00:50 27 Sep 26
Info Report Check
Submission incomplete:
1: The PP/DOE are requested to include the details of each parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The PDD (p36) presents the average depth of the lagoon as 5m fr the baseline calculation and 9.5 m for the project emission calculations but no explanation is provided about the difference in the depth value. Further, the spreadsheet indicates a depth of 6 m.
2: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
According to methodology (Step 1 p6), in case of project activities implemented in Greenfield facilities, the DOE undertaking the validation shall include an interview with an independent wastewater expert. The DOE has not reported compliance with this requirement.
1: The PP/DOE are requested to include the details of each parameter listed as per EB 48 Annex 60 paragraph 10 (a).
The PDD (p36) presents the average depth of the lagoon as 5m fr the baseline calculation and 9.5 m for the project emission calculations but no explanation is provided about the difference in the depth value. Further, the spreadsheet indicates a depth of 6 m.
2: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
According to methodology (Step 1 p6), in case of project activities implemented in Greenfield facilities, the DOE undertaking the validation shall include an interview with an independent wastewater expert. The DOE has not reported compliance with this requirement.

Offset now: visit the United Nations Carbon Offset Platform
Connect with us: