Submission incomplete:
The DOE is requested to describe the steps taken to assess the equations applied to calculate the baseline/ project emissions, leakage and emission reductions as per the chosen methodology as per VVM v1.2 paragraph 92.
The validation report has not provided information on how the DOE has validated the EFOM of the electricity imports in accordance with the “Tool to calculate the emission factor for an electricity system” version 2.2.1 page 4. Furthermore, the grid emission factor calculation has not been submitted. The DOE is also required to confirm which value of the emissions factor has been used in the calculation, considering that the PDD provides two values of the same EFCO2,ELEC,y (ex ante value of 0.6147 tCO2e/MWh _ PDD on page 22 and 0.6500 tCO2/MWh on page 18).
The DOE is requested to describe the steps taken to assess the equations applied to calculate the baseline/ project emissions, leakage and emission reductions as per the chosen methodology as per VVM v1.2 paragraph 92.
The validation report has not provided information on how the DOE has validated the EFOM of the electricity imports in accordance with the “Tool to calculate the emission factor for an electricity system” version 2.2.1 page 4. Furthermore, the grid emission factor calculation has not been submitted. The DOE is also required to confirm which value of the emissions factor has been used in the calculation, considering that the PDD provides two values of the same EFCO2,ELEC,y (ex ante value of 0.6147 tCO2e/MWh _ PDD on page 22 and 0.6500 tCO2/MWh on page 18).
Offset now: visit the United Nations Carbon Offset Platform
Connect with us: