC ended without comments | ||
3828 | Inner Mongolia Chifeng Toudaogou Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:42 | GSC ended without comments | ||
1872 | Hunan Chenxi Dafutan Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:43 | GSC ended without comments | ||
4165 | Huaneng Guangdong Nan'ao East Island Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:43 | GSC ended without comments | ||
8589 | 6.5 MW Bundled Small Hydro Electric Project in Maharashtra State, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 10:44 | GSC ended without comments | ||
0604 | Candelaria Hydroelectric Project | PA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 16:26 | GSC ended without comments | ||
3391 | Shandong Huaneng Shouguang 49.5MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:38 | GSC ended without comments | ||
4034 | Huaneng Eryuan Ma’anshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:42 | GSC ended without comments | ||
5180 | Huaneng Jilin Taobei Phase III Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:41 | GSC ended without comments | ||
5269 | Huaneng Shandong Shouguang Phase III Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:43 | GSC ended without comments | ||
5296 | Huaneng Shanxi Pianguan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:42 | GSC ended without comments | ||
2882 | Tao River Haidianxia 60MW Hydropower Project in Gansu Province, China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 15:33 | GSC ended without comments | ||
0191 | Monte Rosa Bagasse Cogeneration Project (MRBCP) | PA | Nicaragua | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/06/05 19:12 | GSC ended without comments | ||
0086 | Poechos I Project | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 18:34 | GSC ended without comments | ||
3688 | Inner Mongolia Zhuozi II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:51 | GSC ended without comments | ||
10253 | Solar Energy Project by EnvironmentFirst Energy Services, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 08:15 | GSC ended without comments | ||
4217 | Bujagali Hydropower Project | PA | Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 08:10 | GSC ended without comments | ||
7021 | Guajiru Wind Power Plant CDM Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/17 20:52 | GSC ended without comments | ||
6847 | Pao Cu Sang Hydropower Plant, Vietnam | PA | Viet Nam | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/10/28 11:52 | GSC ended without comments | ||
6790 | Bao Nhai Hydropower Project, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/28 11:56 | GSC ended without comments | ||
10066 | 20 MW BEL Wind Power Project in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/03 08:34 | GSC ended without comments | ||
10307 | Small Hydro Power Programme of Activities in Iran | PoA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10307-P1-0001-CP1 , 10307-P1-0002-CP1 , 10307-P1-0003-CP1 , 10307-P1-0004-CP1 | 2023/11/16 11:32 | GSC ended without comments | |
6553 | CGR Guatapara Landfill Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 01:49 | GSC ended without comments | ||
10517 | Programme for development of Biomass Industrial Thermal Heat Generation Supported by the Republic of Korea | PoA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10517-P1-0001-CP1 , 10517-P1-0005-CP1 , 10517-P1-0006-CP1 | 2023/12/04 01:29 | GSC ended without comments | |
5067 | Improved Cooking Stoves for Nigeria Programme of Activities | PoA | Nigeria | Continue to apply the currently applied CDM methodology at transition |
N/A
|
5067-P1-0001-CP1 , 5067-P1-0002-CP1 , 5067-P1-0003-CP1 , 5067-P1-0004-CP1 , 5067-P2-0006-CP1 | 2023/10/04 13:22 | GSC ended without comments | |
4276 | Guangxi Dahua Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:11 | GSC ended without comments | ||
5777 | AES Saurashtra Windfarms | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 12:40 | GSC ended without comments | ||
8261 | Welspun Renewable Energy Program | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 13:14 | GSC ended without comments | ||
9898 | Xenamnoy 1 Hydropower Project | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 07:51 | GSC ended without comments | ||
9622 | Queixada Small Hydroelectric Power Plant CDM Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 16:20 | GSC ended without comments | ||
8284 | Bundled Wind Project Activity in Tamil Nadu by MMP | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:39 | GSC ended without comments | ||
9638 | Congo (DRC) Improved Cook Stoves program | PoA | Democratic Republic of the Congo | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9638-P1-0001-CP1 , 9638-P1-0002-CP1 | 2024/03/26 08:27 | GSC ended without comments | |
5552 | Yunnan Langmushan Phase I Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 09:19 | GSC ended without comments | ||
10632 | Hasang Hydro Electric Power Plant | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 08:47 | GSC ended without comments | ||
3668 | Yunnan Gaohe River 3rd level Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 04:33 | GSC ended without comments | ||
10640 | Multi-country Renewable Energy Programme of Activities | PoA | Colombia,Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10640-P1-0001-CP1 , 10640-P1-0002-CP1 , 10640-P1-0003-CP1 , 10640-P1-0004-CP1 , 10640-P1-0005-CP1 , 10640-P1-0006-CP1 , 10640-P1-0007-CP1 , 10640-P1-0008-CP1 , 10640-P1-0009-CP1 , 10640-P1-0010-CP1 , 10640-P1-0011-CP1 , 10640-P1-0012-CP1 , 10640-P1-0013-CP1 , 10640-P1-0014-CP1 , 10640-P1-0015-CP1 , 10640-P1-0016-CP1 , 10640-P1-0017-CP1 , 10640-P1-0018-CP1 , 10640-P1-0019-CP1 , 10640-P1-0020-CP1 , 10640-P1-0021-CP1 , 10640-P1-0022-CP1 , 10640-P1-0023-CP1 , 10640-P1-0024-CP1 , 10640-P1-0025-CP1 , 10640-P1-0026-CP1 , 10640-P1-0027-CP1 , 10640-P1-0028-CP1 , 10640-P1-0029-CP1 , 10640-P1-0030-CP1 , 10640-P1-0031-CP1 , 10640-P1-0032-CP1 , 10640-P1-0033-CP1 , 10640-P1-0034-CP1 , 10640-P1-0035-CP1 | 2023/08/07 20:00 | GSC ended without comments | |
10642 | Multi-country Sustainable Waste Management Programme of Activities | PoA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/07 20:28 | GSC ended without comments | ||
5920 | Inner Mongolia Ximeng Huitengliang Area A Phase I Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 09:08 | GSC ended without comments | ||
6621 | Grid connected clean energy project in Jamnagar, Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 09:41 | GSC ended without comments | ||
3051 | Yan Tann Sien Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:40 | GSC ended without comments | ||
10663 | Grid-connected Solar PV project in Kael | PA | Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 17:52 | GSC ended without comments | ||
1103 | Manasi River Stage I Hydropower Project of Hongshanzui Hydropower Plant, Xinjiang Tianfu Thermoelectric Co., Ltd. | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/06/03 08:30 | GSC ended without comments | ||
7582 | CGN Gaozhou Gaopo Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:23 | GSC ended without comments | ||
2971 | Nam Gion Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:33 | GSC ended without comments | ||
9154 | Wind Power Project at Jath, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/21 10:39 | GSC ended without comments | ||
5335 | ROHIT SURFACTANTS PVT.LTD- 10.5 MW Wind Project, Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 06:27 | GSC ended without comments | ||
7845 | Waste heat recovery and utilization for power generation at DG Cement Khairpur Plant | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 13:03 | GSC ended without comments | ||
8192 | Partial substitution of coal with alternate fuels at DG Cement, Khofli Sattai Dera Ghazi Khan Plant | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 13:05 | GSC ended without comments | ||
10439 | Musalpetti Wind Power Project | PA | Sri Lanka | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/30 11:40 | GSC ended without comments | ||
6263 | Shuangyashan Yangmugang Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 03:47 | GSC ended without comments | ||
10471 | The Project of CCC program of Activities (PoA) for Distribution of Improved Cookstoves (ICS) in Developing South and Southeast Asia Countries (Myanmar) | PoA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10471-P1-0001-CP1 , 10471-P1-0002-CP1 , 10471-P1-0003-CP1 , 10471-P1-0004-CP1 , 10471-P1-0005-CP1 , 10471-P1-0006-CP1 , 10471-P1-0007-CP1 , 10471-P1-0008-CP1 , 10471-P1-0009-CP1 , 10471-P1-0010-CP1 , 10471-P1-0011-CP1 , 10471-P1-0012-CP1 , 10471-P1-0013-CP1 , 10471-P1-0014-CP1 , 10471-P1-0015-CP1 , 10471-P1-0016-CP1 , 10471-P1-0017-CP1 , 10471-P1-0018-CP1 , 10471-P1-0019-CP1 , 10471-P1-0020-CP1 , 10471-P1-0021-CP1 , 10471-P1-0022-CP1 , 10471-P1-0023-CP1 , 10471-P1-0024-CP1 , 10471-P1-0025-CP1 , 10471-P1-0026-CP1 , 10471-P1-0027-CP1 , 10471-P1-0028-CP1 , 10471-P1-0029-CP1 , 10471-P1-0030-CP1 , 10471-P1-0031-CP1 , 10471-P1-0032-CP1 , 10471-P1-0033-CP1 , 10471-P1-0034-CP1 , 10471-P1-0035-CP1 , 10471-P1-0036-CP1 , 10471-P1-0037-CP1 , 10471-P1-0038-CP1 , 10471-P1-0039-CP1 , 10471-P1-0040-CP1 , 10471-P1-0041-CP1 , 10471-P1-0042-CP1 , 10471-P1-0043-CP1 , 10471-P1-0044-CP1 , 10471-P1-0045-CP1 , 10471-P1-0046-CP1 , 10471-P1-0047-CP1 , 10471-P1-0048-CP1 , 10471-P1-0049-CP1 , 10471-P1-0050-CP1 , 10471-P1-0051-CP1 , 10471-P1-0052-CP1 , 10471-P1-0053-CP1 , 10471-P1-0054-CP1 | 2023/07/03 12:06 | GSC ended without comments | |
8671 | 15 MW Solar Photovoltaic Power Project at Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:51 | GSC ended without comments | ||
10651 | Mandalay Thaung Inn Myauk Inn Landfill Methane Recovery Project | PA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 08:16 | GSC ended without comments | ||
3232 | Biomass based power project in Punjab, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 10:16 | GSC ended without comments | ||
10641 | The African Cookstoves Initiative Programme of Activities | PoA | Côte d`Ivoire,Senegal,Kenya,Guinea-Bissau,Guinea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10641-P1-0001-CP1 | 2023/08/07 20:34 | GSC ended without comments | |
10711 | El Roble Solar Power Project, Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 01:54 | GSC ended without comments | ||
2886 | Inner Mongolia Tongliao Huolinhe Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 06:33 | GSC ended without comments | ||
5985 | Gansu Jingtai Qianfeng Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 02:37 | GSC ended without comments | ||
1496 | Pihe 9.6MW Small Hydropower Project in Yunnan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:31 | GSC ended without comments | ||
3033 | 24 MW Kut Hydro Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 10:39 | GSC ended without comments | ||
3442 | Nam Chien 2 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 10:07 | GSC ended without comments | ||
9083 | Tadas wind farm in Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:19 | GSC ended without comments | ||
10610 | The Uganda Improved Cookstove and Water Purifier Project by the Korea East-West Power Company | PoA | Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 06:49 | GSC ended without comments | ||
6048 | Rukti-II (5 MW) Small Hydro Electric Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/21 11:10 | GSC ended without comments | ||
10009 | Energy Efficiency Measures at MindSpace Building No 9 at Hyderabad | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/30 09:56 | GSC ended without comments | ||
10569 | Farahantsana hydropower plant | PA | Madagascar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/08 11:45 | GSC ended without comments | ||
6281 | 2.4 MW Wind Power Project in Rajasthan State | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:56 | GSC ended without comments | ||
7284 | Maoming Dianbai Lingmen Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:44 | GSC ended without comments | ||
4550 | Dak Pone Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 10:13 | GSC ended without comments | ||
4714 | Doc Cay Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:53 | GSC ended without comments | ||
1535 | Changwa 10 MW Small-scale Hydro Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/31 15:40 | GSC ended without comments | ||
1527 | Hongyan 8 MW Small-scale Hydro Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/31 15:42 | GSC ended without comments | ||
8012 | Grid connected electricity generation from renewable source: Windfarm Complex Santa Vitória do Palmar and Chuí | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/29 20:59 | GSC ended without comments | ||
7334 | CGN Boshan Yueyangshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:09 | GSC ended without comments | ||
4450 | Grid connected renewable energy project in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 07:22 | GSC ended without comments | ||
7413 | CGN Zhaoyuan Zhangxing Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:12 | GSC ended without comments | ||
7507 | Qinghai Maqin Gequ Level 2 Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 06:55 | GSC ended without comments | ||
4531 | Improving Rural Livelihoods Through Carbon Sequestration By Adopting Environment Friendly Technology based Agroforestry Practices | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/15 13:14 | GSC ended without comments | ||
8651 | Shanxi Huaneng Yuanping Duanjiapu Wind Farm Phase II 49.5 MW Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:39 | GSC ended without comments | ||
9877 | Jiangxi Datang International Anyuan Jiulongshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 09:26 | GSC ended without comments | ||
9941 | Programme of Activities for Local Improved Cookstoves in West Africa | PoA | Mali,Benin | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
9941-P1-0001-CP1 , 9941-P2-0001-CP2 | 2023/12/31 04:00 | GSC ended without comments | |
6401 | Biomass based Co-generation plant at Birlagram, Nagda, Madhya Pradesh, India. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 10:37 | GSC ended without comments | ||
8431 | Chiripa Wind Project | PA | Costa Rica | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/12 13:15 | GSC ended without comments | ||
3464 | Exploitation of the biogas from Controlled Landfill in Solid Waste Management Central – CTRS / BR.040 | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 20:19 | GSC ended without comments | ||
10289 | UAE Small Scale Solar Programme of Activities | PoA | United Arab Emirates | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 11:18 | GSC ended without comments | ||
5173 | Yichun Xinqing Laobaishan Windpark First Stage 30MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:21 | GSC ended without comments | ||
10712 | Diego de Almagro Solar Power Project, Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 01:56 | GSC ended without comments | ||
0081 | LOS ALGARROBOS HYDROELECTRIC PROJECT (PANAMA) | PA | Panama | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/27 17:03 | GSC ended without comments | ||
6726 | Sichuan Shuoquhe Quxue Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 04:56 | GSC ended without comments | ||
1165 | PROBIOGAS-JP – Joăo Pessoa Landfill Gas Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 02:07 | GSC ended without comments | ||
4127 | Reforestation of grazing Lands in Santo Domingo, Argentina | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/22 16:35 | GSC ended without comments | ||
5848 | Liaoning Faku 2nd Phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 04:09 | GSC ended without comments | ||
7643 | Yanyuan County Baji River Phase III Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/30 14:44 | GSC ended without comments | ||
10490 | SHP Salto Santo Antonio CDM Project (JUN1205), Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 13:14 | GSC ended without comments | ||
1628 | Inner Mongolia Dali Phase IV 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 07:18 | GSC ended without comments | ||
8882 | Shaanxi Shifeng Cement Waste Heat Recovery Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 09:56 | GSC ended without comments | ||
10053 | Empowering DRC communities through the use of Improved Cook Stoves | PoA | Democratic Republic of the Congo,Mozambique,Nigeria,Kenya,Zambia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 10:18 | GSC ended without comments | ||
6758 | Huaneng Tongliao Nugusitai Jingguan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 03:45 | GSC ended without comments | ||
9856 | 130 MW Aras (Gara Chilar) Hydropower Plant | PA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 02:38 | GSC ended without comments | ||
4330 | Dongbaishan 15MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 17:36 | GSC ended without comments | ||
5773 | Project Ulubelu Unit 3 – 4 PT. Pertamina Geothermal Energy | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 09:34 | GSC ended without comments | ||
4867 | Chantaburi Starch Wastewater Treatment and Biogas Utilization Project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 11:51 | GSC ended without comments | ||
4513 | Lake Turkana 310 MW Wind Power Project | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/20 10:34 | GSC ended without comments | ||
10349 | Improved cookstove programme for climate & community impact in Uganda & Malawi by SDG 13 Ventures | PoA | Malawi,Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/02 11:13 | GSC ended without comments | ||
1279 | Fundăo-Santa Clara Energetic Complex Project (FSCECP) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 13:45 | GSC ended without comments | ||
8811 | CTGNE Shanshan Phase I 20 MWp Solar PV Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 15:22 | GSC ended without comments | ||
9230 | 98.7 MW wind power project at Ratlam in Madhya Pradesh by DJ Energy Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 12:02 | GSC ended without comments | ||
5863 | Wind Energy Project in Dewas, Madhya Pradesh (India) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/09 11:02 | GSC ended without comments | ||
8551 | Wind power project in Maharashtra by TVS Energy Limited | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 08:03 | GSC ended without comments | ||
7260 | DEWA Chiller Station L | PA | United Arab Emirates | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 08:12 | GSC ended without comments | ||
8455 | Datang Dabancheng Chaiwobao Wind Power 49.5MW Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:35 | GSC ended without comments | ||
5393 | Catalytic N2O destruction project at the new nitric acid plant PANNA 4 of Enaex S.A. | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 15:17 | GSC ended without comments | ||
3346 | Jilin Xiangyang 1st phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 08:34 | GSC ended without comments | ||
6010 | Inner Mongolia Ximeng Huitengliang Area B Phase III Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 09:02 | GSC ended without comments | ||
6400 | Tashiding Hydroelectric Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:54 | GSC ended without comments | ||
2227 | Inner Mongolia Xinghe Hangtian Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 07:26 | GSC ended without comments | ||
5573 | Nam Pong Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:28 | GSC ended without comments | ||
4984 | Fujian Changle Wushan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 09:26 | GSC ended without comments | ||
9095 | Large scale wind farm project "Melowind" | PA | Uruguay | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/27 14:05 | GSC ended without comments | ||
9433 | Bundled Wind Project in TKM | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 14:09 | GSC ended without comments | ||
3813 | Wind Power Project in Porbandar district, Gujarat, India by M/s Venkatalaxmi Renewable Enegy Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 14:06 | GSC ended without comments | ||
