1: The DOE is requested to describe the steps taken to assess the identification of the baseline scenario of the project activity as per VVM v1.2 paragraph 87.
The Validation Report lacks of information of why the baseline for cooling was determined based on the baseline for electricity and not referred to another source

2: The DOE is requested to describe the steps undertaken to assess if the monitoring arrangements are feasible to be implemented within the project design as per VVM v1.2 paragraph 124(b).
The VR does not present information of why following parameters are not included in the monitoring plan:

a) Weighted average net calorific value of fuel type i in year y and b) Weighted average CO2 emission factor of fuel type i in year y, to determine the CO2 emission coefficient COEFi,y as per Tool to calculate project or leakage CO2 emissions from fossil fuel combustion