Info Report Check
Submission incomplete:
1: The PP/DOE are requested to complete all the PDD sections for the description of the project activity as per EB 48 Annex 60 paragraph 10 (a).
Please ensure that the system diagram on page 7 of the PDD is presented correctly and completely

2: The DOE is requested to describe whether the assumptions and data used for the baseline identification are justified appropriately, supported by evidence and can be deemed reasonable as per VVM v1.2 paragraph 87 (c).
The DOE shall further explain how it has validated the baseline alternative H5 (existing or new renewable energy or other waste energy based boilers) and H7 (other heat generation technologies). Please provide detailed information.

3: The DOE is requested to state whether the data and parameters are conservative and appropriate if they are fixed ex-ante (not need to monitor) during the project activity crediting period as per VVM v1.2 paragraph 91.
It is not clear how the appropriateness and conservativeness of the parameter QOE,BL(output energy that can be theoretically produced) has been validated. Please provide the information on: (i) the total energy demand and specific energy consumption of de-watering and de-salting process; (ii) the quantity and energy content of the waste energy produced for the rated capacity/per unit of electricity produced of each electricity generator (captive power plant); (iii) the energy balance of the captive power generators; and (iv) the historical power generation of the the captive power generators.