7536 | Neusberg Grid Connected Hydroelectric Power Plant, South Africa | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/05 10:33 | GSC ended without comments | ||
9290 | ITVR Sao Leopoldo landfill gas project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 15:30 | GSC ended without comments | ||
10225 | Punta Negra Hydroelectric Project | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 17:34 | GSC ended without comments | ||
10677 | GHG Programme-Agriculture Group3 | PoA | Mozambique | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/26 14:37 | GSC ended without comments | ||
5446 | CGN Dalian Xizhongdao Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:45 | GSC ended without comments | ||
1627 | Shibeishan Wind Power Generation Project in Huilai County, Guangdong Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 03:40 | GSC ended without comments | ||
9977 | West African Biodigester Programme of Activities | PoA | Benin,Burkina Faso | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
9977-P1-0001-CP1 , 9977-P2-0001-CP2 | 2023/12/31 08:37 | GSC ended without comments | |
4932 | Huaneng Tongyu Xinhua 1C Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:28 | GSC ended without comments | ||
0994 | Inner Mongolia Chifeng Saihanba West 30.6 MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 09:52 | GSC ended without comments | ||
7973 | CGN Jinta Hongliuwa 9MW Grid-connected PV Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:45 | GSC ended without comments | ||
0164 | Bandeirantes Landfill Gas to Energy Project (BLFGE) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 14:18 | GSC ended without comments | ||
6041 | Complexo Carreiro II CDM Project. | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/13 10:49 | GSC ended without comments | ||
5461 | Fatima N2O Abatement Project | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/11 16:46 | GSC ended without comments | ||
10208 | Energy Efficiency measures at Commerzone Industrial Park, Pune | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 06:05 | GSC ended without comments | ||
10169 | Energy efficiency measures at Mindspace Airoli, building nos: 1, 2, 4 and 5&6 of Serene Properties Pvt.Ltd.at Navi Mumbai | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 06:05 | GSC ended without comments | ||
5831 | Providencia Hydroelectric Plant | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 18:21 | GSC ended without comments | ||
8100 | Dam spillage based small hydro power project in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/11 13:22 | GSC ended without comments | ||
3895 | Power generation from renewable sources – Arvoredo and Varginha Small Hydropower Plants | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/07 16:20 | GSC ended without comments | ||
0792 | "14.65 MW Wind Power Project" in Maharashtra by BF Utilities Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 10:37 | GSC ended without comments | ||
6678 | Inner Mongolia Wuliji Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 06:54 | GSC ended without comments | ||
10321 | Solar Power Project by Rishabh Renergy (EKIESL-CDM.May-15-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:26 | GSC ended without comments | ||
10666 | GHG Programme-Agriculture Group2 | PoA | Mozambique | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/26 14:42 | GSC ended without comments | ||
1506 | Proactiva Tijuquinhas Landfill Gas Capture and Flaring project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/15 17:13 | GSC ended without comments | ||
6740 | Datang Kezuohouqi Hariwusu 49.5MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 08:23 | GSC ended without comments | ||
8765 | Huaneng Gansu Jinchang 20MWp Gridconnected Solar PV Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 14:10 | GSC ended without comments | ||
6084 | Datang Ningxia Ningdong (Baitugang Town Leshuigou) Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 08:02 | GSC ended without comments | ||
9719 | Renewable Energy Project Bundled by Livia Polymer Bottles Pvt. Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 08:18 | GSC ended without comments | ||
4359 | Mare Chicose Landfill Gas Project | PA | Mauritius | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 15:56 | GSC ended without comments | ||
10288 | Solar Power Project by Fortum FinnSurya (EKIESL-CDM.February-15-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 10:31 | GSC ended without comments | ||
3898 | Guanhăes Energia CDM Project, Minas Gerais, Brazil (JUN1123) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/02 18:44 | GSC ended without comments | ||
10030 | Household energy appliance programme | PoA | Myanmar,Timor-Leste,Cambodia,Lao People's Democratic Republic,Kenya,Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10030-P1-0003-CP1 , 10030-P1-0004-CP1 | 2023/12/06 02:53 | GSC ended without comments | |
2325 | PANITAO Biomass Thermal Energy Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:21 | GSC ended without comments | ||
4724 | Sichuan Lingguan 76MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 01:32 | GSC ended without comments | ||
6394 | Huaneng Yi County Laolongkou Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:52 | GSC ended without comments | ||
6319 | Huaneng Fuxi Zhalanshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:54 | GSC ended without comments | ||
7375 | El Retamo Landfill Gas Utilization Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 14:18 | GSC ended without comments | ||
6606 | KTDA Small Hydro Programme of Activities | PoA | Kenya | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
6606-P2-0001-CP2 , 6606-P2-0002-CP1 , 6606-P2-0003-CP1 | 2023/12/06 06:28 | GSC ended without comments | |
1079 | Gansu Diebu Duoer 32MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:11 | GSC ended without comments | ||
5583 | Xekaman 3 Hydropower Project, Lao PDR | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/21 15:33 | GSC ended without comments | ||
10722 | Clean bricks production in Nepal | PoA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 09:41 | GSC ended without comments | ||
7497 | Xinjiang A’letai Hua’ning Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 06:53 | GSC ended without comments | ||
7132 | Shanxi Pinglu Baiyushan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 08:52 | GSC ended without comments | ||
0752 | Omnia Fertilizer Limited Nitrous Oxide (N2O) Reduction Project | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 15:17 | GSC ended without comments | ||
9928 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.April-13-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:09 | GSC ended without comments | ||
7369 | Wind Power Project in Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 09:29 | GSC ended without comments | ||
10163 | 37.5 MW Wind power project at Pratapgarh, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 10:56 | GSC ended without comments | ||
2121 | China Hunan Yuzitang Small Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:09 | GSC ended without comments | ||
8066 | Qingdao MSW Incineration Power Generation Project | PA | China | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/28 10:38 | GSC ended without comments | ||
7036 | Solar PV power project at Patan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 07:53 | GSC ended without comments | ||
9772 | Biogas based power generation project in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 15:50 | GSC ended without comments | ||
4278 | Ganhekou V 201MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/16 14:37 | GSC ended without comments | ||
9063 | MACAÚBAS LANDFILL GAS PROJECT | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 23:41 | GSC ended without comments | ||
8879 | SHP MORRO AZUL CDM PROJECT (JUN1164) | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 18:37 | GSC ended without comments | ||
2580 | Yunnan Yunpeng Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 14:56 | GSC ended without comments | ||
6714 | Runatullo III Hydroelectric Power Plant | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 12:02 | GSC ended without comments | ||
4126 | Huaneng Tongliao Kezuozhongqi Xibaiyin Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:49 | GSC ended without comments | ||
4294 | Gwangju metropolitan city sanitary landfill LFG power plant CDM project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/18 06:50 | GSC ended without comments | ||
7359 | PoA for the Reduction of emission from non-renewable fuel from cooking at household level | PoA | Madagascar,Ethiopia,Kenya,Malawi,Mozambique,Nigeria,Uganda,Zambia,Chad,Dominican Republic,Côte d`Ivoire,Liberia,Rwanda,Sierra Leone,Namibia,Zimbabwe,Ghana,South Africa,Somalia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
7359-P1-0027-CP1 , 7359-P1-0034-CP1 , 7359-P1-0042-CP1 , 7359-P1-0047-CP1 , 7359-P1-0049-CP1 , 7359-P1-0052-CP1 , 7359-P1-0060-CP1 , 7359-P1-0063-CP1 , 7359-P1-0064-CP1 , 7359-P1-0065-CP1 , 7359-P1-0066-CP1 | 2023/12/10 12:10 | GSC ended without comments | |
3667 | La Hieng 2 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/31 | GSC ended without comments | ||
9392 | 5 MW Solar PV Power Project at NTPC-Dadri, a Business unit of NTPC limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/17 11:04 | GSC ended without comments | ||
7650 | West Huaybong 2 wind farm project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/24 15:06 | GSC ended without comments | ||
1886 | Gansu Zhouqu County Hujia’ai Hydropower Station Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 12:52 | GSC ended without comments | ||
3867 | Huaneng Fuxin Phase III Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:45 | GSC ended without comments | ||
4803 | Guangxi Nabi Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/17 02:30 | GSC ended without comments | ||
1253 | Baragran Hydro Electric Project, 3.0 MW (being expanded to 4.9 MW) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:00 | GSC ended without comments | ||
2467 | Landfill Gas Recovery and Utilization at Bukit Tagar Sanitary Landfill, Hulu Selangor in Malaysia | PA | Malaysia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/14 11:33 | GSC ended without comments | ||
8288 | IOT Mabagas Limited power plant, Pudhuchatram | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/14 08:46 | GSC ended without comments | ||
1577 | CGN Inner Mongolia Zhurihe Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:44 | GSC ended without comments | ||
7895 | 52.50 MW Wind energy farm at Mokla Rajasthan by HZL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:28 | GSC ended without comments | ||
8767 | Cerro Pabellon Geothermal Project (Apacheta) | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/21 16:02 | GSC ended without comments | ||
7458 | Valle de los Vientos Wind Farm | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/21 16:05 | GSC ended without comments | ||
4800 | San Clemente Hydroelectric Power Plant | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/11 18:56 | GSC ended without comments | ||
5293 | Hebei Shangyi Dongshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:39 | GSC ended without comments | ||
2551 | Xinjiang Kaiduhe River Chahan Wusu Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 06:22 | GSC ended without comments | ||
3804 | Shaanxi Hanjiang Shuhe Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 10:03 | GSC ended without comments | ||
1775 | Yunnan Weixi Gedeng Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 07:34 | GSC ended without comments | ||
6877 | Piedra Larga Phase II Wind Farm | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 16:55 | GSC ended without comments | ||
6413 | Datang Delingha Renewable Power Co., Ltd. Delingha 10MW Grid-connected Photovoltaic Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:43 | GSC ended without comments | ||
10013 | Bundled Wind Project-II of Shivashri in Sadawaghapur Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:54 | GSC ended without comments | ||
9531 | Grid Connected Solar Power Project in Bikaner | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 08:35 | GSC ended without comments | ||
9861 | Semangka Hydro Electric Power Project | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 11:12 | GSC ended without comments | ||
7622 | Wind Power Project activity by ACCPL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 08:24 | GSC ended without comments | ||
0139 | Biogas Support Program - Nepal (BSP-Nepal) Activity-2 | PA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/05 08:32 | GSC ended without comments | ||
6991 | Ningxia Tongxin (Magaozhuang Lixian Yazi) Datang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 09:02 | GSC ended without comments | ||
7841 | Bokpoort CSP (Concentrating Solar Power) Project, South Africa | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:49 | GSC ended without comments | ||
7245 | Methane Capture and Utilization Project at Asia Palm Oil Mill, Malaysia | PA | Malaysia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 09:24 | GSC ended without comments | ||
10510 | Reforestation of Grazing Lands Hacienda El Manantial in Puerto Lopez, Colombia | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 15:13 | GSC ended without comments | ||
1438 | Hubei Hefeng Yanzi Town Baishun Village Taohuashan Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 03:51 | GSC ended without comments | ||
6788 | Huaneng Yunnan Eryuan Dalongtan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 14:06 | GSC ended without comments | ||
8181 | Balakhani Landfill Project | PA | Azerbaijan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/05 13:37 | GSC ended without comments | ||
2954 | Guangdong Taishan Shangchuandao Island Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 09:07 | GSC ended without comments | ||
9857 | Jiangxi Datang International Jishan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 09:32 | GSC ended without comments | ||
8730 | Reforestation of Abandoned Dairy Cattle Grazing Grasslands in Korea | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/30 05:18 | GSC ended without comments | ||
10611 | Expansion San Pedro Wind Farm | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/07 19:53 | GSC ended without comments | ||
8932 | San Pedro Wind Farm Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/07 19:56 | GSC ended without comments | ||
8179 | Huaneng Yunlong County Caojian Liangzi Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 06:34 | GSC ended without comments | ||
5895 | Zhangbei Wudengshan Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 03:57 | GSC ended without comments | ||
10178 | Small Hydro Power Project at NTPC-Singrauli | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/17 11:16 | GSC ended without comments | ||
4634 | Piedra Larga Wind Farm | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 16:01 | GSC ended without comments | ||
4017 | Gansu Miaojiaba Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 04:26 | GSC ended without comments | ||
4713 | Hunan Zhugaotan Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 04:30 | GSC ended without comments | ||
2215 | Henan Sanmenxia 25.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 03:10 | GSC ended without comments | ||
2151 | Yunnan Leidatan 108MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:51 | GSC ended without comments | ||
9925 | SHPs Tambaú, das Pedras and Rio do Sapo CDM Project (JUN1132), Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/02 19:00 | GSC ended without comments | ||
2470 | Upgradation, Operation and Maintenance of 200 TPD Composting facility at Okhla, Delhi | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/13 07:42 | GSC ended without comments | ||
6416 | Huaneng Wuchuan Houwantu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:11 | GSC ended without comments | ||
10709 | El Laurel Solar Power Project, Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 01:51 | GSC ended without comments | ||
8053 | Sichuan Golden-Elephant Sincerity Line 4 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/01 04:32 | GSC ended without comments | ||
6449 | Datang New Energy Wangtuan Phase One Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 04:11 | GSC ended without comments | ||
1857 | Hunan Yuanshui Qingshuitang Hydropower Station | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 08:55 | GSC ended without comments | ||
4204 | Huaneng Weichang Yudaokou Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:39 | GSC ended without comments | ||
10497 | Improved Cook Stove Programme in Fiji | PoA | Fiji | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10497-P1-0001-CP1 , 10497-P1-0002-CP1 , 10497-P1-0003-CP1 | 2023/07/02 22:07 | GSC ended without comments | |
4074 | Huaneng Keyouzhongqi Baiyinnula Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:18 | GSC ended without comments | ||
10415 | Clean Energy Program Supported by Republic of Korea | PoA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10415-P1-0001-CP1 , 10415-P1-0002-CP1 , 10415-P1-0003-CP1 | 2023/10/27 02:00 | GSC ended without comments | |
6457 | Datang Jilin Datong 49.5 MW Windfarm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 14:59 | GSC ended without comments | ||
2638 | VN08-WWS-03, Methane Recovery and Biogas Utilization Project, Yen Bai Province, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/25 12:18 | GSC ended without comments | ||
2639 | VN08-WWS-04, Methane Recovery and Biogas Utilization Project, Lao Cai Province, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/25 12:18 | GSC ended without comments | ||
2640 | VN08-WWS-05, Methane Recovery and Biogas Utilization Project, Quang Tri Province, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/25 12:18 | GSC ended without comments | ||
9460 | 20 MW LNJP Wind Project Power Project, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 11:15 | GSC ended without comments | ||
3742 | Bundled Wind Power Project by M/s. D. J. Malpani | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 11:01 | GSC ended without comments | ||
5794 | Grid Connected Wind Power Project by M/s. D. J. Malpani in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:59 | GSC ended without comments | ||
6437 | Grid Connected Wind Power Project by M/s. D. J. Malpani at Ratan Ka Bas (RKB), Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 11:02 | GSC ended without comments | ||
5938 | Grid Connected Wind Power Project by M/s Giriraj Enterprises in Madhya Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 11:01 | GSC ended without comments | ||
3700 | 13.75 MW wind power project in Davangere, Karnataka, India. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 11:00 | GSC ended without comments | ||
3724 | Wind Power Project by Sargam Retails Pvt. Ltd. in Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:58 | GSC ended without comments | ||
5845 | Grid Connected Wind Power Project by M/s. Giriraj Enterprises at Tejuva, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:59 | GSC ended without comments | ||
5212 | Plaine Des Roches Wind Farm | PA | Mauritius | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/30 14:18 | GSC ended without comments | ||
9064 | Cristal, Primavera and Săo Judas Wind Farms | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 15:24 | GSC ended without comments | ||
4700 | Vaayu India Wind Power Project in Gujarat. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 10:05 | GSC ended without comments | ||
6985 | El Arrayán Wind Farm Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/27 19:29 | GSC ended without comments | ||
2223 | Liaoning Faku 1st phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 04:16 | GSC ended without comments | ||
8474 | Maracană Small Hydropower Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/20 20:47 | GSC ended without comments | ||
1833 | Inner Mongolia Duolun Daxishan 30.6MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 08:16 | GSC ended without comments | ||
