Info Report Check
Submission incomplete:
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The PP/DOE is requested to provide information on implementation status,in particular, whether the power plant has already started operation
2: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
The DOE is requested to further assess the baseline scenario for the “greenfield facilities” in line with the Clarification provided by EB 61,Annex 5 .The DOE should in order to determine the baseline scenario : 1.Identify alternative design options for the 4500TPD clinker facility along with the feasible usage of the waste energy for those designs (with/without waste heat recovery component /with a waste heat recovery component of a different denomination) that was available to the PP. 2.Undertake an investment comparison analysis for the identified alternative designs to the entire greenfield facility for the determination of the baseline scenario
In doing so,please refer to Clarification “AM_CLA_0219”
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
The PP/DOE is requested to provide information on implementation status,in particular, whether the power plant has already started operation
2: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
The DOE is requested to further assess the baseline scenario for the “greenfield facilities” in line with the Clarification provided by EB 61,Annex 5 .The DOE should in order to determine the baseline scenario : 1.Identify alternative design options for the 4500TPD clinker facility along with the feasible usage of the waste energy for those designs (with/without waste heat recovery component /with a waste heat recovery component of a different denomination) that was available to the PP. 2.Undertake an investment comparison analysis for the identified alternative designs to the entire greenfield facility for the determination of the baseline scenario
In doing so,please refer to Clarification “AM_CLA_0219”