Info Report Check
Submission incomplete:
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The DOE has validated that the fuel mix of the project involves 80% cotton stalks, 10% each of soybean stalk and Red gram stalk and the investment analysis has been conducted on this fuel mix. However, the PDD doesn't contain Information on fuel mix of different fuels (each biomass type and coal) under A section of PDD.

2: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
The detailed information is required on how the DOE has validated the data/parameters and equations used to calculate the specific energy consumption for coal and each type of biomass as required by row 6 of table 1 on paragraph 22 of AMS ID v16.

3: The DOE is requested to include information on how it has validated the input values to the financial calculations as per VVM v 1.2 paragraph 114 (a).
In particular :

a) The DOE is requested to clarify the inconsistency on the reported values for moratorium period, loan amount, number of quarterly installments, quarterly installment amount in the PDD (page 15) and IRR calculation sheet (Assumptions tab). The page 15 of PDD indicated that Loan amount (3400 lac), moratorium period (24 months), number of quarterly installment (20) and quarterly installment (170 lac) where as in cell D39-D42 of assumption tab the reported values are loan amount (3468 lac), moratorium period (3 quarters), number of installments (28) and quarterly installment (123.85 lac).

b) Detail Information is required on how the DOE has validated the reported values for WDV depreciation on Civil and structures ( 10%), WDV depreciation on plant and machinery (15%) and fuel requirement.