7628 | Ningxia Tongxin (Zhangjiayuan Sutai) Huifeng Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:22 | GSC ended without comments | ||
7644 | Ningxia Tongxin (Zhangjiayuan Haitanghu) Huifeng Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:23 | GSC ended without comments | ||
9621 | Wind Power Project by Surana Corporation Limited at Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 08:32 | GSC ended without comments | ||
9863 | The MRTS PoA | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9863-P1-0001-CP1 , 9863-P1-0002-CP1 , 9863-P1-0003-CP1 , 9863-P1-0004-CP1 | 2023/11/15 07:10 | GSC ended without comments | |
4871 | Huaneng Shandong Hekou Phase IV Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:33 | GSC ended without comments | ||
6560 | Patrind Hydropower Project | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/06 06:19 | GSC ended without comments | ||
4193 | Hebei Fengning Dahexi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 08:24 | GSC ended without comments | ||
8257 | Hebei Fengning Wanshengyong Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:19 | GSC ended without comments | ||
4985 | Sarbari II Hydro Power Project by DSL Hydrowatt Limited in Kullu, Himachal Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/04 10:30 | GSC ended without comments | ||
5016 | Reforestation of degraded land by MTPL in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/04 10:30 | GSC ended without comments | ||
4828 | Natural Gas based grid connected power project at Peddapuram, A.P. by Gautami Power Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/04 10:30 | GSC ended without comments | ||
9303 | Zone 3 Landfill Gas Project | PA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 21:49 | GSC ended without comments | ||
4926 | Huaneng Shanghai Chongming Qianwei Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:32 | GSC ended without comments | ||
1824 | Wind power project by HZL in Karnataka. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:24 | GSC ended without comments | ||
9871 | Grid Connected Solar PV Project by M/s. D. J. Malpani in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:03 | GSC ended without comments | ||
10165 | Wind Power Project by M/s. D. J. Malpani in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:03 | GSC ended without comments | ||
10017 | Grid Connected Solar PV Project by M/s. Giriraj Enterprises in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:03 | GSC ended without comments | ||
4693 | 2.10 MW Wind Power Project by M/s Chhotabhai Jethabhai Patel & Co. (CJP) at Belwa Ranaji Village, Shergarh Taluka, Jodhpur District, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:03 | GSC ended without comments | ||
9185 | Grid connected solar photovoltaic power plant in Bikaner, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:04 | GSC ended without comments | ||
5161 | Badyar Hydro (4.90 MW) Plant at Uttarakhand | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:04 | GSC ended without comments | ||
7529 | Grid connected wind power project in Maharashtra, India by Bhilwara | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:04 | GSC ended without comments | ||
7377 | Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.July-11-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:50 | GSC ended without comments | ||
8833 | Bundled Wind Power Project- EnKing International (CDM.March-11-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:51 | GSC ended without comments | ||
9347 | Wind Power Project by Tirupati Microtech Pvt. Ltd. (EKI-CDM.June-11-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:51 | GSC ended without comments | ||
10636 | Wind Power Project by Mangalam Fashions Limited & Group in Andhra Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:50 | GSC ended without comments | ||
10626 | Solar and Wind Project by Agrawal Renewable Energy Pvt. Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:51 | GSC ended without comments | ||
2805 | Guangdong Zhanjiang Yangqian 49.5MW Wind Power Project | PA | China | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/22 02:20 | GSC ended without comments | ||
8751 | Proactiva CGA Iperó Landfill Gas to Energy Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/15 16:42 | GSC ended without comments | ||
10382 | Wind Power Project by Markdata Green Energy (EKIESL-CDM.January-15-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 11:41 | GSC ended without comments | ||
10602 | Renewable Energy Power project by DDWL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 11:44 | GSC ended without comments | ||
5700 | Wind based power project in Maharashtra by Siddhayu Ayurvedic Research Foundation Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 11:45 | GSC ended without comments | ||
4575 | 6.0 MW wind energy project in Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 08:41 | GSC ended without comments | ||
6172 | Shanxi Lingqiu Baicaowan 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 09:50 | GSC ended without comments | ||
6522 | Clean energy generation from wind energy in the state of Rajasthan. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 14:40 | GSC ended without comments | ||
8682 | Huaneng Dingbian Langergou Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:33 | GSC ended without comments | ||
7453 | Huaneng Dongying Hekou Phase VI Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:20 | GSC ended without comments | ||
5723 | 10 MW Biomass based Power Plant by Sanjog Sugars & Eco-Power Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 08:18 | GSC ended without comments | ||
6103 | Tra Xom Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 10:14 | GSC ended without comments | ||
2038 | Fuhui Inner Mongolia Tugurige Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 09:40 | GSC ended without comments | ||
6528 | Gansu Guazhou Qiaowan Second Phase Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:23 | GSC ended without comments | ||
7250 | Bac Lieu Province Wind Power Plant | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 09:27 | GSC ended without comments | ||
4956 | Renewable Energy Wind Power Project in Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 14:18 | GSC ended without comments | ||
6022 | Xinjiang Dabancheng Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:29 | GSC ended without comments | ||
7874 | Datang Chuzhou Lai’an Longshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:06 | GSC ended without comments | ||
7913 | Jinsheng Huyang Line 2 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/01 04:00 | GSC ended without comments | ||
8028 | Shanxi Linfen Dyestuff Efficiency Improvement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 10:00 | GSC ended without comments | ||
10535 | Cam Lam VN Solar Power Plant | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/31 09:08 | GSC ended without comments | ||
10265 | GHG Emissions Reduction through Modjo Common Effluent Treatment Plant | PA | Ethiopia | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/22 09:11 | GSC ended without comments | ||
5416 | Biogas Support Program - Nepal Activity-4 | PA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/05 08:34 | GSC ended without comments | ||
2032 | Heilongjiang Dajiazishan 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 08:43 | GSC ended without comments | ||
7093 | Los Cocos Wind Farm Project | PA | Dominican Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 22:05 | GSC ended without comments | ||
6810 | Vietnam Renewable Energy Development Program (REDP) | PoA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6810-P1-0002-CP1 , 6810-P1-0005-CP1 , 6810-P1-0006-CP1 , 6810-P1-0007-CP1 , 6810-P1-0008-CP1 , 6810-P1-0011-CP1 , 6810-P1-0012-CP1 | 2024/04/01 05:10 | GSC ended without comments | |
9947 | Fengning Luotuogou Wind Power Project Phase II | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/13 04:26 | GSC ended without comments | ||
3773 | Olkaria II Geothermal Expansion Project | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 12:50 | GSC ended without comments | ||
5769 | Laiyuan Dongtuanbao Windpower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/21 09:12 | GSC ended without comments | ||
4341 | Inner Mongolia Chifeng Yikesong Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:16 | GSC ended without comments | ||
9007 | Distribution of Improved Cook Stoves in Sub-Saharan Africa | PoA | Senegal,Ghana,Nigeria,Malawi,Zambia,Zimbabwe | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9007-P1-0002-CP1 , 9007-P1-0004-CP1 , 9007-P1-0005-CP1 , 9007-P1-0006-CP1 , 9007-P1-0007-CP1 , 9007-P1-0008-CP1 | 2023/10/31 01:00 | GSC ended without comments | |
1943 | Sichuan Greenleaf (Lvye) 60MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 07:02 | GSC ended without comments | ||
10512 | IDCOL Improved Cook Stove Program | PoA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10512-P1-0001-CP1 | 2023/12/14 09:56 | GSC ended without comments | |
5808 | Datang Keyouzhongqi Naimanpu and Haoyao Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 09:51 | GSC ended without comments | ||
5064 | Hebei Xiqiaoliang Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 09:59 | GSC ended without comments | ||
10183 | Small Hydro Power Project in Panwi, Himachal Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:05 | GSC ended without comments | ||
4052 | Horcones biomass power plant expansion project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 12:59 | GSC ended without comments | ||
5144 | Song Bung 5 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 03:37 | GSC ended without comments | ||
6723 | Runatullo II Hydroelectric Power Plant | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 11:58 | GSC ended without comments | ||
9847 | Renewable Energy CDM Programme of Rwanda (RECPR) | PoA | Rwanda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 16:03 | GSC ended without comments | ||
8103 | 9 MW Wind Energy Farm at Jodhpur Rajasthan by HZL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:37 | GSC ended without comments | ||
9913 | Bundled Wind Power Project- EnKing International (CDM.Dec-10-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:58 | GSC ended without comments | ||
10369 | Bundled Renewable Power Project by EKI Energy Services Limited (EKIESL-CDM.February-15-04) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:58 | GSC ended without comments | ||
10344 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.April-13-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:57 | GSC ended without comments | ||
10370 | Renewable Power Project by the Kiran Group (EKIESL- CDM. September 15-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:57 | GSC ended without comments | ||
1921 | Durban Landfill-Gas Bisasar Road | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 14:38 | GSC ended without comments | ||
1815 | Inner Mongolia Huitengliang Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 03:14 | GSC ended without comments | ||
10198 | Grid Connected Bundled Wind Power Project in Karnataka and Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:54 | GSC ended without comments | ||
7433 | 14.70 MW Wind Power Project at Jath, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:56 | GSC ended without comments | ||
7215 | Bundled 9.00 MW wind power Generation project in Rajasthan, India by M/s. Gangadhar Narsingdas Agrawal Group | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 10:55 | GSC ended without comments | ||
10242 | Bundled Solar Energy Project in Madhya Pradesh by EnvironmentFirst, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 08:10 | GSC ended without comments | ||
9794 | CDM Project CAAL | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/31 10:08 | GSC ended without comments | ||
4935 | Zhangbei Caoniangou 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/03 14:47 | GSC ended without comments | ||
5011 | Shanxi Lingqiu Hanfengling 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/03 14:48 | GSC ended without comments | ||
0116 | N2O Emission Reduction in Paulínia, SP, Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 11:29 | GSC ended without comments | ||
7234 | Xitieshan Phase III 60MWp Grid-connected Solar PV Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:56 | GSC ended without comments | ||
6009 | Liaoning Fuxin Qianzhatai Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 03:53 | GSC ended without comments | ||
7395 | Dak Mi 3 Hydropower Project, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/28 12:00 | GSC ended without comments | ||
4866 | Zhangbei Daxishan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 08:11 | GSC ended without comments | ||
9902 | Promotion of the Improved Cooking Stove (ICS) – Nepal | PoA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9902-P1-0001-CP1 , 9902-P1-0002-CP1 , 9902-P1-0003-CP1 , 9902-P1-0004-CP1 , 9902-P1-0005-CP1 , 9902-P1-0006-CP1 , 9902-P1-0007-CP1 , 9902-P1-0008-CP1 , 9902-P1-0009-CP1 , 9902-P1-0010-CP1 , 9902-P1-0011-CP1 , 9902-P1-0012-CP1 , 9902-P1-0013-CP1 , 9902-P1-0014-CP1 , 9902-P1-0015-CP1 | 2023/09/05 07:08 | GSC ended without comments | |
7393 | Datang Pingyin Phase I Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 07:57 | GSC ended without comments | ||
10346 | Nam Ngiep II Hydropower Project | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/23 07:07 | GSC ended without comments | ||
9104 | Municipal Solid Waste to Energy Project by Western Power Company (Pvt) Ltd | PA | Sri Lanka | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/21 10:34 | GSC ended without comments | ||
6000 | Jaroensompong Corporation Panomsarakham Landfill Gas to Energy Project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/02 11:30 | GSC ended without comments | ||
0490 | Catalytic N2O destruction project in the tail gas of the Nitric Acid Plant of Abu Qir Fertilizer Co. | PA | Egypt | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 10:15 | GSC ended without comments | ||
7373 | Mithapur Solar Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/20 07:48 | GSC ended without comments | ||
9449 | Energy efficiency measures in Office Building at Kalina of Ivory Property Trust | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 06:07 | GSC ended without comments | ||
5486 | Bundled 9.00 MW Wind Power Generation Project by Gangadhar Narsingdas Agrawal Group | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/15 10:39 | GSC ended without comments | ||
5553 | Renewable Wind Power generation for promoting energy security | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/15 10:38 | GSC ended without comments | ||
7370 | 14.7 MW Bundled Wind Power Project in the state of Maharashtra and Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/15 10:38 | GSC ended without comments | ||
9411 | Chilean small scale renewable energy programme of activities | PoA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/05 22:39 | GSC ended without comments | ||
8303 | 15 MW Wind energy farm at Gopalpura, Karnataka by HZL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:40 | GSC ended without comments | ||
9376 | Wind Power Project at Tadas, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 08:44 | GSC ended without comments | ||
9416 | Promotion of renewable energy generation in India- Programme of Activities | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9416-P1-0001-CP1 , 9416-P1-0002-CP1 , 9416-P1-0003-CP1 , 9416-P1-0004-CP1 , 9416-P1-0005-CP1 , 9416-P1-0006-CP1 , 9416-P1-0007-CP1 , 9416-P1-0008-CP1 , 9416-P1-0009-CP1 , 9416-P1-0010-CP1 , 9416-P1-0011-CP1 , 9416-P1-0012-CP1 , 9416-P1-0013-CP1 , 9416-P1-0014-CP1 , 9416-P1-0015-CP1 , 9416-P1-0016-CP1 | 2023/09/05 09:54 | GSC ended without comments | |
10080 | Rondinha Small Hydroelectric Power Plant | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 13:31 | GSC ended without comments | ||
6086 | Datang Ningxia Ningdong (Baitugang Town Changliushui) Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:43 | GSC ended without comments | ||
7651 | Chongqing Fufeng Cement 9MW Waste Heat Recovery for Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 10:06 | GSC ended without comments | ||
10064 | 5.6 MW CDM Bundled Solar Power Project in the state of Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/15 10:40 | GSC ended without comments | ||
4182 | Hebei Fengning Batou Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 07:44 | GSC ended without comments | ||
10708 | El Jahuel Solar Power Project, Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 01:48 | GSC ended without comments | ||
7772 | 1.6 MW Wind Power Project by M/s. Prachar Energy in Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 13:17 | GSC ended without comments | ||
6748 | Huaneng Yunnan Eryuan Ganhaizi Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:22 | GSC ended without comments | ||
9570 | Bundled wind power project Cape Verde | PA | Cape Verde | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/10/11 15:01 | GSC ended without comments | ||
10177 | Grid Connected Solar Photovoltaic project by M/s Solar Semiconductor Power Company (India) Private Limited in the State of Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 09:09 | GSC ended without comments | ||
4778 | Inner Mongolia Guyang Huaishuo I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 06:33 | GSC ended without comments | ||
9889 | PoA for Promotion of the Improved Water Mills (IWM) in Nepal | PoA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9889-P1-0001-CP1 , 9889-P1-0002-CP1 , 9889-P2-0001-CP2 | 2023/09/05 07:09 | GSC ended without comments | |
6484 | Wind Energy Project in Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 12:56 | GSC ended without comments | ||
7073 | Datang Yumen Changma First (north) 48MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 08:15 | GSC ended without comments | ||
7484 | Small-scale solar electrical programme, South Africa | PoA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/30 16:27 | GSC ended without comments | ||
10257 | Dois Arcos Landfill Gas Project Activity | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 20:07 | GSC ended without comments | ||
9933 | Improved Cook Stove Project 1, Nkhata Bay District, Malawi | PA | Malawi | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/07 09:19 | GSC ended without comments | ||
7935 | 223 MWel Combined Cycle Power Plant (CCPP) Skopje | PA | The former Yugoslav Republic of Macedonia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/18 14:16 | GSC ended without comments | ||
9769 | Energy Efficient Stoves Program (EESP) | PoA | Ethiopia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9769-P1-0001-CP1 , 9769-P1-0002-CP1 , 9769-P1-0003-CP1 | 2023/12/13 21:19 | GSC ended without comments | |
6133 | Jianping Shiyingzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 09:15 | GSC ended without comments | ||
7188 | 10 MW solar power project by NKG Infrastructure Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 08:11 | GSC ended without comments | ||
10441 | Programme of Activities for Small Scale Solar and Wind Power Generation in Sri Lanka | PoA | Sri Lanka | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10441-P1-0001-CP1 , 10441-P1-0002-CP1 , 10441-P1-0003-CP1 , 10441-P1-0004-CP1 | 2023/07/05 13:17 | GSC ended without comments | |
8855 | Solar Water Heater Program in India | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
8855-P1-0002-CP1 , 8855-P1-0003-CP1 , 8855-P1-0004-CP1 , 8855-P1-0005-CP1 , 8855-P1-0006-CP1 , 8855-P1-0007-CP1 , 8855-P2-0001-CP2 , 8855-P2-0002-CP2 , 8855-P2-0003-CP2 , 8855-P2-0004-CP2 , 8855-P2-0008-CP1 | 2023/10/11 12:23 | GSC ended without comments | |
6690 | Grid connected bundled wind projects in Gujarat and Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:48 | GSC ended without comments | ||
10732 | Guadalupe Solar PV Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 02:51 | GSC ended without comments | ||
