Info Report Check
Submission incomplete:
1: The PP/DOE are requested to describe in detail the calculation of ex-ante emission reductions ( with actual data and equations) as per EB 48 Annex 60 paragraph 10 (a).
According to the PDD v.2.2 (p 31), the formula to calculate "quantity of woody biomass used in the absence of the project activity" applies the adjusted drop out from total population of appliances in period y (DOy). However, the spreadsheet applies (1-DOy) for the calculation of woody biomass used in the absence of the project activity

2: The DOE is requested to describe how it has validated that the selected baseline methodology(ies )applies(y) correctly to the project boundary, baseline identification and algorithms and formulae used to determine emission reductions as per VVM v1.2, paragraphs 67.
Further information is required on how the minimum sampling size of 68 in baseline survey is determined as the baseline survey (page 15- PDD v 2,2) was argued to be based on multi-stage geographical cluster sampling approach (225 elements).The EB 50 Annex 30 para 30 refers to the multistage sampling which is based on sub-groups

3: The DOE is requested to describe all the assumptions/ data/references listed in the PDD for the baseline identification as per VVM v1.2 paragraph 87 (a).
The DOE is required to provide further information related to the replacement of low efficiency appliances as it is not clear whether they will be disposed or still use within the boundary (Methodology II.G V.3, para 20 a) b))

4: The DOE is requested to state that the estimates in the PDD are reasonable for data and parameters that are monitored during implementation and are available after validation as per VVM v1.2 paragraph 91.
The PDD (p.35) states that systems deployed (Ny) in year of 2012, 2013 and 2014 are 5,000, 7,000 and 12,000 accordingly. Further information is required on why the estimation of the monitored parameter Ny ( systems deployed per year) is different for the first 4 years as no relevant information is provided in either the PDD or the validation report.