1: The DOE is requested to describe how it has validated that the selected monitoring methodology(ies) are correctly applied and they are not subject to clarifications, revisions or deviations as per VVM v1.2, paragraphs 72-74.
The DOE has not requested a clarification of how to calculate and consider project emission due to the electricity consumption in heat exchange stations.

2: The DOE is requested to address the changes made to the project deign since the global stakeholder consultation was conducted as per VVM v1.2 paragraph 173(c).
All PDD previous versions have been listed in the reference document list but DOE has not described the changes made in the project deisgh since the global stakeholder consultation was conducted