7968 | 8 MW bundled wind power project by Bannari Amman Spinning Mills Limited in Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 07:54 | GSC ended without comments | ||
10059 | SHP Nova Mutum CDM Project (JUN1178), Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/02 19:15 | GSC ended without comments | ||
6390 | Wind Energy Project in Harapanahalli, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 11:29 | GSC ended without comments | ||
4551 | Za Hung Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:27 | GSC ended without comments | ||
5310 | Nam Chim Hydro Power Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:28 | GSC ended without comments | ||
5727 | Song Bung 6 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:28 | GSC ended without comments | ||
4236 | Ban Coc Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:46 | GSC ended without comments | ||
7537 | Clean Energy Project in the State of Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 08:52 | GSC ended without comments | ||
5791 | CGN Yunnan Mouding Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:21 | GSC ended without comments | ||
4970 | Dak Mi 4 Hydropower Project, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/28 11:00 | GSC ended without comments | ||
1774 | Electricity generation from mustard crop residues: Tonk, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 12:11 | GSC ended without comments | ||
9101 | USHODAYA WIND POWER | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:53 | GSC ended without comments | ||
7110 | Uberlândia landfills I and II | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 22:10 | GSC ended without comments | ||
6016 | Qian’an Wangxin Caizi Town Windfarm Project Phase I | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:07 | GSC ended without comments | ||
2347 | 150 MW grid connected Wind Power based electricity generation project in Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/18 08:04 | GSC ended without comments | ||
10584 | Associated Gas Recovery and Utilization at Khamilah oil field area at Block-27 in Wilayat lbri of the Sultanate of Oman | PA | Oman | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 08:57 | GSC ended without comments | ||
10240 | 102 MW Wind Power Project, ONGC, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:09 | GSC ended without comments | ||
7556 | Huaneng Dongying Hekou Phase V Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:18 | GSC ended without comments | ||
0480 | Jaguari Energética S. A. – Furnas do Segredo Small Hydro Power Plant | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 15:27 | GSC ended without comments | ||
7431 | Project Karaha Unit 1 PT. Pertamina Geothermal Energy | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 09:34 | GSC ended without comments | ||
6797 | Joburg Landfill Gas to Energy Project | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/10 10:04 | GSC ended without comments | ||
9544 | Bundle Wind Power Project-EnKing International (CDM.SEP-09-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:11 | GSC ended without comments | ||
5257 | Combined cycle natural gas based grid connected power plant at Jegurupadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:11 | GSC ended without comments | ||
9371 | Wind Power Project by Rajasthan Gum Private Limited (EKI.CDM.Mar-11-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:07 | GSC ended without comments | ||
9482 | Bundled Wind Power Project- EnKing International (CDM.November-10-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 14:08 | GSC ended without comments | ||
2627 | Nam Pia Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:27 | GSC ended without comments | ||
10038 | Las Palmas Small Hydroelectric Power Plant | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 16:45 | GSC ended without comments | ||
10115 | Waste Heat Recovery based power generation at JK Lakshmi Cement Limited, in Sirohi, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 12:20 | GSC ended without comments | ||
6187 | Longsheng Nanshan Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 08:02 | GSC ended without comments | ||
5947 | CTL Landfill Gas Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/04 21:23 | GSC ended without comments | ||
6791 | CGN Ningan Laoyeling Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:20 | GSC ended without comments | ||
7341 | Datang Changqing Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 07:35 | GSC ended without comments | ||
8052 | Sichuan Golden-Elephant Sincerity Line 3 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/01 04:31 | GSC ended without comments | ||
2049 | Heilongjiang Beiantun 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 09:06 | GSC ended without comments | ||
10286 | Brazilian PoA for NAMA incentivized NCRE Projects | PoA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10286-P1-0001-CP1 , 10286-P1-0002-CP1 , 10286-P1-0003-CP1 , 10286-P1-0004-CP1 , 10286-P1-0005-CP1 , 10286-P1-0006-CP1 , 10286-P1-0007-CP1 , 10286-P1-0008-CP1 | 2023/10/16 23:42 | GSC ended without comments | |
10168 | Liberty Oil Mills Limited – Wind Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:29 | GSC ended without comments | ||
10125 | 5 MW Solar PV Power Plant CDM Project by OPG Energy Private Ltd., - Baap, Jodhpur, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:29 | GSC ended without comments | ||
1687 | 24.8 MW Wind power project by Belgaum Wind Farms Private Ltd. in Gadag, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:29 | GSC ended without comments | ||
8079 | 13.2 MW Wind Mill Power Project in Theni district of Tamil Nadu, by JISL-India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 15:42 | GSC ended without comments | ||
7444 | Biomass based cogeneration project at Bhagwati Vintrade, Ramgarh, Jharkhand, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:54 | GSC ended without comments | ||
5228 | Wind power project by Relaxo Footwears Limited in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:54 | GSC ended without comments | ||
6003 | Wind power project by Sterling Agro Industries Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:53 | GSC ended without comments | ||
0453 | NorthWind Bangui Bay Project | PA | Philippines | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/20 08:31 | GSC ended without comments | ||
1455 | Jinxiang – Golden Elephant Line 1 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 05:45 | GSC ended without comments | ||
6435 | Huaneng Tieling Pingdingpu Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:07 | GSC ended without comments | ||
0347 | Chambal Power Limited’s (CPL) proposed 7.5 MW biomass based power project at Rangpur, Kota District, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/09 12:10 | GSC ended without comments | ||
8021 | Delta do Parnaíba Wind Power Plant Complex CDM Project Activity. | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/03 18:28 | GSC ended without comments | ||
3316 | Queluz and Lavrinhas Renewable Energy Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 13:46 | GSC ended without comments | ||
0373 | Săo Joăo Landfill Gas to Energy Project (SJ) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 19:58 | GSC ended without comments | ||
9948 | Impact Carbon Global Safe Water Programme of Activities (PoA) | PoA | Rwanda,Uganda,Nigeria,Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9948-P1-0001-CP1 , 9948-P1-0002-CP1 , 9948-P1-0003-CP1 , 9948-P1-0004-CP1 , 9948-P1-0005-CP1 , 9948-P1-0006-CP1 , 9948-P1-0007-CP1 , 9948-P1-0008-CP1 , 9948-P1-0009-CP1 , 9948-P1-0010-CP1 , 9948-P1-0011-CP1 , 9948-P1-0012-CP1 , 9948-P1-0013-CP1 , 9948-P1-0014-CP1 , 9948-P1-0015-CP1 , 9948-P1-0016-CP1 , 9948-P1-0017-CP1 , 9948-P1-0018-CP1 , 9948-P1-0019-CP1 , 9948-P1-0020-CP1 , 9948-P1-0021-CP1 , 9948-P1-0022-CP1 , 9948-P1-0023-CP1 , 9948-P1-0024-CP1 , 9948-P1-0025-CP1 , 9948-P1-0026-CP1 , 9948-P1-0027-CP1 , 9948-P1-0028-CP1 , 9948-P1-0029-CP1 , 9948-P1-0030-CP1 , 9948-P1-0031-CP1 , 9948-P1-0032-CP1 , 9948-P1-0033-CP1 , 9948-P1-0034-CP1 , 9948-P1-0035-CP1 , 9948-P1-0036-CP1 , 9948-P1-0037-CP1 , 9948-P1-0038-CP1 , 9948-P1-0039-CP1 , 9948-P1-0040-CP1 , 9948-P1-0041-CP1 , 9948-P1-0042-CP1 , 9948-P1-0043-CP1 , 9948-P1-0044-CP1 , 9948-P1-0045-CP1 , 9948-P1-0046-CP1 , 9948-P1-0047-CP1 , 9948-P1-0048-CP1 , 9948-P1-0049-CP1 , 9948-P1-0050-CP1 , 9948-P1-0051-CP1 , 9948-P1-0052-CP1 , 9948-P1-0053-CP1 , 9948-P1-0054-CP1 , 9948-P1-0055-CP1 , 9948-P1-0056-CP1 , 9948-P1-0057-CP1 , 9948-P1-0058-CP1 , 9948-P1-0059-CP1 , 9948-P1-0060-CP1 , 9948-P1-0061-CP1 , 9948-P1-0062-CP1 , 9948-P1-0063-CP1 , 9948-P1-0064-CP1 , 9948-P1-0065-CP1 , 9948-P1-0066-CP1 , 9948-P1-0067-CP1 , 9948-P1-0068-CP1 , 9948-P1-0069-CP1 , 9948-P1-0070-CP1 , 9948-P1-0071-CP1 , 9948-P1-0072-CP1 , 9948-P1-0073-CP1 , 9948-P1-0074-CP1 , 9948-P1-0075-CP1 , 9948-P1-0076-CP1 , 9948-P1-0077-CP1 , 9948-P1-0078-CP1 , 9948-P1-0079-CP1 , 9948-P1-0080-CP1 , 9948-P1-0081-CP1 , 9948-P1-0082-CP1 , 9948-P1-0083-CP1 , 9948-P1-0084-CP1 , 9948-P1-0085-CP1 , 9948-P1-0086-CP1 , 9948-P1-0087-CP1 , 9948-P1-0088-CP1 , 9948-P1-0089-CP1 , 9948-P1-0090-CP1 , 9948-P1-0091-CP1 , 9948-P1-0092-CP1 , 9948-P1-0093-CP1 , 9948-P1-0094-CP1 , 9948-P1-0095-CP1 , 9948-P1-0096-CP1 , 9948-P1-0097-CP1 , 9948-P1-0098-CP1 , 9948-P1-0099-CP1 , 9948-P1-0100-CP1 , 9948-P1-0101-CP1 , 9948-P1-0102-CP1 , 9948-P1-0103-CP1 , 9948-P1-0104-CP1 , 9948-P1-0105-CP1 | 2023/11/06 22:40 | GSC ended without comments | |
6278 | Huaneng Shanxi Ningwu Dongmafang Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:08 | GSC ended without comments | ||
9524 | 5 MW Solar PV Power Project at Port Blair (A & N) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/17 11:09 | GSC ended without comments | ||
9964 | 5 MW Solar PV Power Project at NTPC Faridabad | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/17 11:12 | GSC ended without comments | ||
4930 | Vaayu India Wind Power Project in Tamilnadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/09 11:01 | GSC ended without comments | ||
1915 | China Guangdong Shenzhen Qianwan LNG generation project | PA | China | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/22 02:16 | GSC ended without comments | ||
7527 | 13.3 MW grid connected bundled wind electricity generation project at Rajasthan and Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/02 08:22 | GSC ended without comments | ||
8960 | Maibarara Geothermal Power Project | PA | Philippines | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 08:06 | GSC ended without comments | ||
8026 | Huaneng Hebei Huailai 49.5MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 06:34 | GSC ended without comments | ||
3591 | Rice husk based power generation project by MECBL at Raigarh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 10:44 | GSC ended without comments | ||
8407 | Generation of electricity from 3.0MW capacity wind turbines by Avon Cycles Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 10:50 | GSC ended without comments | ||
9789 | Restoration of Degraded Lands through Reforestation in Aberdare Forest Complex & National Park area, Kenya | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:37 | GSC ended without comments | ||
8044 | CGN Tongyu Xinfa C wind farm project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:51 | GSC ended without comments | ||
0170 | El Molle – Landfill gas (LFG) capture project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/11 20:11 | GSC ended without comments | ||
4477 | Biomass based Steam Generation at Machhar Polymer Pvt. Limited, Dist-Baroda, (Gujarat), India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:34 | GSC ended without comments | ||
6456 | Wind power project at Jaibhim by SIIL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:33 | GSC ended without comments | ||
9592 | Thangarabalu Small Hydel Project at Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:34 | GSC ended without comments | ||
4776 | Run-of-the-river Hydroelectric Power Project in Uttarakhand by Alaknanda Hydro Power Company Limited. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:34 | GSC ended without comments | ||
7005 | Wind power project by iEnergy Wind Farms (Theni) Private Limited, Tamilnadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 08:43 | GSC ended without comments | ||
7235 | BRT Metrobus 2-13, Mexico | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/29 08:52 | GSC ended without comments | ||
5576 | 7.5 MW wind power project at Jaisalmer, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 09:20 | GSC ended without comments | ||
0259 | Trupan Biomass Power Plant in Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 16:26 | GSC ended without comments | ||
9973 | Biomass based power plant in Mahendargarh, Haryana | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/01 05:54 | GSC ended without comments | ||
10035 | Bundled Wind Energy Project in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 08:19 | GSC ended without comments | ||
8451 | CGN Kashi Yingjisha Phase I 20MWp Grid-connected PV Power Plant Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:09 | GSC ended without comments | ||
4352 | Bundled Solar Power Project by EKI Energy Services Limited (EKIESL-CDM.July-14-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/05 11:38 | GSC ended without comments | ||
10401 | Wind Power Project by Evergreen Boardlam (EKIESL-CDM-APRIL-16-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/05 11:37 | GSC ended without comments | ||
10409 | Bundled Wind Power Project by Woodside Fashions Limited & Group (EKIESL-CDM.June-16-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/05 11:38 | GSC ended without comments | ||
10363 | 15 MW Wind Power Project by RSPL Ltd (EKIESL-CDM-May-16-04) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/05 11:38 | GSC ended without comments | ||
5367 | 5 MW Dunali Run-of-the-river, Small Hydro Electric Project”, Chamba district, Himachal Pradesh by M/s Jala Shakti Limited (JSL). | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 14:35 | GSC ended without comments | ||
3747 | Yunnan Gaohe River 4th level Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 04:14 | GSC ended without comments | ||
9735 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.January-12-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:43 | GSC ended without comments | ||
9528 | Wind energy based power generation project by Nakoda Limited at Madhya Pradesh, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 08:40 | GSC ended without comments | ||
6031 | Cepco Wind Power Project in Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 12:47 | GSC ended without comments | ||
5746 | CGN Inner Mongolia Suniteyouqi Phase 3 Windfarm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:57 | GSC ended without comments | ||
8486 | Biomass residues power generation Programme | PoA | South Africa | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
8486-P1-0001-CP1 | 2023/11/24 13:40 | GSC ended without comments | |
4699 | Huaneng Shandong Rongcheng Chudao Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:40 | GSC ended without comments | ||
4736 | Huaneng Gansu Guazhou Ganhekou No.2 Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:43 | GSC ended without comments | ||
3891 | Huaneng Wuchuan Lihanliang Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:56 | GSC ended without comments | ||
3415 | Jilin Da’an Dagangzi Wind Power Project Phase III | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 09:18 | GSC ended without comments | ||
3596 | Huaneng Wuchuan Lihanliang Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:01 | GSC ended without comments | ||
2010 | Dachunhe 50 MW Hydropower Project in Yunnan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:31 | GSC ended without comments | ||
4749 | Huaneng Panjin Dawa Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 14:01 | GSC ended without comments | ||
8643 | Olkaria I Units 4&5 Geothermal Project | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 12:59 | GSC ended without comments | ||
7901 | Wind power project in Tamil Nadu by SWPPL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:00 | GSC ended without comments | ||
7099 | Bundled wind Project by Premier Mills, Pushpathur, Dindugal, Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:59 | GSC ended without comments | ||
8365 | Grid connected Wind Power Generation Project by Premier Mills Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:00 | GSC ended without comments | ||
9418 | Grid Connected Wind Power Generation in Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:01 | GSC ended without comments | ||
8342 | Nargund Wind Power Project in Karnataka (India) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:00 | GSC ended without comments | ||
7585 | 3 MW bundled wind Power Project in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:00 | GSC ended without comments | ||
0530 | ARAPUtanga Centrais ELétricas S. A. - ARAPUCEL - Small Hydroelectric Power Plants Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 22:06 | GSC ended without comments | ||
6338 | Da’an Haituo Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:33 | GSC ended without comments | ||
6193 | Energy Efficiency at Malvinas gas plant | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 15:45 | GSC ended without comments | ||
10070 | Punta Palmeras Wind Power Project | PA | Chile | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/12 12:46 | GSC ended without comments | ||
9216 | Hydro Power Project at Masli and Hydro Power Project at Tangnu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 09:09 | GSC ended without comments | ||
9924 | Grid Connected Wind Power Project in Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/10 10:36 | GSC ended without comments | ||
9062 | Liaoning Guoli Fuxin Wangsiyingzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 04:04 | GSC ended without comments | ||
9165 | Taebaek Wind Park (Hasami Samcheok) CDM Project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 06:00 | GSC ended without comments | ||
9746 | Qian’an Wangxin Caizi Town Windfarm Project Phase II | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:10 | GSC ended without comments | ||
8955 | Wind based renewable energy project by CLP Wind Farms India Private Limited in Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/09 10:18 | GSC ended without comments | ||
10207 | Biogas recovery and CHP production in modules 5 & 6 of Tehran South Wastewater Treatment Plant | PA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/12 13:53 | GSC ended without comments | ||
2993 | China Niaoerchao Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 08:31 | GSC ended without comments | ||
10729 | Programme of Activity for renewable energy growth in Asian countries | PoA | Philippines | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 06:42 | GSC ended without comments | ||
2128 | Shri Bajrang RE Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:11 | GSC ended without comments | ||
8553 | Renewable Energy Bundled Wind Project in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:11 | GSC ended without comments | ||
4364 | 50.4 MW wind power project by EN Renewable Energy Pvt. Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:11 | GSC ended without comments | ||
0921 | 4.5MW grid-connected Sugur Mini Hydel Scheme at SLS Power Industries Ltd in Bellary District, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:15 | GSC ended without comments | ||
7704 | RenovAndes H1, Small Hydropower Project | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:15 | GSC ended without comments | ||
6250 | Hulunbuir City Zhaluomude Wind Farm Datang 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:27 | GSC ended without comments | ||
6248 | Datang Qiubei Yangxiongshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:28 | GSC ended without comments | ||
1749 | Xiaoxi Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/01 09:42 | GSC ended without comments | ||
10596 | Peruvian PoA for NCRE Projects | PoA | Peru | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
2024/01/04 17:25 | GSC ended without comments | ||
8022 | K. N. RAM WIND POWER CDM PROJECT | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/05/03 11:38 | GSC ended without comments | ||
1081 | Gansu Datang Yumen 49 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 09:09 | GSC ended without comments | ||
7593 | Song Tranh 4 Hydropower Project, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/28 11:29 | GSC ended without comments | ||
8958 | Fuel Switch Project at Chittoor by Jain Irrigation Systems Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 15:48 | GSC ended without comments | ||
9043 | Datang Bazhou Bohu 20MW Solar Power Plant Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:15 | GSC ended without comments | ||
10719 | Kinguele Aval hydropower plant | PA | Gabon | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 09:56 | GSC ended without comments | ||
8260 | CDM Africa Wind and Solar Programme of Activities for South Africa | PoA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
8260-P1-0001-CP1 , 8260-P1-0002-CP1 , 8260-P1-0003-CP1 , 8260-P1-0004-CP1 , 8260-P1-0005-CP1 , 8260-P1-0006-CP1 , 8260-P1-0007-CP1 | 2023/11/16 09:27 | GSC ended without comments | |
4964 | Bundled Wind Power Project in Jamnagar, Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 08:22 | GSC ended without comments | ||
5598 | Huaneng Keyouzhongqi Denggao Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:39 | GSC ended without comments | ||
10749 | Energy efficient equipment in mix use LE PARC project | PA | Ecuador | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 02:07 | GSC ended without comments | ||
2858 | Sichuan Kangding Huashangou 72MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 01:28 | GSC ended without comments | ||
10241 | Nam Pha Gnai Hydropower Project | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 07:09 | GSC ended without comments | ||
9991 | Nam Long Hydropower project | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 17:31 | GSC ended without comments | ||
3903 | Daode 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/26 09:30 | GSC ended without comments | ||
6291 | Huaneng Shanghai Chongming Qianwei Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:04 | GSC ended without comments | ||
2953 | Guangdong Taishan Shangchuandao Island Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 09:02 | GSC ended without comments | ||
8235 | Gonal Small Hydro Project by South West Hydro | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 14:09 | GSC ended without comments | ||
7200 | Huadian Sichuan Mulihe Lizhou Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 07:12 | GSC ended without comments | ||
7186 | Improvement in Energy Efficiency through Micro-Irrigation Systems (MIS) in cultivation of Banana Crop in Jalgaon, Dhule Nadurbar and Nashik districts, Maharastra State, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 15:52 | GSC ended without comments | ||
6205 | Zhangbei Wudengshan Wind Farm Phase II Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:32 | GSC ended without comments | ||
0171 | Caieiras landfill gas emission reduction | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/26 22:25 | GSC ended without comments | ||
8505 | Alu Kerqin Qi Balaqirude Wind Farm 45MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:47 | GSC ended without comments | ||
8060 | Improved Cookstoves Program for Zambia | PoA | Zambia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
8060-P1-0001-CP1 , 8060-P1-0002-CP1 , 8060-P1-0003-CP1 , 8060-P1-0004-CP1 , 8060-P2-0001-CP2 | 2023/12/04 20:28 | GSC ended without comments | |
4703 | Vinh Son 5 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 05:00 | GSC ended without comments | ||
5281 | Hebei Yuxian Yongshengzhuang 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 08:05 | GSC ended without comments | ||
8249 | Catalytic abatement of N2O in Nitric Acid Plant of Shiraz Petrochemical Company | PA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 02:34 | GSC ended without comments | ||
6260 | Shuangyashan Laopinggang Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 03:08 | GSC ended without comments | ||
10647 | Waste Heat Recovery based power generation at UCWL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:42 | GSC ended without comments | ||
6878 | 12 MW biomass based renewable power generation in Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 09:05 | GSC ended without comments | ||
10554 | Restoration of degraded mangroves as a climate change mitigation and adaptation strategy in Asia | PoA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10554-P1-0001-CP1 | 2024/01/19 04:27 | GSC ended without comments | |
2897 | Egypt Vehicle Scrapping and Recycling Program | PoA | Egypt | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
2023/10/24 10:25 | GSC ended without comments | ||
10060 | Medium Pressure Steam Condensate water recovery | PA | Qatar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/04 08:17 | GSC ended without comments | ||
0349 | Sihwa Tidal Power Plant CDM Project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/27 23:18 | GSC ended without comments | ||
1170 | K water Wind Power Plant Project in Bang-a muri | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/27 23:20 | GSC ended without comments | ||
1769 | Yunnan Weixi Jicha Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 08:02 | GSC ended without comments | ||
6207 | Improved Cook Stoves programme for Rwanda | PoA | Rwanda,Cameroon | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6207-P1-0001-CP1 , 6207-P1-0005-CP1 , 6207-P1-0006-CP1 , 6207-P1-0008-CP1 , 6207-P1-0009-CP1 , 6207-P1-0010-CP1 | 2023/10/04 09:40 | GSC ended without comments | |
9785 | Restoration of Degraded Lands through Reforestation in MAU Forest Complex, Kenya | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:33 | GSC ended without comments | ||
0922 | Catalytic N2O Abatement Project in the Tail Gas of the Nitric Acid Plant of the Hanwha Corporation (HWC) in Ulsan, Republic of Korea | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 08:44 | GSC ended without comments | ||
9897 | Chongli Xiqiaoliang Phase II 48MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 06:44 | GSC ended without comments | ||
6257 | Shuangyashan Guokuishan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 03:02 | GSC ended without comments | ||
10524 | 70MW Solar Power Plant Project in Ba Ria - Vung Tau, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 06:16 | GSC ended without comments | ||
9562 | 4.8 MW Wind Power CDM Project by Golden Hatcheries | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:21 | GSC ended without comments | ||
4540 | 19.8MW grid connected Wind farm project by K.P.R Mill Private Limited, Tamil Nadu, India at Villages: Keelaveeranam, Kuruchampatti, Vadi, Ayansurandi, Rajagopalaperi, District: Tirunelveli, Tamilnadu by M/s K. P. R. Mill Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:22 | GSC ended without comments | ||
9256 | Bundled Wind Power Project by Aditya Marine Limited (EKIESL-CDM.January-12-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:22 | GSC ended without comments | ||
9700 | Green Electricity Generation from Wind Power Project located in Coimbatore, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:22 | GSC ended without comments | ||
5370 | 1.50 MW Wind Power Project by JC Retail India Pvt. Ltd. Pune Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:22 | GSC ended without comments | ||
3251 | Inner Mongolia Zhuozi III Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 02:22 | GSC ended without comments | ||
8756 | Providencia I: 1.8MW Small Hydro Power Generation Plant | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/12 21:57 | GSC ended without comments | ||
1880 | Tiefa Coal Industry Group CMM Utilization Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 02:56 | GSC ended without comments | ||
7791 | 10 MWp Grid Interactive Solar Power Project in Gujarat Solar Park, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:13 | GSC ended without comments | ||
9602 | Solar Power project in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:12 | GSC ended without comments | ||
7100 | Los Cocos II Wind Farm Project | PA | Dominican Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 22:33 | GSC ended without comments | ||
10429 | Mali Rural Electrification Program | PoA | Mali | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10429-P1-0001-CP1 , 10429-P1-0002-CP1 | 2023/11/30 18:31 | GSC ended without comments | |
6488 | Methane Capture and Utilization Project at Melewar Palm Oil Mill, Malaysia | PA | Malaysia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 09:28 | GSC ended without comments | ||
6161 | Renewable Energy PoA in India | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6161-P1-0002-CP1 , 6161-P2-0003-CP1 , 6161-P2-0004-CP1 , 6161-P2-0005-CP1 , 6161-P2-0006-CP1 | 2023/10/16 07:46 | GSC ended without comments | |
1787 | Valdivia biomass power plant | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 17:01 | GSC ended without comments | ||
0346 | Nueva Aldea Biomass Power Plant Phase 2 | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 17:05 | GSC ended without comments | ||
10236 | Sogamoso Hydroelectric Project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/05 23:43 | GSC ended without comments | ||
0404 | Irani Biomass Electricity Generation Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 15:56 | GSC ended without comments | ||
8471 | Datang 8.9MW Rooftop Photovoltaic Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 06:55 | GSC ended without comments | ||
10326 | Soubré Hydropower Project | PA | Côte d`Ivoire | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 17:57 | GSC ended without comments | ||
0693 | Votorantim’s Hydropower Plant with existing reservoir “Pedra do Cavalo” CDM Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 17:35 | GSC ended without comments | ||
8117 | Da’an Haituo Wind Farm Phase IV Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 15:16 | GSC ended without comments | ||
10146 | Wind Power Project by B. G. Shirke Construction Technology Pvt. Ltd. and Shirke Infrastructure in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/09/03 12:37 | GSC ended without comments | ||
9039 | Yunus Energy Limited 50 MW Wind Farm Project | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:09 | GSC ended without comments | ||
7917 | Jinsheng Huyang Line 3 N2O Abatement Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/01 04:02 | GSC ended without comments | ||
10727 | Sustainable Climate transformation by e-mobility in Cambodia | PoA | Cambodia | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA Only
|
2023/12/22 00:56 | GSC ended without comments | ||
9226 | Jirau Hydro Power Plant | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/09/05 17:44 | GSC ended without comments | ||
9828 | Henan Mianchi Shangqu Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:10 | GSC ended without comments | ||
8692 | Renewable Wind Power Project by Ratnagiri Wind Power Projects Private Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 07:04 | GSC ended without comments | ||
4241 | Huaneng Tongliao Zhurihe Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:05 | GSC ended without comments | ||
5081 | Huaneng Shandong Hekou Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:07 | GSC ended without comments | ||
5896 | Sichuan Toudaoqiao 10MW Hydropower Project of China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 04:07 | GSC ended without comments | ||
7230 | Daan Laifu Wind Farm Phase III Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:14 | GSC ended without comments | ||
5277 | Huaneng Tongyu Xinhua 1F Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:37 | GSC ended without comments | ||
0574 | Erlongshan Hydropower Project in Gansu Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/16 14:48 | GSC ended without comments | ||
8174 | CGN Dabancheng Phase I 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:08 | GSC ended without comments | ||
10676 | Sol de Septiembre PV CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/03 05:35 | GSC ended without comments | ||
2636 | AVN08-S-01, Methane Recovery and Biogas Utilization Project, Nghe An Province, Vietnam | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/25 12:24 | GSC ended without comments | ||
9798 | Suba and Usaquen hydroelectric CDM umbrella project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 22:11 | GSC ended without comments | ||
6765 | Guangdong Xuwen Dengloujiao 49.5MW Wind Farm Project | PA | China | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2024/04/05 14:37 | GSC ended without comments | ||
5249 | Zhanjiang Biomass Power Generation Project in Guangdong Province | PA | China | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/22 02:22 | GSC ended without comments | ||
10108 | Gas Flaring Reduction Project at GGS, Chariali, Sibasagar, ONGC, Assam | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:19 | GSC ended without comments | ||
10302 | Replacement of Main Oil Line (MOL) Pumps at Neelam & Heera Asset of ONGC | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:21 | GSC ended without comments | ||
6888 | Natural gas based combined cycle power plant in Tripura, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:23 | GSC ended without comments | ||
4877 | Bannari Amman Spinning Mills Wind Power Project managed by Enercon (India) Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 10:35 | GSC ended without comments | ||
5693 | Dalian Tuoshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 09:21 | GSC ended without comments | ||
2021 | Shandong Haiyang Qiuershan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 02:11 | GSC ended without comments | ||
3653 | Micro-hydro Promotion | PA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/05 08:35 | GSC ended without comments | ||
10077 | Reducing Gas Leakages within the Titas Gas Distribution Network in Bangladesh | PA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/07 11:09 | GSC ended without comments | ||
1836 | Poechos II hydroelectric plant project | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 18:22 | GSC ended without comments | ||
0851 | Daegu Bangcheon-Ri Landfill Gas CDM Project | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 00:24 | GSC ended without comments | ||
9664 | Renewable Wind Energy Project in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/25 08:22 | GSC ended without comments | ||
9631 | Lower Kotmale Oya Mini Hydro Power Project | PA | Sri Lanka | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:38 | GSC ended without comments | ||
2532 | Jiangsu Dongling Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/07 13:08 | GSC ended without comments | ||
9069 | Curva dos Ventos Wind Farms | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 21:50 | GSC ended without comments | ||
7980 | Burgos Wind Project | PA | Philippines | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 04:32 | GSC ended without comments | ||
9564 | 1.5 MW Small Hydro Project at Yeleswaram, East Godavari Dist., Andhra Pradesh, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/20 12:36 | GSC ended without comments | ||
10574 | Reduction of N2O emissions from the new NA plant 6 of Hu-Chems Fine Chemical Corp. | PA | Republic of Korea | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:58 | GSC ended without comments | ||
8343 | Youyu Yangqianhe Tieshanbao 49.5 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:04 | GSC ended without comments | ||
10678 | GHG Programme- Energy Demand Group1 | PoA | Mozambique | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/26 14:13 | GSC ended without comments | ||
9370 | Power Generation through Wind Energy at Metro Power Company Limited | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 10:10 | GSC ended without comments | ||
7731 | Dapein (1) Hydropower Project in Union of Myanmar | PA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 16:45 | GSC ended without comments | ||
9793 | 5.4 MW bundled Wind power project activity in kutch district of Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 08:01 | GSC ended without comments | ||
9074 | Mampuri Wind Power Project | PA | Sri Lanka | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/30 11:33 | GSC ended without comments | ||
9955 | Inner Mongolia Chayouhouqi Hongmu Phase I 20MWp Solar Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:24 | GSC ended without comments | ||
6864 | Fuel Efficient Stoves in Africa | PoA | Zambia,Zimbabwe | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6864-P1-0004-CP1 , 6864-P1-0005-CP1 , 6864-P2-0006-CP1 , 6864-P2-0007-CP1 | 2023/11/27 11:54 | GSC ended without comments | |
4856 | Abohar Branch Canal Based Small Hydro Project in Punjab, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 10:22 | GSC ended without comments | ||
8251 | Ningxia Angli Lingwu Photovoltaic Grid Connected Power Plant Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 06:59 | GSC ended without comments | ||
8712 | Maesod Wastewater Treatment and Biogas Utilisation Project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 03:39 | GSC ended without comments | ||
9864 | Jiangxi Datang International Songmen Mountain Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 09:47 | GSC ended without comments | ||
9915 | Xe Namnoy 2 - Xe Katam 1 Hydropower Project | PA | Lao People's Democratic Republic | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 07:12 | GSC ended without comments | ||
5962 | International water purification programme | PoA | Ethiopia,El Salvador,Chile,Egypt,Kenya,Gambia,Madagascar,Nicaragua,Mexico,South Africa,Uganda,Viet Nam,Iran (Islamic Republic of),Cambodia,Malawi | Continue to apply the currently applied CDM methodology at transition |
N/A
|
5962-P1-0002-CP1 , 5962-P1-0003-CP1 , 5962-P1-0004-CP1 , 5962-P1-0005-CP1 , 5962-P1-0006-CP1 , 5962-P1-0007-CP1 , 5962-P1-0008-CP1 , 5962-P1-0009-CP1 , 5962-P1-0010-CP1 , 5962-P1-0011-CP1 , 5962-P1-0012-CP1 , 5962-P1-0013-CP1 , 5962-P1-0014-CP1 , 5962-P1-0015-CP1 , 5962-P1-0016-CP1 , 5962-P1-0017-CP1 , 5962-P1-0018-CP1 , 5962-P1-0019-CP1 , 5962-P1-0020-CP1 , 5962-P1-0021-CP1 , 5962-P1-0022-CP1 , 5962-P2-0002-CP2 , 5962-P2-0003-CP2 | 2023/10/16 07:22 | GSC ended without comments | |
6089 | Datang Ningxia Taiyangshan Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 03:06 | GSC ended without comments | ||
7576 | Amakhala Emoyeni Grid Connected 138.6 MW Wind Farm, Phase 1, South Africa | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/05 10:27 | GSC ended without comments | ||
6451 | Huaneng Inner Mongolia Chenbaerhuqi Daliang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:36 | GSC ended without comments | ||
3779 | Accion Fraterna Biogas CDM project for rural communities in Anantapur, Andhra Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/24 06:17 | GSC ended without comments | ||
5334 | Generation of electricity from 4.8MW capacity wind mills by Sun-n-Sand Hotels Private Limited at Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 06:20 | GSC ended without comments | ||
6315 | Biomass based power project by Harinagar Sugar Mills Ltd | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/10/12 14:15 | GSC ended without comments | ||
9502 | PoA on RE | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9502-P1-0002-CP1 , 9502-P1-0003-CP1 , 9502-P1-0004-CP1 , 9502-P1-0005-CP1 , 9502-P1-0006-CP1 , 9502-P1-0007-CP1 , 9502-P1-0008-CP1 , 9502-P2-0002-CP2 , 9502-P2-0003-CP2 , 9502-P2-0004-CP2 , 9502-P2-0005-CP2 | 2023/11/14 14:03 | GSC ended without comments | |
7446 | Hydro-based power generation project by New Asian Infrastructure Development Private Limited in Maharashtra, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/01 08:41 | GSC ended without comments | ||
8046 | 24 MW wind power project in Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:37 | GSC ended without comments | ||
6896 | Wind energy project in Theni, Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:36 | GSC ended without comments | ||
5917 | Heilongjiang Xingkaihu Fengmishan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:05 | GSC ended without comments | ||
8971 | Generation of Electricity from 2.50 MW wind turbine in Tirunelveli District, Tamilnadu, India by M/s. Woodbriar Estate Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:11 | GSC ended without comments | ||
9053 | Bundled Wind Project-I of Shivashri in Sadawaghapur Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:11 | GSC ended without comments | ||
9553 | LTML Wind Energy Project in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:12 | GSC ended without comments | ||
9601 | 4.25MW grid connected wind farm by Avaneetha Textiles (P) Ltd., Tamil Nadu, India at village Andipatti taluk, Uthamapalayam taluk & Teni taluk, Teni District. Tamil nadu. India by M/S Avaneetha Textiles (P) Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:11 | GSC ended without comments | ||
7504 | Song Bac Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:12 | GSC ended without comments | ||
7384 | UCC RAK Waste Heat Recovery | PA | United Arab Emirates | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:12 | GSC ended without comments | ||
7614 | Wind Energy Project in Tamilnadu, India – structured by Sri Shanmugavel Group | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:11 | GSC ended without comments | ||
9420 | 3 MW bundled wind power project in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:12 | GSC ended without comments | ||
8478 | 2.1 MW Wind Power Project in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:12 | GSC ended without comments | ||
6640 | 3 MW Wind Power Project by Fashion Suitings (P) Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 13:13 | GSC ended without comments | ||
10345 | Institutional Improved Cook Stoves for Schools and Institutions in Uganda | PA | Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/15 11:16 | GSC ended without comments | ||
8120 | Gongcheng Xiling Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:06 | GSC ended without comments | ||
5914 | Heilongjiang Mishan Linchang Liumao Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:01 | GSC ended without comments | ||
4924 | Hebei Chongli Jiaocheshan 49.3MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 07:56 | GSC ended without comments | ||
9960 | 5.1MW Grid Connected Wind Electricity Generation at Ngong Hills, Kenya. | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 13:00 | GSC ended without comments | ||
7861 | Fujian Zhaoan Meiling Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:27 | GSC ended without comments | ||
8153 | Beipiao Xiaotazi Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 08:27 | GSC ended without comments | ||
2441 | Shanxi Wulushan 1st phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 08:15 | GSC ended without comments | ||
3362 | Landfill biogas extraction and combustion plant in El Inga I and II landfill (Quito, Ecuador) | PA | Ecuador | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/07/11 10:56 | GSC ended without comments | ||
6794 | Wind Energy Project in Saundatti, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/09 10:14 | GSC ended without comments | ||
10319 | Wind Power Project in Maharashtra by SJVN Limited | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2024/03/21 12:56 | GSC ended without comments | ||
10545 | Los Andes PV CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 15:07 | GSC ended without comments | ||
5921 | Grid Connected Wind Energy Generation at Andhra Pradesh. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 09:20 | GSC ended without comments | ||
10000 | Low head Hydropower Development Project, Punjab Pakistan | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 13:30 | GSC ended without comments | ||
10190 | Utilization of waste gas from DRI Kiln for power generation in Raipur, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/01/11 08:28 | GSC ended without comments | ||
1284 | Ningxia Shapotou Hydropower Project of Yellow River | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:28 | GSC ended without comments | ||
10028 | HPP José Luiz Müller de Godoy Pereira (JUN1173), Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 19:32 | GSC ended without comments | ||
1179 | Embralixo/Araúna - Bragança Landfill Gas Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 01:29 | GSC ended without comments | ||
10531 | Latam Landfill PoA | PoA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10531-P1-0001-CP1 , 10531-P1-0002-CP1 , 10531-P1-0003-CP1 , 10531-P1-0004-CP1 , 10531-P1-0005-CP1 , 10531-P1-0006-CP1 , 10531-P1-0007-CP1 , 10531-P1-0008-CP1 | 2023/11/08 15:49 | GSC ended without comments | |
3092 | Inner Mongolia Chayouhouqi Hongmu 48 MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:01 | GSC ended without comments | ||
10576 | Ghana Improved Cookstove Project by EWP in Republic of Korea | PoA | Ghana | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10576-P1-0001-CP1 , 10576-P1-0002-CP1 , 10576-P1-0003-CP1 , 10576-P1-0004-CP1 , 10576-P1-0005-CP1 , 10576-P1-0006-CP1 , 10576-P1-0007-CP1 , 10576-P1-0008-CP1 , 10576-P1-0009-CP1 , 10576-P1-0010-CP1 , 10576-P1-0011-CP1 , 10576-P1-0012-CP1 , 10576-P1-0013-CP1 , 10576-P1-0014-CP1 , 10576-P1-0015-CP1 , 10576-P1-0016-CP1 , 10576-P1-0017-CP1 , 10576-P1-0018-CP1 , 10576-P1-0019-CP1 , 10576-P1-0020-CP1 | 2023/07/20 03:06 | GSC ended without comments | |
10371 | Clean energy project in Jaisalmer, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/10 10:42 | GSC ended without comments | ||
2315 | Amayo 40 MW Wind Power Project - Nicaragua | PA | Nicaragua | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 23:40 | GSC ended without comments | ||
7376 | Wind Power Project in Rajasthan & Maharashtra by Sterling Agro Industries Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 07:55 | GSC ended without comments | ||
1856 | Wind power project by HZL in Gujarat. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:20 | GSC ended without comments | ||
9164 | Installation of Energy Efficient Transformers (IEET) | PoA | Kenya | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
9164-P1-0001-CP1 | 2023/11/24 13:46 | GSC ended without comments | |
5055 | Huaneng Tongyu Xinhua 1D Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:30 | GSC ended without comments | ||
8087 | Karoo Renewable Energy Facility (Nobelsfontein Wind) | PA | South Africa | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/29 08:58 | GSC ended without comments | ||
1326 | Jorethang Loop Hydroelectric Project, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 17:30 | GSC ended without comments | ||
3370 | Amman Ghabawi Landfill Gas to Energy Project | PA | Jordan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/05/06 09:43 | GSC ended without comments | ||
5678 | Wind Power Project by National Enterprises at Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:27 | GSC ended without comments | ||
5112 | Green House Gas Abatement through installation of a wind power project for export to the Grid. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:26 | GSC ended without comments | ||
10360 | 5 MW Solar Power Project by Baba Group (EKIESL-CDM-May-16-03) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:26 | GSC ended without comments | ||
8954 | Coega IDZ Windfarm | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 09:08 | GSC ended without comments | ||
5851 | Guoshuitou Diaobingshan Quanyangou Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:26 | GSC ended without comments | ||
9052 | Datang Hami 20MW Solar PV Grid-Connected Power Generation Phase One Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 07:59 | GSC ended without comments | ||
5933 | CGN Jilin Daan Laifu Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:08 | GSC ended without comments | ||
6573 | Caixa Econômica Federal Solid Waste Management and Carbon Finance Project | PoA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6573-P1-0002-CP1 , 6573-P2-0001-CP2 , 6573-P2-0003-CP1 | 2023/11/16 19:05 | GSC ended without comments | |
0773 | Ceran's Monte Claro Run of River Hydropower Plant CDM Project Activity | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/07 17:22 | GSC ended without comments | ||
6238 | Dingbian Zhangjiashan Wind Farm Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 05:04 | GSC ended without comments | ||
6255 | Shanxi Shuocheng Limin First Phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 03:29 | GSC ended without comments | ||
5030 | Nam Khanh Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 10:01 | GSC ended without comments | ||
6626 | Huaneng Fubei Liangguanyingzi Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:09 | GSC ended without comments | ||
2692 | Bethlehem Hydroelectric project | PA | South Africa | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 15:22 | GSC ended without comments | ||
9210 | Punatsangchhu-I Hydroelectric Project, Bhutan | PA | Bhutan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/02/29 11:09 | GSC ended without comments | ||
5181 | Zhurihe Phase I 49.5MW Wind Farm Project in Xilingol League, Inner Mongolia | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:23 | GSC ended without comments | ||
10144 | Flare Gas Recovery in Sarkhoon and Qeshm Gas Treating Company | PA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 02:40 | GSC ended without comments | ||
10351 | Climate action with rural households by Climate Future Action Stichting | PoA | Zambia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/25 19:52 | GSC ended without comments | ||
9293 | Greenhouse Gas Emission Reductions Through Thermal Solar Power Technology - Rajasthan Sun Technique Energy Pvt. Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 10:27 | GSC ended without comments | ||
4118 | Asahan 1 Hydroelectric Power Plant 2 x 90 MW | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 15:22 | GSC ended without comments | ||
9990 | Mampuri Wind Power Project 3 | PA | Sri Lanka | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/30 11:37 | GSC ended without comments | ||
7979 | Huaneng Yunnan Eryuan Guanyinshan Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:39 | GSC ended without comments | ||
2741 | Wuxi Hydropower Project, Qiyang County, Hunan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/12 11:43 | GSC ended without comments | ||
10008 | Installation of Energy Efficient Cookstoves in Myanmar | PoA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10008-P1-0001-CP1 , 10008-P1-0002-CP1 | 2023/12/27 07:23 | GSC ended without comments | |
4937 | Anhanguera Hydro Power Project | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/14 12:48 | GSC ended without comments | ||
9626 | DelAgua Public Health Program in Eastern Africa | PoA | Rwanda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9626-P1-0001-CP1 , 9626-P1-0002-CP1 , 9626-P1-0003-CP1 , 9626-P1-0004-CP1 , 9626-P1-0005-CP1 , 9626-P1-0006-CP1 , 9626-P1-0007-CP1 , 9626-P1-0008-CP1 , 9626-P1-0009-CP1 , 9626-P1-0010-CP1 , 9626-P1-0011-CP1 , 9626-P1-0012-CP1 , 9626-P1-0013-CP1 , 9626-P1-0014-CP1 , 9626-P1-0015-CP1 , 9626-P1-0016-CP1 , 9626-P1-0017-CP1 , 9626-P1-0018-CP1 , 9626-P1-0019-CP1 , 9626-P1-0020-CP1 , 9626-P1-0021-CP1 , 9626-P1-0022-CP1 , 9626-P1-0023-CP1 , 9626-P1-0024-CP1 , 9626-P1-0025-CP1 , 9626-P1-0026-CP1 , 9626-P1-0027-CP1 , 9626-P1-0028-CP1 , 9626-P1-0029-CP1 , 9626-P1-0030-CP1 , 9626-P1-0031-CP1 , 9626-P1-0032-CP1 | 2023/12/22 10:03 | GSC ended without comments | |
1254 | The TIMARPUR-OKHLA Waste Management Company Pvt Ltd's (TOWMCL) integrated waste to energy project in Delhi | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 12:36 | GSC ended without comments | ||
7354 | Samsung Electronics energy efficient domestic refrigerators manufacturing project in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/18 10:21 | GSC ended without comments | ||
5995 | Gansu Jingtai Shatangzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 02:32 | GSC ended without comments | ||
2012 | Gansu Zhuoni Niuzi 30MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:32 | GSC ended without comments | ||
9167 | 4.5 MW Sechi grid-connected hydro electric project in Himachal Pradesh. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:02 | GSC ended without comments | ||
7041 | Mudanjiang Guojiagou Landfill Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/12 11:06 | GSC ended without comments | ||
10139 | Wind Power Plants Eurus II and Renascença V CDM Project | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/13 18:15 | GSC ended without comments | ||
3116 | Inner Mongolia Chifeng Daguangdingzishan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:30 | GSC ended without comments | ||
10544 | 12MW PV Bundling CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/06 15:04 | GSC ended without comments | ||
8513 | Yunnan Qiubei Ganmalu Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 03:16 | GSC ended without comments | ||
8198 | 21 MW Wind energy farm at Palladam, TamilNadu by HZL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:43 | GSC ended without comments | ||
5733 | Datang Anzishan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 08:05 | GSC ended without comments | ||
10474 | Improved Cooking Stove Programme in Burundi supported by Republic of Korea | PoA | Burundi | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10474-P1-0001-CP1 | 2023/08/22 18:05 | GSC ended without comments | |
10648 | Mandalay Kyar Ni Kan Landfill Methane Recovery Project | PA | Myanmar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 08:35 | GSC ended without comments | ||
2406 | CGN Inner Mongolia Duerbote Wind farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:46 | GSC ended without comments | ||
4437 | GREEN ENERGY TO GRID at Dhule, Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:34 | GSC ended without comments | ||
7562 | 10.4 MW wind power project at Tiwari site of Jodhpur district in the state of Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:34 | GSC ended without comments | ||
9113 | 13.75 MW wind power project at Bellary & Davangere district in the state Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:34 | GSC ended without comments | ||
10164 | Wind Power Project in Maharashtra State, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:35 | GSC ended without comments | ||
8323 | Grid Connected Gas based Combined Cycle Power Project in Andhra Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:34 | GSC ended without comments | ||
9345 | 1.8 MW Wind Power Project in Tamil Nadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:35 | GSC ended without comments | ||
4892 | 1.2 MW Wind Power Generation Project in Gujarat for Hotel Golden Emerald | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 10:35 | GSC ended without comments | ||
5875 | Shanxi Wulushan 3rd phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:33 | GSC ended without comments | ||
8327 | CGN Dunhuang Phase II 9MW Grid-connected PV Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:00 | GSC ended without comments | ||
3084 | Huaneng Tongliao Baolongshan Phase III Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:39 | GSC ended without comments | ||
7001 | Shanxi Limin Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 08:56 | GSC ended without comments | ||
10335 | New gas fired power plant at Ressano Garcia | PA | Mozambique | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/24 18:31 | GSC ended without comments | ||
5871 | Wind power project by TVS Energy Limited in Theni, Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:37 | GSC ended without comments | ||
9688 | Bundled wind power project in the state of Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:37 | GSC ended without comments | ||
10592 | 50 MW Kurnool Solar PV Power Project by M/s Prayatna Developers Pvt. Ltd. at Gani, Kurnool, AP. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:33 | GSC ended without comments | ||
10593 | 50 MW (DCR) Nalgonda Solar PV Power Project by Parampujya Solar Energy at Telangana | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:31 | GSC ended without comments | ||
10594 | 50 MW Mahoba Solar PV Power Project by M/s Prayatna Developers Pvt. Ltd. at Mahoba, UP | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:32 | GSC ended without comments | ||
10603 | Solar Project by Parampujya Solar Energy Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:33 | GSC ended without comments | ||
10582 | 72 MWac Ramnad Solar Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:32 | GSC ended without comments | ||
10583 | 216 MWac Adani Green Energy (Tamilnadu) Solar Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:33 | GSC ended without comments | ||
10581 | 72 MWac Kamuthi Renewable Energy Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:29 | GSC ended without comments | ||
5928 | Adani Enterprises Limited Solar PV Power Project in Gujarat, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 11:31 | GSC ended without comments | ||
10212 | Chakshi Mini Hydro Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:33 | GSC ended without comments | ||
6102 | CGN Luoding Yapoji Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 02:46 | GSC ended without comments | ||
5862 | Liaoning Fuxin Houzhatai Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 04:03 | GSC ended without comments | ||
10090 | “Feed switchover from Naphtha to Natural Gas at Phulpur plant of IFFCO” at Phulpur, Allahabad, Uttar Pradesh by M/s Indian Farmers Fertiliser Cooperative Ltd. (IFFCO) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 11:17 | GSC ended without comments | ||
9610 | 5MW Solar PV Power Plant by AEPL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 10:35 | GSC ended without comments | ||
9244 | Gangani Small Hydro Electric Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/14 10:20 | GSC ended without comments | ||
8526 | Renewable energy utilization in the new and existing buildings in Henan Province | PoA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 04:30 | GSC ended without comments | ||
7588 | CGN Gaozhou Zhongjiankeng Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:24 | GSC ended without comments | ||
6715 | Chancay Hydroelectric Power Plant | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 18:30 | GSC ended without comments | ||
3718 | Shandong Huaneng Hekou Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:47 | GSC ended without comments | ||
5923 | Wind Power Project in Rajasthan, India by M/s Devki Builders Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/24 07:52 | GSC ended without comments | ||
8646 | Olkaria IV Geothermal Project | PA | Kenya | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 12:58 | GSC ended without comments | ||
9943 | Canhanduba Landfill Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/17 13:18 | GSC ended without comments | ||
6958 | Huining County Solar Cooker Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 14:30 | GSC ended without comments | ||
9346 | Handan LFG Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 03:57 | GSC ended without comments | ||
6759 | Huaneng Tongliao Kezuohouqi Halunhuduga Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:17 | GSC ended without comments | ||
3078 | Huaneng Jilin Taobei Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:30 | GSC ended without comments | ||
10742 | El Popal 20 MW hydroelectric project | PA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/08 21:45 | GSC ended without comments | ||
4400 | Huaneng Guizhou Jiucaiping Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:40 | GSC ended without comments | ||
1269 | Ningxia Yinyi 49.50MW Wind-farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:18 | GSC ended without comments | ||
3374 | Helanshan Phase V 40.5MW Wind-farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:17 | GSC ended without comments | ||
3660 | Ningxia Taiyangshan 45MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:19 | GSC ended without comments | ||
4292 | Shaanxi Shenmu Hengdong Waste Gas Based Electricity Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:19 | GSC ended without comments | ||
4725 | Shenmu County Tengyuan Coal Chemical Industry Co., Ltd. 60 MW Semi-coke Waste Gas for Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:20 | GSC ended without comments | ||
4732 | Shenmu County Xiangrong Coal Chemical Industry Co., Ltd. 25 MW Semi-coke Waste Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:20 | GSC ended without comments | ||
4140 | Shenmu County Hengsheng Coal Chemical Co., Ltd. 30MW Semi-coke Waste Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:21 | GSC ended without comments | ||
7309 | Shenmu County Derun Carbonaceous Reductant Co., Ltd. Semi-coke Waste Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:21 | GSC ended without comments | ||
7308 | Fugu County Yabo 30MW Semi-coke Waste Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:22 | GSC ended without comments | ||
7310 | Fugu County Moyuan Magnesium & Coal Industry Co., Ltd. Semi-coke Waste Gas Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 13:22 | GSC ended without comments | ||
0297 | LaGeo, S. A. de C. V., Berlin Geothermal Project, Phase Two | PA | El Salvador | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/07 18:13 | GSC ended without comments | ||
8791 | Nallakonda wind farm in Andhra Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/23 06:48 | GSC ended without comments | ||
4492 | Wastewater Treatment with Biogas System in Palm Oil Mill at Sikao, Trang, Thailand | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/31 11:31 | GSC ended without comments | ||
10105 | Dubai 200MW Photovoltaic Plant | PA | United Arab Emirates | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 11:09 | GSC ended without comments | ||
10481 | Ambatolampy 20 MW solar PV | PA | Madagascar | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 13:18 | GSC ended without comments | ||
4463 | Metro Delhi, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/29 08:50 | GSC ended without comments | ||
1667 | 2.5 MW Rice husk based cogeneration plant at Hanuman Agro Industries Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:23 | GSC ended without comments | ||
8427 | Los Hierros Hydroelectric Power Plant | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/04 21:25 | GSC ended without comments | ||
9849 | Zorlu Enerji Wind Project | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:31 | GSC ended without comments | ||
2589 | Fujian Zhangpu Liuao 3rd phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 08:28 | GSC ended without comments | ||
1123 | Ciudad Juarez Landfill Gas to Energy Project | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 18:01 | GSC ended without comments | ||
9824 | 10.5MW PowerGen Lanka Small Scale Wind Power CDM Project in Sri Lanka | PA | Sri Lanka | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/07/05 13:13 | GSC ended without comments | ||
10547 | Integrated Municipal Solid Waste Management Activities Programme in India | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/26 12:30 | GSC ended without comments | ||
1280 | 2.2 MW hydropower plant in Birsinghpur, Madhya Pradesh of Ascent Hydro Projects Limited (AHPL) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:57 | GSC ended without comments | ||
4176 | Ibi Batéké degraded savannah afforestation project for fuelwood production (Democratic Republic of Congo) | PA | Democratic Republic of the Congo | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 21:21 | GSC ended without comments | ||
2599 | Huaneng Tongliao Baolongshan Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:33 | GSC ended without comments | ||
9950 | Bundled Wind Power Project at Rajasthan India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/20 10:33 | GSC ended without comments | ||
8917 | 10 MW Solar Photovoltaic Power Plant in Rajkot, Gujarat (India) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:38 | GSC ended without comments | ||
9630 | 5 MW Solar Photovoltaic based Power Generation in Jodhpur, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:38 | GSC ended without comments | ||
6201 | Wind power project in Tirunelveli, Tamil Nadu by TVS Energy Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:38 | GSC ended without comments | ||
9651 | 15 MW wind power project by Green Infra Wind Energy Assets Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:39 | GSC ended without comments | ||
9699 | 24 MW Wind Energy based Power Generation In Theni, Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 13:39 | GSC ended without comments | ||
6211 | Yunnan Province Yao’an County Jianshanliangzi Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:31 | GSC ended without comments | ||
7394 | Datang Wendeng Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/27 07:39 | GSC ended without comments | ||
4679 | Kohinoor Wind Power Project in Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 09:45 | GSC ended without comments | ||
1996 | Sichuan Balangkou 96MW Hydropower Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 01:26 | GSC ended without comments | ||
9247 | Programme of Activities to introduce renewable energy system into collective housing, Republic of Korea | PoA | Republic of Korea | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
PoA and all CPAs will be declared to this form
|
9247-P1-0002-CP1 , 9247-P1-0003-CP1 , 9247-P2-0001-CP2 | 2023/10/10 10:30 | GSC ended without comments | |
10055 | Panuco Bagasse Cogeneration Project | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 16:20 | GSC ended without comments | ||
6823 | Datang Tuquan Laoyeling Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 09:40 | GSC ended without comments | ||
6519 | Energy Efficient Green Building at New Delhi by ONGC Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/10 07:17 | GSC ended without comments | ||
2486 | Conversion of SF6 to the alternative cover gas SO2 at RIMA magnesium production | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 22:11 | GSC ended without comments | ||
4917 | Huaneng Tongyu Xinhua 1B Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:24 | GSC ended without comments | ||
9116 | Chaglla Hydroelectric Power Plant CDM Project | PA | Peru | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 14:36 | GSC ended without comments | ||
4181 | Jilin Da’an Dagangzi Wind Power Project Phase IV | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 07:25 | GSC ended without comments | ||
8318 | Huaneng Ningxia Qingtongxia solar PV Power Plant | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:57 | GSC ended without comments | ||
8937 | Datang Tulufan 20MW Solar Power Plant Phase I Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:19 | GSC ended without comments | ||
5747 | CGN Liaoning Paoya Dabeishan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:17 | GSC ended without comments | ||
7347 | Kiran Energy Solar PV Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 09:23 | GSC ended without comments | ||
6154 | Ningxia Zhongning Changshantou Wind Farm CGN Dazhanchang 49.5MW Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 02:52 | GSC ended without comments | ||
4581 | Wuzhou Hydropower Project of Dao County, Yongzhou City, Hunan Province, P.R.China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 04:39 | GSC ended without comments | ||
9306 | Choloma Hydroelectric Project | PA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 16:29 | GSC ended without comments | ||
2729 | 5 MW Chirchind Grid-Connected SHP in Himachal Pradesh, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 13:03 | GSC ended without comments | ||
7970 | CGN Yunnan Mouding Dajianfeng Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 06:41 | GSC ended without comments | ||
8099 | Lautaro Generation Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/09 00:05 | GSC ended without comments | ||
8744 | 3.3 MW Wind power project at Theni by FFF-Site SF158 & SF317 | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/28 09:39 | GSC ended without comments | ||
7461 | GHG abatement through Solar Power Generation at Jaisalmer, Rajasthan, India | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/19 10:24 | GSC ended without comments | ||
10546 | Santa Rosa PV CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/03 05:37 | GSC ended without comments | ||
8144 | Korindo Biomass Power Plant, Indonesia | PA | Indonesia | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/29 07:49 | GSC ended without comments | ||
6117 | CGN Xinxing Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 02:50 | GSC ended without comments | ||
6850 | Datang Yumen Changma First (east) 48MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 03:54 | GSC ended without comments | ||
0493 | Indocement Alternative Fuels Project | PA | Indonesia | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/24 07:04 | GSC ended without comments | ||
6762 | Methane Capture and Utilization Project at Carotino Palm Oil Mill, Malaysia | PA | Malaysia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 09:26 | GSC ended without comments | ||
3920 | 1.25 MW Wind Power Project at Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:19 | GSC ended without comments | ||
6651 | 10 MW Biomass based Power plant in Punjab, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:19 | GSC ended without comments | ||
9771 | Renewable energy generation at Hamira | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:19 | GSC ended without comments | ||
6360 | Baner Sangam small hydro power project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:19 | GSC ended without comments | ||
10182 | Biomass Energy Conservation Programme | PoA | Malawi,Rwanda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10182-P1-0001-CP1 , 10182-P1-0002-CP1 , 10182-P1-0003-CP1 , 10182-P1-0004-CP1 , 10182-P1-0005-CP1 , 10182-P1-0006-CP1 , 10182-P1-0007-CP1 , 10182-P1-0008-CP1 , 10182-P1-0009-CP1 , 10182-P1-0010-CP1 , 10182-P1-0011-CP1 , 10182-P1-0012-CP1 , 10182-P1-0013-CP1 , 10182-P1-0014-CP1 , 10182-P1-0015-CP1 , 10182-P1-0016-CP1 , 10182-P1-0017-CP1 , 10182-P1-0018-CP1 , 10182-P1-0019-CP1 , 10182-P1-0020-CP1 , 10182-P1-0021-CP1 , 10182-P1-0022-CP1 , 10182-P1-0023-CP1 , 10182-P1-0024-CP1 , 10182-P1-0025-CP1 , 10182-P1-0026-CP1 , 10182-P1-0027-CP1 , 10182-P1-0028-CP1 , 10182-P1-0029-CP1 , 10182-P1-0030-CP1 , 10182-P1-0031-CP1 , 10182-P1-0032-CP1 , 10182-P1-0033-CP1 , 10182-P1-0034-CP1 , 10182-P1-0035-CP1 , 10182-P1-0036-CP1 , 10182-P1-0037-CP1 , 10182-P1-0038-CP1 , 10182-P1-0039-CP1 , 10182-P1-0040-CP1 , 10182-P1-0041-CP1 , 10182-P1-0042-CP1 , 10182-P1-0043-CP1 , 10182-P1-0044-CP1 , 10182-P1-0045-CP1 , 10182-P1-0046-CP1 , 10182-P1-0047-CP1 , 10182-P1-0048-CP1 , 10182-P1-0049-CP1 , 10182-P1-0050-CP1 | 2023/07/03 12:36 | GSC ended without comments | |
4326 | Huaneng Tongliao Kezuozhongqi Dongbaiyin Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:52 | GSC ended without comments | ||
9292 | Wind Energy Project PoA | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9292-P1-0001-CP1 , 9292-P1-0002-CP1 , 9292-P1-0003-CP1 , 9292-P1-0004-CP1 , 9292-P1-0006-CP1 , 9292-P2-0005-CP1 | 2023/11/14 13:54 | GSC ended without comments | |
6973 | San Antonio El Sitio Wind Power Project | PA | Guatemala | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 20:45 | GSC ended without comments | ||
1960 | Dongliuxi Erji 12.6 MW Hydropower Project in Hubei Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:46 | GSC ended without comments | ||
1489 | Maocaoping 8 MW Small Hydropower Project in Yunnan Province | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 10:48 | GSC ended without comments | ||
3353 | Huaneng Changyi Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:35 | GSC ended without comments | ||
4255 | Huaneng Tongliao Kezuo Zhong Qi Nanhari Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 05:39 | GSC ended without comments | ||
5998 | CGN Minqin Hongshagang Xianshuijing Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:56 | GSC ended without comments | ||
2417 | Chile: Lircay Run-Of-River Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/23 18:19 | GSC ended without comments | ||
6203 | Song Mien 5 Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 10:29 | GSC ended without comments | ||
9265 | Top Third Ventures Stove Programme | PoA | Kenya,Democratic Republic of the Congo,Zambia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9265-P1-0002-CP1 , 9265-P1-0003-CP1 , 9265-P1-0004-CP1 , 9265-P1-0005-CP1 , 9265-P1-0006-CP1 , 9265-P1-0007-CP1 , 9265-P1-0008-CP1 | 2023/12/06 10:32 | GSC ended without comments | |
1374 | Chile: Hornitos Hydroelectric Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/11 17:55 | GSC ended without comments | ||
6751 | Ningxia Tongxin (Zhangjiayuan Xianyazi) Datang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 09:50 | GSC ended without comments | ||
0198 | San Jacinto Tizate geothermal project | PA | Nicaragua | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/13 22:55 | GSC ended without comments | ||
7415 | Grid Connected Wind Power Project in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 11:25 | GSC ended without comments | ||
7981 | 25.5 MW Wind Energy Farm at Nandurbar Maharashtra by HZL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:34 | GSC ended without comments | ||
6561 | Heilongjiang Jixian Taiyangshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 02:57 | GSC ended without comments | ||
0599 | Jilin Taonan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/26 03:01 | GSC ended without comments | ||
6290 | Dingbian Zhangjiashan Wind Farm Phase II Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 05:14 | GSC ended without comments | ||
1850 | Jiangxi Liujinba 20MW Hydro Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/31 15:44 | GSC ended without comments | ||
2210 | Xiaba 20MW Hydro Power Project in Guizhou Province China. | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/31 15:46 | GSC ended without comments | ||
5314 | Huaneng Shanxi Tianzhen Phase I Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:43 | GSC ended without comments | ||
6633 | Yunnan Eryuan Qilongshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/13 07:27 | GSC ended without comments | ||
6916 | Domestic production and sales of enhanced energy-efficient refrigerators in India by LG Electronics India Pvt Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 05:37 | GSC ended without comments | ||
4880 | Huaneng Tongyu Xinhua 1A Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 11:20 | GSC ended without comments | ||
6454 | Huaneng Tongliao Kailu Jianhua Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:17 | GSC ended without comments | ||
5252 | Huaneng Shandong Shouguang Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/11 13:42 | GSC ended without comments | ||
6350 | Electricity generation from renewable sources – Windfarms Macacos, Juremas, Pedra Preta and Costa Branca | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/07 16:15 | GSC ended without comments | ||
3509 | 9.75 MW Bundled wind power project in Kerala, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/05 12:35 | GSC ended without comments | ||
0168 | BK Energia Itacoatiara Project | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 03:20 | GSC ended without comments | ||
5839 | Datang Qixia Zangjiazhuang Garden Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 04:30 | GSC ended without comments | ||
5060 | Liaoning Chaoyang Kazuo Zhongsanjia Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 08:04 | GSC ended without comments | ||
9822 | Papel Misionero Cogeneration Project Activity with Biomass | PA | Argentina | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/17 15:34 | GSC ended without comments | ||
2685 | Jilin Shuangliao 2nd Phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/26 08:15 | GSC ended without comments | ||
5936 | Shandong Zhaoyuan Xiadian First Phase Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/01 02:59 | GSC ended without comments | ||
8106 | Shanxi Majunyu CMM Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/26 09:09 | GSC ended without comments | ||
6095 | Sustainable Small Hydropower Programme of Activities (PoA) in Viet Nam | PoA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6095-P1-0003-CP1 , 6095-P1-0004-CP1 , 6095-P1-0005-CP1 , 6095-P1-0006-CP1 , 6095-P1-0007-CP1 , 6095-P2-0001-CP2 , 6095-P2-0007-CP2 | 2023/11/06 09:34 | GSC ended without comments | |
7056 | Lower Stung Russei Chrum Hydro-Electric Project | PA | Cambodia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/18 10:55 | GSC ended without comments | ||
9957 | Inner Mongolia Zhuozi Bayin Solar Power Plant Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 08:58 | GSC ended without comments | ||
8854 | Mejillones Sulphuric Acid Plant | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/16 16:11 | GSC ended without comments | ||
9741 | Cabo Leones Wind Farm | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/07 19:51 | GSC ended without comments | ||
9321 | GHG abatement through solar power generation in Bikaner, Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/05/03 11:38 | GSC ended without comments | ||
9608 | 11.9 MW Wind Power Project at Tamil Nadu, India. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/05/03 11:37 | GSC ended without comments | ||
10285 | Ethiopia Off-Grid Renewable Energy Program | PoA | Ethiopia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10285-P1-0001-CP1 , 10285-P1-0002-CP1 , 10285-P1-0003-CP1 | 2023/12/08 20:54 | GSC ended without comments | |
8842 | Huaneng Lijin Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:28 | GSC ended without comments | ||
8734 | India Wind Energy Programme of Activities | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
8734-P2-0002-CP1 , 8734-P2-0003-CP1 , 8734-P2-0004-CP1 | 2023/12/20 11:08 | GSC ended without comments | |
6271 | Datang Pingyin Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 07:19 | GSC ended without comments | ||
9372 | Power Generation through Wind Energy at Gul Ahmed Wind Power Limited | PA | Pakistan | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/27 10:06 | GSC ended without comments | ||
7474 | West Huaybong 3 wind farm project | PA | Thailand | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/24 15:06 | GSC ended without comments | ||
7096 | Pamona 2 Hydroelectric Power Plant Project | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 11:32 | GSC ended without comments | ||
6670 | Inner Mongolia Chifeng Changhangou Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 02:04 | GSC ended without comments | ||
10713 | El Sauce Solar Power Project, Chile | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 01:58 | GSC ended without comments | ||
2088 | Hebei Yuxian Kongzhongcaoyuan 49.5MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/25 10:01 | GSC ended without comments | ||
6287 | UTE 10 MW Grid Connected Wind Power Farm at Caracoles Hill | PA | Uruguay | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 17:44 | GSC ended without comments | ||
7219 | Daan Laifu Wind Farm Phase II Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:13 | GSC ended without comments | ||
2931 | Tao River Lianlu Cascade I 66MW Hydropower Project in Gansu Province, China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/29 15:27 | GSC ended without comments | ||
1371 | Proactiva Mérida Landfill Gas Capture and Flaring project | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 19:38 | GSC ended without comments | ||
6867 | Querétaro landfill-gas-to-energy project | PA | Mexico | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 19:37 | GSC ended without comments | ||
4844 | Zhangjiakou Chabei Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:50 | GSC ended without comments | ||
10403 | 70 MW Bhadla Solar power plant by Fortum Finnsurya Energy Pvt Ltd (EKIESL-CDM-APRIL-16-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 10:44 | GSC ended without comments | ||
3897 | Electric Power Generation from Renewable Sources – Barra da Pacięncia, Ninho da Águia, Corrente Grande, Paiol, Săo Gonçalo and Várzea Alegre Small Hydropower Plants | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/07 16:17 | GSC ended without comments | ||
9452 | Energy Efficiency Measures at MindSpace Building No 6 at Hyderabad | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 05:55 | GSC ended without comments | ||
10050 | Energy Efficiency Measures at MindSpace Building No 11 at Hyderabad | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 05:59 | GSC ended without comments | ||
9457 | Energy Efficiency measures in Buildings of the Mindspace Airoli Project, Navi Mumbai developed by Serene Properties Pvt. Ltd | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/01 05:59 | GSC ended without comments | ||
9232 | Bundled Wind Power Project activity by Muthoot Fincorp Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/30 11:01 | GSC ended without comments | ||
9866 | Henan Yuanbaoshan Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 03:54 | GSC ended without comments | ||
0925 | EnviroServ Chloorkop Landfill Gas Recovery Project. | PA | South Africa | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/08/22 10:44 | GSC ended without comments | ||
10385 | SHP Lajari CDM Project (JUN1200), Brazil | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 14:13 | GSC ended without comments | ||
10404 | Solar Power Project by Fortum FinnSurya Energy Pvt Ltd | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 07:31 | GSC ended without comments | ||
10362 | Wind Power Project by Hetero Wind Power (EKIESL-CDM-May-16-02) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:38 | GSC ended without comments | ||
10361 | Renewable Energy Project by Pramatha Power Pvt. Ltd. Goa (EKIESL- CDM. April 16-04) | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/13 11:44 | GSC ended without comments | ||
10400 | Wind Power Project by The KTM Jewellery Ltd (EKIESL-CDM-May-16-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:43 | GSC ended without comments | ||
5529 | Electricity generation through wind power project at Jaora-MP & Tenkasi-TN | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:43 | GSC ended without comments | ||
9696 | Bundled wind power project - Enking international (CDM.Nov-10-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 11:44 | GSC ended without comments | ||
4928 | Huaneng Changyi Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 04:17 | GSC ended without comments | ||
9254 | GHG abatement from distillery wastewater treatment project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/28 08:59 | GSC ended without comments | ||
9572 | Nepal Biogas Support Program-PoA | PoA | Nepal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9572-P1-0002-CP1 , 9572-P1-0003-CP1 , 9572-P1-0004-CP1 , 9572-P1-0005-CP1 , 9572-P1-0006-CP1 , 9572-P1-0007-CP1 , 9572-P1-0008-CP1 , 9572-P1-0009-CP1 , 9572-P2-0001-CP2 , 9572-P2-0002-CP2 , 9572-P2-0003-CP2 , 9572-P2-0004-CP2 , 9572-P2-0005-CP2 , 9572-P2-0006-CP2 , 9572-P2-0007-CP2 , 9572-P2-0011-CP1 | 2023/11/22 07:25 | GSC ended without comments | |
1005 | Gansu Diebu Niaojiaga 12.9 MW Hydropower Station Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 12:55 | GSC ended without comments | ||
5368 | Wampu Hydro Electric Power Project | PA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/25 10:19 | GSC ended without comments | ||
9118 | Hydro Electric Plant - Hidro Pantasma | PA | Nicaragua | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/24 18:46 | GSC ended without comments | ||
5495 | Electricity generation from renewable sources - Windfarms Santa Clara I, Santa Clara II, Santa Clara III, Santa Clara IV, Santa Clara V, Santa Clara VI and Eurus VI | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/17 20:42 | GSC ended without comments | ||
0648 | Central de Resíduos do Recreio Landfill Gas Project (CRRLGP) | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/21 20:12 | GSC ended without comments | ||
10341 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – Africa | PoA | Kenya,Uganda | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10341-P1-0001-CP1 , 10341-P1-0002-CP1 , 10341-P1-0003-CP1 , 10341-P1-0004-CP1 , 10341-P1-0005-CP1 | 2023/12/08 16:26 | GSC ended without comments | |
9687 | Grid connected electricity generation plant using natural gas at Jurong Island in Singapore | PA | Singapore | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/24 04:23 | GSC ended without comments | ||
10573 | 250 MW Solar Power Plant in Pavagada Solar Park in Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/08 10:38 | GSC ended without comments | ||
7196 | Grid connected electricity generation from renewable source: Windfarm Complex Uniăo dos Ventos, Serveng Civilsan S.A. | PA | Brazil | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 20:11 | GSC ended without comments | ||
6434 | Mexican Renewable Energy Alliance Programme of Activities (PoA) | PoA | Mexico,Malaysia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
6434-P1-0002-CP1 | 2023/10/24 05:10 | GSC ended without comments | |
10662 | Grid-connected Solar PV project in Kahone | PA | Senegal | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/22 18:39 | GSC ended without comments | ||
4499 | Sichuan Province Songpan County Muguadun Hydroelectric Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/09/14 04:19 | GSC ended without comments | ||
4568 | Hydro electric power project by SJVNL in Himachal Pradesh | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2024/03/21 08:27 | GSC ended without comments | ||
5856 | Heilongjiang Yilan Chenguang Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 07:42 | GSC ended without comments | ||
6928 | Guizhou Panjiang Coal Mine Methane Power Generation Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:37 | GSC ended without comments | ||
8371 | Autoclaved Aerated Concrete blocks/panel manufacturing unit based on an energy efficient brick manufacturing technology | PA | India | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/20 11:41 | GSC ended without comments | ||
8491 | Dariali Hydroelectric Power Project | PA | Georgia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/08/13 12:04 | GSC ended without comments | ||
7070 | Bagasse cogeneration project at Lam Son Sugar JSC | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 10:47 | GSC ended without comments | ||
0244 | Aleo Manali 3 MW Small Hydroelectric Project, Himachal Pradesh, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/08/21 11:03 | GSC ended without comments | ||
6439 | Thac Xang Hydropower Project | PA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 10:34 | GSC ended without comments | ||
4760 | Bundled Wind Power Project in Tamil Nadu, India, co-ordinated by Tamil Nadu Spinning Mills Association (TASMA-II) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 09:19 | GSC ended without comments | ||
10116 | Small Hydropower Programme in Colombia | PoA | Colombia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10116-P1-0001-CP1 | 2024/04/16 12:36 | GSC ended without comments | |
0923 | 6.25 MW grid-connected Sattegala Mini Hydel Scheme at SLS Power Industries Ltd., in Chamarajanagar District, Karnataka | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:15 | GSC ended without comments | ||
9467 | 10 MW Manjanadka Hydro project, Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:15 | GSC ended without comments | ||
10294 | Los Laureles Hydroelectric Project | PA | Honduras | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 15:16 | GSC ended without comments | ||
4830 | Huaneng Shandong Hekou Phase III Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:52 | GSC ended without comments | ||
5199 | Datang Qingyuan Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/06 09:00 | GSC ended without comments | ||
7437 | Wind Power Project by RKLPL (EKIESL-CDM.September -11-01) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:34 | GSC ended without comments | ||
7647 | 74 MW wind energy project in Tamilnadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:31 | GSC ended without comments | ||
4251 | 5.10 MW Bundled Wind Power Project in India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:32 | GSC ended without comments | ||
10187 | Khukhni and Mussapur Small Hydro Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:32 | GSC ended without comments | ||
0491 | Rudong County Wind Farm Project – China | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 15:06 | GSC ended without comments | ||
6504 | Mengjialiang Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/22 08:14 | GSC ended without comments | ||
7374 | Mampuri Wind Power Project 2 | PA | Sri Lanka | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/30 11:36 | GSC ended without comments | ||
10496 | 19.2 MWp Solar Power Project by HZL at Debari and Dariba, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:50 | GSC ended without comments | ||
7803 | Da’an Anbai Expressway Xinaili Wind Farm Project(Phase I) | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/21 04:07 | GSC ended without comments | ||
6121 | Wind Power Project by Ushdev International Limited in Tamil Nadu | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:01 | GSC ended without comments | ||
10153 | Chanju I Hydro Electric Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:01 | GSC ended without comments | ||
10140 | Bundled Wind Power Project by EKI Energy Services Limited (EKIESL-CDM.January-14-04) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:00 | GSC ended without comments | ||
9887 | 3.7 MW Bundle Wind Power Project in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:00 | GSC ended without comments | ||
5814 | 8.4 MW Wind Power Project in Rajasthan, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:00 | GSC ended without comments | ||
7434 | Wind Power Project in Karnataka India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:01 | GSC ended without comments | ||
9430 | 9MW Biomass Power Project at Yedlapur Village in Raichur District, Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:01 | GSC ended without comments | ||
4992 | 1.5 MW Wind Power Project in Maharashtra by M/s. Allgrow ventures | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/30 11:01 | GSC ended without comments | ||
4738 | Inner Mongolia Tongliao Zhalute Qi Phase II North Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/22 08:40 | GSC ended without comments | ||
9480 | Wind Power Project in Rajasthan by RSPL Limited | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/03/19 06:27 | GSC ended without comments | ||
6785 | Siping Shanmen Phase II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/18 03:08 | GSC ended without comments | ||
3579 | Huaneng Xinjiang Hami Santanghu Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 04:54 | GSC ended without comments | ||
8228 | PEM SUR - Wind Power plant project | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/12 16:28 | GSC ended without comments | ||
1136 | Gansu Zhouqu Shimenping 15 MW Hydropower Station Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 14:18 | GSC ended without comments | ||
7864 | Recovery and Avoidance of Methane from Industrial Wastewater Treatment Projects | PoA | Indonesia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
7864-P1-0001-CP1 , 7864-P1-0002-CP1 , 7864-P2-0003-CP1 , 7864-P2-0004-CP1 , 7864-P2-0005-CP1 | 2023/10/12 08:55 | GSC ended without comments | |
5977 | Salkhit Wind Farm | PA | Mongolia | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/12 11:15 | GSC ended without comments | ||
6650 | Huaneng Guizhou Hezhang Jiucaiping Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 12:24 | GSC ended without comments | ||
7103 | Greenhouse Gas Emission Reductions Through Photovoltaic Technology - Dahanu Solar Power Pvt. Ltd. | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/26 10:30 | GSC ended without comments | ||
5566 | Chengzigou Hydro Power Plant | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 10:04 | GSC ended without comments | ||
5824 | Utilization of LCV (Low Calorific Value) waste gas for energy generation project at Chanderiya, Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 11:47 | GSC ended without comments | ||
5800 | CGN Xinjiang Tacheng Mayitasi Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:27 | GSC ended without comments | ||
3524 | Caojie Hydropower Project on Jiangling River in Chongqing City | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/01 11:51 | GSC ended without comments | ||
4576 | Vanala Small Scale Hydropower Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:13 | GSC ended without comments | ||
4272 | 2 x 2.5MW Sainj Hydro Electric Project implemented in Shimla District of Himachal Pradesh | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:15 | GSC ended without comments | ||
6674 | 3 MW (2* 1.5 MW) Bundled Wind Power Project at Rajasthan | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/28 11:14 | GSC ended without comments | ||
6652 | Orosi Wind Power Project | PA | Costa Rica | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/12/13 16:47 | GSC ended without comments | ||
10542 | 8.6MW PV Bundling CDM Project | PA | Chile | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/02 20:51 | GSC ended without comments | ||
8946 | Ouarzazate I Concentrated Solar Power Project | PA | Morocco | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2024/04/23 15:49 | GSC ended without comments | ||
8442 | Tata Power - Wind power project at Samana in Jamnagar district, Gujarat | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/20 07:48 | GSC ended without comments | ||
10098 | Priyadarshini, Pertinent and Pristine – Wind Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/20 07:04 | GSC ended without comments | ||
10250 | Solar Power Project by NarasimhaSwamy Solar Generations (EKIESL-CDM.February-15-05) | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:54 | GSC ended without comments | ||
6667 | 4.2 MW Renewable Energy-WIND | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:53 | GSC ended without comments | ||
6720 | Renewable power for sustainable development | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:53 | GSC ended without comments | ||
9755 | Wind Power Electricity Generation in Maharashtra | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 10:54 | GSC ended without comments | ||
7027 | Porto do Delta Wind Power Plant CDM Project | PA | Brazil | Replace the currently applied CDM methodology with an Article 6.4 mechanism methodology at transition |
For project activity
|
2023/11/03 18:30 | GSC ended without comments | ||
6085 | Improving Kiln Efficiency in the Brick Making Industry in Bangladesh (Bundle-2) | PA | Bangladesh | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/23 08:29 | GSC ended without comments | ||
8304 | Daan Laifu Wind Farm Phase IV Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/13 08:54 | GSC ended without comments | ||
5635 | Huaneng Keyouzhongqi Haoli Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 13:15 | GSC ended without comments | ||
10537 | Solar PV based power generation by Voltas Green in Mauritius | PA | Mauritius | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/30 14:24 | GSC ended without comments | ||
3603 | Huaneng Binhai Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:47 | GSC ended without comments | ||
3880 | (ABGSPL): Methane recovery in waste water treatment & Methane/Biomass Energy Generation Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 08:10 | GSC ended without comments | ||
5809 | CGN Inner Mongolia Wuliji Phase II Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/15 07:52 | GSC ended without comments | ||
6279 | Datang Kazuo Gongyingzi Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 02:30 | GSC ended without comments | ||
10477 | Viet Nam Improved Cookstove Project by KCM | PoA | Viet Nam | Continue to apply the currently applied CDM methodology at transition |
N/A
|
10477-P1-0001-CP1 , 10477-P1-0002-CP1 , 10477-P1-0003-CP1 , 10477-P1-0004-CP1 , 10477-P1-0005-CP1 , 10477-P1-0006-CP1 , 10477-P1-0007-CP1 , 10477-P1-0008-CP1 , 10477-P1-0009-CP1 , 10477-P1-0010-CP1 , 10477-P1-0011-CP1 , 10477-P1-0012-CP1 , 10477-P1-0013-CP1 | 2023/10/26 02:14 | GSC ended without comments | |
8314 | Qingtongxia (Shashidunliang) Wind Farm Ningxia Datang International 48MW Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/09 07:37 | GSC ended without comments | ||
3124 | Huaneng Tongliao Zhurihe Phase I Wind Farm Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/14 07:43 | GSC ended without comments | ||
9802 | Biomass Based Co-generation project at Karnal, Haryana | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/10/19 09:32 | GSC ended without comments | ||
0950 | Bio energy in General Deheza –Electricity generation based on peanut hull and sunflower husk | PA | Argentina | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/04 14:01 | GSC ended without comments | ||
5344 | Electricity Generation through Wind Power by SRHHL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:21 | GSC ended without comments | ||
4280 | Wind based power generation by SRHHL | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:20 | GSC ended without comments | ||
10332 | 850 kW Wind Power Project in Kolhapur | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:20 | GSC ended without comments | ||
8072 | Wind Project by VBM | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:20 | GSC ended without comments | ||
5068 | 650 KW Terkiana Mini Hydel Project on Holybein | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:20 | GSC ended without comments | ||
9740 | MCL wind power project in Tamilnadu, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:21 | GSC ended without comments | ||
9235 | 24.75MW Basavanna hydro project in Karnataka, India | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:21 | GSC ended without comments | ||
9571 | Mulibettu Hydro Power Project | PA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/11/29 11:21 | GSC ended without comments | ||
3105 | Datang Chifeng Bolike II Wind Power Project | PA | China | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/11 09:20 | GSC ended without comments | ||
10161 | Implementation of Co-generation plant for Production of Potable Water in Qeshm Island | PA | Iran (Islamic Republic of) | Continue to apply the currently applied CDM methodology at transition |
N/A
|
2023/12/19 02:43 | GSC ended without comments | ||
9181 | MicroEnergy Credits – Microfinance for Clean Energy Product Lines – India | PoA | India | Continue to apply the currently applied CDM methodology at transition |
N/A
|
9181-P1-0002-CP1 , 9181-P1-0003-CP1 , 9181-P1-0004-CP1 , 9181-P1-0005-CP1 , 9181-P1-0006-CP1 , 9181-P1-0007-CP1 , 9181-P1-0008-CP1 , 9181-P1-0009-CP1 , 9181-P1-0010-CP1 , 9181-P1-0011-CP1 , 9181-P1-0012-CP1 , 9181-P1-0013-CP1 , 9181-P1-0014-CP1 , 9181-P1-0015-CP1 , 9181-P1-0016-CP1 , 9181-P1-0017-CP1 , 9181-P1-0018-CP1 , 9181-P1-0019-CP1 , 9181-P1-0020-CP1 , 9181-P1-0021-CP1 , 9181-P1-0022-CP1 , 9181-P1-0023-CP1 , 9181-P1-0024-CP1 , 9181-P1-0025-CP1 , 9181-P1-0026-CP1 , 9181-P1-0027-CP1 , 9181-P1-0028-CP1 , 9181-P1-0029-CP1 , 9181-P1-0030-CP1 , 9181-P1-0031-CP1 , 9181-P1-0032-CP1 , 9181-P1-0033-CP1 , 9181-P1-0034-CP1 , 9181-P1-0035-CP1 , 9181-P1-0036-CP1 , 9181-P1-0037-CP1 , 9181-P1-0038-CP1 , 9181-P1-0039-CP1 | 2023/12/08 15:29 | GSC ended without comments | |
9893 | SHP Paracambi CDM Project (JUN 1064), Brazil | PA | Brazil | Continu |